Irrigation & flood control tenders in Assam
26 open Irrigation & flood control tenders in Assam, from GeM and central and state e-procurement portals. Closing soonest first, with value, EMD and documents.
- Irrigation & flood control13 hours left
Supply of geo-textile sheets for flood fighting, Water Resources Department, Zone A, Kamrup Metro, Assam, for 2026-27
Geo-textile sheets for flood fighting supplied within 60 days; two covers bid; Class I registration needed; open tender
Kamrup Metro, Kamrup Metro district, Assam
Chief Engineer - DoWR
₹1.66 croreCloses 18 Nov, 2:00 pm - Irrigation & flood control13 hours left
Protection of Khatalguri and Sutimukh areas from the flood devastation of river Charikariah river
Work period 2 months; open tender in two covers (technical and financial); II and above registration needed; EMD exemption allowed
Dhakuakhana, Lakhimpur district, Assam
Chief Engineer - DoWR
₹19.91 lakhCloses 18 Nov, 2:00 pm - Irrigation & flood control2 days left
Anti-erosion measures to protect upstream Aminpara village from Champabati river erosion on right bank, Kokrajhar, Assam
Anti-erosion works on the right bank of the Champabati river near Aminpara village; open tender in two covers; eligibility criteria apply
Kokrajhar, Kokrajhar district, Assam
Addl.CE cum CHD-Kokrajhar-WRD-BTC
₹2.93 croreCloses 20 Nov, 3:30 pm - Irrigation & flood control5 days left
LIS schemes at Sarupathar LAC under RIDF XXXII (NABARD), 2026-27, Golaghat Sarupathar Division I, Package 1, Assam
LIS schemes at three points under Golaghat Sarupathar Division I for 540 days; open tender in two covers; I-A class registration needed
Sarupathar, Golaghat district, Assam
Chief Engineer(Major)-Irrigation Dept
₹24.34 croreCloses 23 Nov, 1:00 pm - Irrigation & flood control5 days left
ELIS from Kulshi River at Makeli, Palasbari LAC under RIDF-XXXII (NABARD), 2026-27, Palasbari-Jalukbari Division I, Package 3, Assam
ELIS lift irrigation work from Kulshi River for 540 days; open tender in two covers; I-A class registration needed
Kamrup, Kamrup district, Assam
Chief Engineer(Major)-Irrigation Dept
₹28.43 croreCloses 23 Nov, 1:00 pm - Irrigation & flood control5 days left
EELIS works on Kopili river at Morigaon under Jagiroad LAC, Irrigation Department, Assam, 540 days
EELIS works along Kopili river from Mantabori, Uttar Dharamtul, Bhalukaguri, Chanuabori to Domal under RIDF-XXXII (NABARD); 540 days; open tender in two covers; I-A class registration needed
Marigaon, Marigaon district, Assam
Chief Engineer(Major)-Irrigation Dept
₹48.72 croreCloses 23 Nov, 1:00 pm - Irrigation & flood control5 days left
Construction of RCC flood wall along Khanajan Channel, NH 27 to outfall, Kamrup Metro, Assam
RCC flood wall with allied works in phase I for 450 days; open tender in two covers (technical and financial); class I-A registration needed
Kamrup Metro, Kamrup Metro district, Assam
Chief Engineer - DoWR
₹20.46 croreCloses 23 Nov, 2:00 pm - Irrigation & flood control5 days left
Raising and strengthening of Noanadi right bank embankment from Bezpara to NH15, Darrang, Assam
Raising and strengthening of embankment with anti-erosion measures in different reaches and channel cutting at Garakhiya Mandir; 450-day period; single cover; I class
Darrang, Darrang district, Assam
Chief Engineer - DoWR
₹8.01 croreCloses 23 Nov, 2:00 pm - Irrigation & flood control5 days left
Anti-erosion measures at Singra R/B embankment, Upadhyay Chuburi to railway line, North Lakhimpur, Assam
Anti-erosion works on Singra embankment for 365 days; open tender in two covers (technical and financial); class I registration needed
North Lakhimpur, Lakhimpur district, Assam
Chief Engineer - DoWR
₹3.79 croreCloses 23 Nov, 2:00 pm - Irrigation & flood control5 days left
