NWR-Sujlam Suflam Division NO 2: open tenders in Gujarat
10 open tenders from NWR-Sujlam Suflam Division NO 2 in Gujarat, closing soonest first.
- Spares & parts5 days left
Restoration Work for Valve Kundi at Devinapura Ta.district Mehsana of BSPL Network
Work period 3 months; EMD exemption allowed
Gujarat
NWR-Sujlam Suflam Division No 2
₹5.01 lakhCloses 19 Nov, 6:00 pm - Roads & bridges5 days left
Dismentalling of old structure and Construction of new Box culvert on Ch.217.595 & Repairing
Work period 6 months; EMD exemption allowed
Gujarat
NWR-Sujlam Suflam Division No 2
₹21.21 lakhCloses 19 Nov, 6:00 pm - Irrigation & flood control5 days left
Construction of Raising Wall in Mahudi Distributary from Ch.16.00 m to 5607.40 m and Ch. 12013.00 m to 13083.00 m under Dharoi Extended Command Area
Work period 11 months; EMD exemption allowed
Gujarat
NWR-Sujlam Suflam Division No 2
₹1.87 croreCloses 19 Nov, 6:00 pm - Drains & sewerage5 days left
Jungle Clearance and Desilting Work of Dabhadi-Manud Drain Between Ch.6300.00 Mt. to 13390.00 Mt. Ta.Chanasma Dist.Patan
Work period 6 months; EMD exemption allowed
Gujarat
NWR-Sujlam Suflam Division No 2
₹21.65 lakhCloses 19 Nov, 6:00 pm - Irrigation & flood control5 days left
Extension of downstream retaining work and new pipe inlet with retaining wall on Sujlam Suflam spreading canal, Babasana, Patan, Mehsana
Downstream retaining wall extension at Ch. 239.360 km and new pipe inlet with retaining wall upstream at Ch. 239.370 km of Balisana-Babasana canal; 180 days; open tender
Gujarat
NWR-Sujlam Suflam Division No 2
₹49.49 lakhCloses 19 Nov, 6:00 pm - Water supply11 days left
Providing, Fixing & Extending RCC NP-3 Pipe Line for Connecting village Sojintra Tank (S.no.1079), at Village.Sojintra, Ta. Chanasma
Work period 6 months; EMD exemption allowed
Gujarat
NWR-Sujlam Suflam Division No 2
₹43.74 lakhCloses 25 Nov, 6:00 pm - Water supply11 days left
Providing, Fixing & Extending RCC NP-3 Pipe Linefor Connecting Lanva Tanks (Survey No. 19 &8) at village Lanva, Ta. Chanasma
Work period 6 months; EMD exemption allowed
Gujarat
NWR-Sujlam Suflam Division No 2
₹1.7 croreCloses 25 Nov, 6:00 pm - Water supply11 days left
Providing, Fixing & Extending RCC NP-3 Pipe Line for Dabhadi Manud Drain at Village Dabhadi Ta.district Patan
Work period 6 months; EMD exemption allowed
Gujarat
NWR-Sujlam Suflam Division No 2
₹1.1 croreCloses 25 Nov, 6:00 pm - Irrigation & flood control11 days left
Assessment of Storage Capacities of Reservoirs (Bathymetry Survey) of Valasana Barrage Ta. Vadnagar district Mehsana.(2nd Trial)
Work period 3 months; EMD exemption allowed
Gujarat
NWR-Sujlam Suflam Division No 2
₹4.72 lakhCloses 25 Nov, 6:00 pm - Drains & sewerage11 days left
Enhancement work of Dharpur-Borsan Drain by replacing old Pipe type VRB to New RCC Box Culvert at Ch.2000 Mt, 2200 Mt
Work period 11 months; EMD exemption allowed
Gujarat
NWR-Sujlam Suflam Division No 2
₹1.77 croreCloses 25 Nov, 6:00 pm