Skip to content
WooTenders

Irrigation & flood control tenders in Assam

26 open Irrigation & flood control tenders in Assam, from GeM and central and state e-procurement portals. Closing soonest first, with value, EMD and documents.

  1. Irrigation & flood control13 hours left

    Supply of geo-textile sheets for flood fighting, Water Resources Department, Zone A, Kamrup Metro, Assam, for 2026-27

    Geo-textile sheets for flood fighting supplied within 60 days; two covers bid; Class I registration needed; open tender

    Kamrup Metro, Kamrup Metro district, Assam

    Chief Engineer - DoWR

    ₹1.66 croreCloses 18 Nov, 2:00 pm
  2. Irrigation & flood control13 hours left

    Protection of Khatalguri and Sutimukh areas from the flood devastation of river Charikariah river

    Work period 2 months; open tender in two covers (technical and financial); II and above registration needed; EMD exemption allowed

    Dhakuakhana, Lakhimpur district, Assam

    Chief Engineer - DoWR

    ₹19.91 lakhCloses 18 Nov, 2:00 pm
  3. Irrigation & flood control2 days left

    Anti-erosion measures to protect upstream Aminpara village from Champabati river erosion on right bank, Kokrajhar, Assam

    Anti-erosion works on the right bank of the Champabati river near Aminpara village; open tender in two covers; eligibility criteria apply

    Kokrajhar, Kokrajhar district, Assam

    Addl.CE cum CHD-Kokrajhar-WRD-BTC

    ₹2.93 croreCloses 20 Nov, 3:30 pm
  4. Irrigation & flood control5 days left

    LIS schemes at Sarupathar LAC under RIDF XXXII (NABARD), 2026-27, Golaghat Sarupathar Division I, Package 1, Assam

    LIS schemes at three points under Golaghat Sarupathar Division I for 540 days; open tender in two covers; I-A class registration needed

    Sarupathar, Golaghat district, Assam

    Chief Engineer(Major)-Irrigation Dept

    ₹24.34 croreCloses 23 Nov, 1:00 pm
  5. Irrigation & flood control5 days left

    ELIS from Kulshi River at Makeli, Palasbari LAC under RIDF-XXXII (NABARD), 2026-27, Palasbari-Jalukbari Division I, Package 3, Assam

    ELIS lift irrigation work from Kulshi River for 540 days; open tender in two covers; I-A class registration needed

    Kamrup, Kamrup district, Assam

    Chief Engineer(Major)-Irrigation Dept

    ₹28.43 croreCloses 23 Nov, 1:00 pm
  6. Irrigation & flood control5 days left

    EELIS works on Kopili river at Morigaon under Jagiroad LAC, Irrigation Department, Assam, 540 days

    EELIS works along Kopili river from Mantabori, Uttar Dharamtul, Bhalukaguri, Chanuabori to Domal under RIDF-XXXII (NABARD); 540 days; open tender in two covers; I-A class registration needed

    Marigaon, Marigaon district, Assam

    Chief Engineer(Major)-Irrigation Dept

    ₹48.72 croreCloses 23 Nov, 1:00 pm
  7. Irrigation & flood control5 days left

    Construction of RCC flood wall along Khanajan Channel, NH 27 to outfall, Kamrup Metro, Assam

    RCC flood wall with allied works in phase I for 450 days; open tender in two covers (technical and financial); class I-A registration needed

    Kamrup Metro, Kamrup Metro district, Assam

    Chief Engineer - DoWR

    ₹20.46 croreCloses 23 Nov, 2:00 pm
  8. Irrigation & flood control5 days left

    Raising and strengthening of Noanadi right bank embankment from Bezpara to NH15, Darrang, Assam

    Raising and strengthening of embankment with anti-erosion measures in different reaches and channel cutting at Garakhiya Mandir; 450-day period; single cover; I class

    Darrang, Darrang district, Assam

    Chief Engineer - DoWR

    ₹8.01 croreCloses 23 Nov, 2:00 pm
  9. Irrigation & flood control5 days left

    Anti-erosion measures at Singra R/B embankment, Upadhyay Chuburi to railway line, North Lakhimpur, Assam

