NWR-Dharoi Canal Division no 3 Visnagar: open tenders in Gujarat
13 open tenders from NWR-Dharoi Canal Division no 3 Visnagar in Gujarat, closing soonest first.
- Consultancy & advisory12 days left
Consultancy work for Survey, preparing Design, Plans, Maps, Estimate and D.T.P. for Existing Canal Syphone Structure of SRBMC Between Ch. 20.91 Km. to 39.00 Km
Work period 2 months; EMD exemption allowed
Gujarat
NWR-Dharoi Canal Division no 3 Visnagar
₹48.03 lakhCloses 25 Nov, 6:00 pm - Irrigation & flood control12 days left
Provision of Footbridge and Canal Repairing work of Sub Minor SM29R and SM39R of M4L
Work period 4 months; EMD exemption allowed
Gujarat
NWR-Dharoi Canal Division no 3 Visnagar
₹48.73 lakhCloses 25 Nov, 6:00 pm - Irrigation & flood control12 days left
Protection Work at Main Canal SRBMC on Various Chainages and Extension, Renovation and Modernisation Work of Vadnagar Distributory
Work period 4 months; EMD exemption allowed
Gujarat
NWR-Dharoi Canal Division no 3 Visnagar
₹2.32 croreCloses 25 Nov, 6:00 pm - Irrigation & flood control12 days left
Construction of New RCC Box Type Canal Syphone at Ch.1450 M. of B.C.No.3 of S.R.B.M.C
Work period 11 months; EMD exemption allowed
Gujarat
NWR-Dharoi Canal Division no 3 Visnagar
₹95.82 lakhCloses 25 Nov, 6:00 pm - Irrigation & flood control12 days left
Repairing Work of Sub Minor SM15L, SM17R, SM20R & SM23L of Vadnagar Distributory and Tail End Connectivity Work at the end of SM23L of Vadnagar Distributory
Work period 4 months; EMD exemption allowed
Gujarat
NWR-Dharoi Canal Division no 3 Visnagar
₹49.56 lakhCloses 25 Nov, 6:00 pm - Consultancy & advisory12 days left
Consultancy work for under water photography, videography and survey investigation by DGPS of Design of Inlet Strcture and other miscellaneous works
Work period 3 months; EMD exemption allowed
Gujarat
NWR-Dharoi Canal Division no 3 Visnagar
₹24.82 lakhCloses 25 Nov, 6:00 pm - Irrigation & flood control12 days left
Providing Protection and Strengthening Work for Embankment of SRBMC Between Ch. 39.072 to 39.642 Km and Ch. 40.832 to 40.932 km
Work period 6 months; EMD exemption allowed
Gujarat
NWR-Dharoi Canal Division no 3 Visnagar
₹2.44 croreCloses 25 Nov, 6:00 pm - Consultancy & advisory12 days left
Consultancy work for Survey, preparing Design, Plans, Maps, Estimate & D.T.P. for Existing Canal Syphone Structure with Cross Drain
Work period 6 months; EMD exemption allowed
Gujarat
NWR-Dharoi Canal Division no 3 Visnagar
₹31.93 lakhCloses 25 Nov, 6:00 pm - Irrigation & flood control12 days left
Seepage Prevention Work Between Ch. 15360 to 16160 mt. of Ex. Vad. Distry and Construction of Footbridge Ch. 8550 mt. of Ex. Vadnagar Distributory of SRBMC
Work period 2 months; EMD exemption allowed
Gujarat
NWR-Dharoi Canal Division no 3 Visnagar
₹11.88 lakhCloses 25 Nov, 6:00 pm - Roads & bridges12 days left
Construction Work of Box Culvert on Local Drain at Unad Ta. Vadnagar near Survey No. 343
Work period 3 months; EMD exemption allowed
Gujarat
NWR-Dharoi Canal Division no 3 Visnagar
₹22.95 lakhCloses 25 Nov, 6:00 pm - Irrigation & flood control12 days left
Restoration of canal lining, plastering and raising of upstream and downstream of syphon structures from ch. 5870.00 mt to 15150.00 mt. of Branch Canal No. 5
Work period 6 months; EMD exemption allowed
Gujarat
NWR-Dharoi Canal Division no 3 Visnagar
₹1.67 croreCloses 25 Nov, 6:00 pm - Planning, GIS & survey12 days left
Carry out survey and preparation of detailed plans and proposals for Land Acquisition and Demarcation of the remaining submergence land
Work period 3 months; EMD exemption allowed
Gujarat
NWR-Dharoi Canal Division no 3 Visnagar
₹37.46 lakhCloses 25 Nov, 6:00 pm - Irrigation & flood control12 days left
Construction of RCC Barrel Type Canal Syphon Ch. 3210 of Extended Vadnagar Distibutory of Sabarmati Right Bank Main Canal
Work period 3 months; EMD exemption allowed
Gujarat
NWR-Dharoi Canal Division no 3 Visnagar
₹81.43 lakhCloses 25 Nov, 6:00 pm