Construction of Suklai right bank embankment from Bhola Batabari to Suklai headworks, Tamulpur, Assam
Suklai right bank embankment from Bhola Batabari to Suklai headworks; work period 365 days; class I registration needed; open tender in two covers
Tamulpur, Tamulpur district, Assam
Chief Engineer - DoWR
₹3.5 croreCloses 23 Nov, 2:00 pm - Irrigation & flood control7 days left
Construction of RCC flood wall along Khanajan Channel left bank from NH 27 to outfall, Kamrup Metro, Assam
RCC flood wall with allied works, phase II; work period 450 days; class I registration needed; open tender in two covers
Kamrup Metro, Kamrup Metro district, Assam
Chief Engineer - DoWR
₹23.45 croreCloses 25 Nov, 2:00 pm - Irrigation & flood control9 days left
Construction of new embankment on left bank of Sessa river, Phuta-Bhog to PWD road, Phase II Package 1, North Lakhimpur, Assam
New embankment from Sessa PWD bridge to PWD road at Phuta-Bhog for 450 days; two covers bid; Class I registration needed; open tender
North Lakhimpur, Lakhimpur district, Assam
Chief Engineer - DoWR
₹7 croreCloses 27 Nov, 2:00 pm - Irrigation & flood control9 days left
Construction of new embankment on left bank of Sessa river, Phuta-Bhog to PWD road, Phase II Package 2, North Lakhimpur, Assam
New embankment from Sessa PWD bridge to PWD road at Phuta-Bhog for 365 days; two covers bid; Class I registration needed; open tender
North Lakhimpur, Lakhimpur district, Assam
Chief Engineer - DoWR
₹2.56 croreCloses 27 Nov, 2:00 pm - Irrigation & flood control9 days left
Pro-siltation works at vulnerable river reaches in Tamulpur district, Department of Water Resources, Assam
Pro-siltation works at several vulnerable reaches; work period 365 days; open tender in two covers (technical and financial); I class registration needed
Tamulpur, Tamulpur district, Assam
Chief Engineer - DoWR
₹4 croreCloses 27 Nov, 2:00 pm - Consultancy & advisory10 days left
Consultancy Services for Comprehensive Assesment and Augmentation of Flood Protection Measures at Dinnjan MIL STN
Work period 6 months; open tender in two covers (technical and financial); EMD exemption allowed
Tinsukia, Tinsukia district, Assam
GE Dinjan - MES
₹8.8 lakhCloses 28 Nov, 6:00 pm - Irrigation & flood control12 days left
Flood damage restoration and conservation of 7 archaeological sites in Sivasagar and Charaideo, Assam
Flood damage restoration and conservation of 7 archaeological sites; 90 days; two-cover open tender; tenderer class others
Charaideo, Charaideo district, Assam
Directorate of Archaeology
₹21 lakhCloses 30 Nov, 12:00 pm - Irrigation & flood control15 days left
LIS from River Dikrong at Rongonadi Mouza under SOPD-G 2026-27, Lakhimpur-Rongonadi-Bihpuria Division, Package 4, Assam
Lift irrigation scheme from River Dikrong under SOPD-G; 365 days work period; two covers (technical and financial); I-A class registration needed; open tender
Kamrup, Kamrup district, Assam
Chief Engineer(Major)-Irrigation Dept
₹29.41 croreCloses 3 Dec, 1:00 pm - Irrigation & flood control15 days left
Construction of Bankal-Path IS, LIS from River Diyung at Diyungbra area and Dismaihadi Irrigation Scheme under SOPD-G for the year 2026-27
Work period 1 year; open tender in two covers (technical and financial); I-A registration needed; EMD exemption allowed
Dima Hasao, Dima Hasao district, Assam
Chief Engineer(Major)-Irrigation Dept
₹34.91 croreCloses 3 Dec, 1:00 pm - Irrigation & flood control15 days left
Green energy based irrigation infrastructure (mobile lift IS and cart-mounted IS) under Chamaria LAC, Boko Chaygaon-Chamaria Division, Package 3, Assam
Green energy based mobile and cart-mounted irrigation structures under SOPD-G; 365 days work period; two covers (technical and financial); I-A class registration needed