    Anti-erosion works on Singra embankment for 365 days; open tender in two covers (technical and financial); class I registration needed

    North Lakhimpur, Lakhimpur district, Assam

    Chief Engineer - DoWR

    ₹3.79 croreCloses 23 Nov, 2:00 pm
  10. Irrigation & flood control5 days left

    Construction of Suklai right bank embankment from Bhola Batabari to Suklai headworks, Tamulpur, Assam

    Suklai right bank embankment from Bhola Batabari to Suklai headworks; work period 365 days; class I registration needed; open tender in two covers

    Tamulpur, Tamulpur district, Assam

    Chief Engineer - DoWR

    ₹3.5 croreCloses 23 Nov, 2:00 pm
  11. Irrigation & flood control7 days left

    Construction of RCC flood wall along Khanajan Channel left bank from NH 27 to outfall, Kamrup Metro, Assam

    RCC flood wall with allied works, phase II; work period 450 days; class I registration needed; open tender in two covers

    Kamrup Metro, Kamrup Metro district, Assam

    Chief Engineer - DoWR

    ₹23.45 croreCloses 25 Nov, 2:00 pm
  12. Irrigation & flood control9 days left

    Construction of new embankment on left bank of Sessa river, Phuta-Bhog to PWD road, Phase II Package 1, North Lakhimpur, Assam

    New embankment from Sessa PWD bridge to PWD road at Phuta-Bhog for 450 days; two covers bid; Class I registration needed; open tender

    North Lakhimpur, Lakhimpur district, Assam

    Chief Engineer - DoWR

    ₹7 croreCloses 27 Nov, 2:00 pm
  13. Irrigation & flood control9 days left

    Construction of new embankment on left bank of Sessa river, Phuta-Bhog to PWD road, Phase II Package 2, North Lakhimpur, Assam

    New embankment from Sessa PWD bridge to PWD road at Phuta-Bhog for 365 days; two covers bid; Class I registration needed; open tender

    North Lakhimpur, Lakhimpur district, Assam

    Chief Engineer - DoWR

    ₹2.56 croreCloses 27 Nov, 2:00 pm
  14. Irrigation & flood control9 days left

    Pro-siltation works at vulnerable river reaches in Tamulpur district, Department of Water Resources, Assam

    Pro-siltation works at several vulnerable reaches; work period 365 days; open tender in two covers (technical and financial); I class registration needed

    Tamulpur, Tamulpur district, Assam

    Chief Engineer - DoWR

    ₹4 croreCloses 27 Nov, 2:00 pm
  15. Consultancy & advisory10 days left

    Consultancy Services for Comprehensive Assesment and Augmentation of Flood Protection Measures at Dinnjan MIL STN

    Work period 6 months; open tender in two covers (technical and financial); EMD exemption allowed

    Tinsukia, Tinsukia district, Assam

    GE Dinjan - MES

    ₹8.8 lakhCloses 28 Nov, 6:00 pm
  16. Irrigation & flood control12 days left

    Flood damage restoration and conservation of 7 archaeological sites in Sivasagar and Charaideo, Assam

    Flood damage restoration and conservation of 7 archaeological sites; 90 days; two-cover open tender; tenderer class others

    Charaideo, Charaideo district, Assam

    Directorate of Archaeology

    ₹21 lakhCloses 30 Nov, 12:00 pm
  17. Irrigation & flood control15 days left

    LIS from River Dikrong at Rongonadi Mouza under SOPD-G 2026-27, Lakhimpur-Rongonadi-Bihpuria Division, Package 4, Assam

    Lift irrigation scheme from River Dikrong under SOPD-G; 365 days work period; two covers (technical and financial); I-A class registration needed; open tender

    Kamrup, Kamrup district, Assam

    Chief Engineer(Major)-Irrigation Dept

    ₹29.41 croreCloses 3 Dec, 1:00 pm
  18. Irrigation & flood control15 days left

    Construction of Bankal-Path IS, LIS from River Diyung at Diyungbra area and Dismaihadi Irrigation Scheme under SOPD-G for the year 2026-27