Kamrup, Kamrup district, Assam
Chief Engineer(Major)-Irrigation Dept
₹30.05 croreCloses 3 Dec, 1:00 pm - Irrigation & flood control15 days left
Integrated Kamalpur ELIS (5 points) under SOPD-G 2026-27, Rangia-Kamalpur Division, Package 6, Assam
Integrated Kamalpur ELIS works under SOPD-G; 365 days work period; two covers (technical and financial); I-A class registration needed; open tender
Rangia, Kamrup district, Assam
Chief Engineer(Major)-Irrigation Dept
₹23.68 croreCloses 3 Dec, 1:00 pm - Irrigation & flood control15 days left
Anti-erosion measures to protect Desang Bund left bank from Bahgarh to AT Road, Barpatragaon area, Sivasagar, Assam
Anti-erosion works along the left bank of Desang Bund from Bahgarh to AT Road; 365 days; open tender in two covers (technical and financial); Class I registration
Sivasagar, Sivasagar district, Assam
Chief Engineer - DoWR
₹4.95 croreCloses 3 Dec, 2:00 pm - Irrigation & flood control15 days left
Anti-erosion measures along Desang bund left bank from Bahgarh to AT Road at Duwari Gaon, Sivasagar, Assam
Anti-erosion works along the left bank of Desang bund from Bahgarh to A.T. Road; 365 days; open tender in two covers (technical and financial); Class I registration
Sivasagar, Sivasagar district, Assam
Chief Engineer - DoWR
₹2.47 croreCloses 3 Dec, 2:00 pm - Irrigation & flood control15 days left
Anti-erosion works to protect Jalikura village from Champabati river erosion on right bank, Water Resources Department, Dhubri, Assam
Anti-erosion measures for Jalikura village and adjoining areas on right bank of Champabati river; 365 days; open tender in two covers; Class I registration
Dhubri, Dhubri district, Assam
Chief Engineer - DoWR
₹4.45 croreCloses 3 Dec, 2:00 pm - Irrigation & flood control19 days left
Anti-erosion measures to protect Desang bund right bank from AT Road to Dhaiali at Koibatra Doloni, Sivasagar, Assam
Anti-erosion works on Desang bund right bank for 365 days; open tender in two covers; Class I registration needed
Sivasagar, Sivasagar district, Assam
Chief Engineer - DoWR
₹7.44 croreCloses 7 Dec, 2:00 pm - Parks & beautification19 days left
Rejuvenation and Bioremediation of Silsako Beel, Guwahati, Assam under PMKSY HKKP RRR Construction of Embankment, Geo Bag Protection, Culverts
Work period 9 months; open tender in two covers (technical and financial); EMD exemption allowed
Kamrup, Kamrup district, Assam
Guwahati Development Department - GMDA
₹19.77 croreCloses 7 Dec, 2:00 pm - Irrigation & flood control19 days left
Anti-erosion measures to protect Ghumaijhar area from erosion of river Ajagar, Goalpara, Assam
Anti-erosion works along river Ajagar at Ghumaijhar; 365 days; open tender in two covers (technical and financial); tenderer class I registration needed
Goalpara, Goalpara district, Assam
Chief Engineer - DoWR
₹4.46 croreCloses 7 Dec, 2:00 pm
Other work in Assam
- Buildings 408
- Other goods & services 331
- Electrical 239
- Spares & parts 222
- IT & electronics 187
- Vehicles & machinery 178
- Furniture & supplies 114
- Repair & maintenance 106
- Roads & bridges 91
- Medical & healthcare 88
- Steel, cement & hardware 75
- Consultancy & advisory 64
- Appliances 60
- Sanitation & waste 55
- Manpower & services 54
- Lab, testing & survey equipment 50
- Chemicals & gases 48
- Uniforms, textiles & footwear 47
- Food & provisions 45
- Water supply 37
- Solar & energy 35
- Events & catering 31
- Drains & sewerage 26
- Printing & signage 25
- Fuel, oils & lubricants 21
- Agriculture 17
- Defence, security & safety gear 17
- Parks & beautification 11
- Planning, GIS & survey 7
- Toll & fee collection 4
- Insurance & banking 3
- Shops, plots & auctions 3