    Work period 1 year; open tender in two covers (technical and financial); I-A registration needed; EMD exemption allowed

    Dima Hasao, Dima Hasao district, Assam

    Chief Engineer(Major)-Irrigation Dept

    ₹34.91 croreCloses 3 Dec, 1:00 pm
  19. Irrigation & flood control15 days left

    Green energy based irrigation infrastructure (mobile lift IS and cart-mounted IS) under Chamaria LAC, Boko Chaygaon-Chamaria Division, Package 3, Assam

    Green energy based mobile and cart-mounted irrigation structures under SOPD-G; 365 days work period; two covers (technical and financial); I-A class registration needed

    Kamrup, Kamrup district, Assam

    Chief Engineer(Major)-Irrigation Dept

    ₹30.05 croreCloses 3 Dec, 1:00 pm
  20. Irrigation & flood control15 days left

    Integrated Kamalpur ELIS (5 points) under SOPD-G 2026-27, Rangia-Kamalpur Division, Package 6, Assam

    Integrated Kamalpur ELIS works under SOPD-G; 365 days work period; two covers (technical and financial); I-A class registration needed; open tender

    Rangia, Kamrup district, Assam

    Chief Engineer(Major)-Irrigation Dept

    ₹23.68 croreCloses 3 Dec, 1:00 pm
  21. Irrigation & flood control15 days left

    Anti-erosion measures to protect Desang Bund left bank from Bahgarh to AT Road, Barpatragaon area, Sivasagar, Assam

    Anti-erosion works along the left bank of Desang Bund from Bahgarh to AT Road; 365 days; open tender in two covers (technical and financial); Class I registration

    Sivasagar, Sivasagar district, Assam

    Chief Engineer - DoWR

    ₹4.95 croreCloses 3 Dec, 2:00 pm
  22. Irrigation & flood control15 days left

    Anti-erosion measures along Desang bund left bank from Bahgarh to AT Road at Duwari Gaon, Sivasagar, Assam

    Anti-erosion works along the left bank of Desang bund from Bahgarh to A.T. Road; 365 days; open tender in two covers (technical and financial); Class I registration

    Sivasagar, Sivasagar district, Assam

    Chief Engineer - DoWR

    ₹2.47 croreCloses 3 Dec, 2:00 pm
  23. Irrigation & flood control15 days left

    Anti-erosion works to protect Jalikura village from Champabati river erosion on right bank, Water Resources Department, Dhubri, Assam

    Anti-erosion measures for Jalikura village and adjoining areas on right bank of Champabati river; 365 days; open tender in two covers; Class I registration

    Dhubri, Dhubri district, Assam

    Chief Engineer - DoWR

    ₹4.45 croreCloses 3 Dec, 2:00 pm
  24. Irrigation & flood control19 days left

    Anti-erosion measures to protect Desang bund right bank from AT Road to Dhaiali at Koibatra Doloni, Sivasagar, Assam

    Anti-erosion works on Desang bund right bank for 365 days; open tender in two covers; Class I registration needed

    Sivasagar, Sivasagar district, Assam

    Chief Engineer - DoWR

    ₹7.44 croreCloses 7 Dec, 2:00 pm
  25. Parks & beautification19 days left

    Rejuvenation and Bioremediation of Silsako Beel, Guwahati, Assam under PMKSY HKKP RRR Construction of Embankment, Geo Bag Protection, Culverts

    Work period 9 months; open tender in two covers (technical and financial); EMD exemption allowed

    Kamrup, Kamrup district, Assam

    Guwahati Development Department - GMDA

    ₹19.77 croreCloses 7 Dec, 2:00 pm
  26. Irrigation & flood control19 days left

    Anti-erosion measures to protect Ghumaijhar area from erosion of river Ajagar, Goalpara, Assam

    Anti-erosion works along river Ajagar at Ghumaijhar; 365 days; open tender in two covers (technical and financial); tenderer class I registration needed

    Goalpara, Goalpara district, Assam

    Chief Engineer - DoWR

    ₹4.46 croreCloses 7 Dec, 2:00 pm

Other work in Assam