Skip to content
WooTenders

Irrigation & flood control tenders in Gujarat

229 open Irrigation & flood control tenders in Gujarat, from GeM and central and state e-procurement portals. Closing soonest first, with value, EMD and documents.

  1. Irrigation & flood control5 days left

    Repairing and Restoration work on @ VRB Ch.3420 mt of Right bank main canal of HISD

    Work period 1 month; EMD exemption allowed

    Panch Mahals, Panch Mahals district, Gujarat

    NWR-Panam Project Division

    ₹9.92 lakhCloses 23 Nov, 6:00 pm
  2. Roads & bridges5 days left

    Constructing New Box Culvert in place of Existing VRB at Ch. 760 m, Ch.1580 m and Ch.2554 m of Vihan Minor Ex.Surat Branch Canal under Jurisdiction

    Work period 6 months; EMD exemption allowed

    Surat, Surat district, Gujarat

    NWR-Surat Canal Division

    ₹45.06 lakhCloses 23 Nov, 6:00 pm
  3. Roads & bridges5 days left

    Construction of bridge near Dada Bhagwan Trimandir on Hazira branch canal, Abrama village, Surat New East (Sarthana) zone

    Bridge between Dukhiyana Darbar Road and the DFCC railway line; open tender; second attempt, work no. 01

    Surat, Surat district, Gujarat

    SMC-Surat Mahanagar Seva Sadan

    ₹3.06 croreCloses 23 Nov, 6:00 pm
  4. Consultancy & advisory5 days left

    Third Party Inspection for the Services of Project Management, Design review, Construction supervision and Inspection and Testing of materials, Machinery

    Work period 720 days; EMD exemption allowed

    Arvalli, Arvalli district, Gujarat

    NWR-Aravalli Irrigation Division - Modasa

    ₹1.83 croreCloses 23 Nov, 6:06 pm
  5. Drains & sewerage5 days left

    Riverfront Development Project Phase-I of Amreli, district Amreli, Gujarat” under SJMMSVY (Re invitation): Construction

    Work period 540 days

    Gandhinagar, Gandhinagar district, Gujarat

    GUDC-Project Department

    ₹73.94 croreCloses 23 Nov, 6:30 pm
  6. Irrigation & flood control6 days left

    Construction of Nani sadhali checkdam across River Orsang tri. near village Nani sadhali Ta.Chhota Udepur, district Chhota Udepur

    Work period 6 months

    Chhotaudepur, Chhotaudepur district, Gujarat

    NWR-Irrigation Project Division No. 2 Bodeli

    ₹1.64 croreCloses 24 Nov, 6:00 pm
  7. Irrigation & flood control6 days left

    Construction of Chisadiya checkdam across River Orsang Tributary near village Chisadiya Ta.Chhota Udepur, district Chhota Udepur

    Work period 6 months

    Chhotaudepur, Chhotaudepur district, Gujarat

    NWR-Irrigation Project Division No. 2 Bodeli

    ₹95.51 lakhCloses 24 Nov, 6:00 pm
  8. Electrical7 days left

    Operation and Maintenance for 02 (Two) years of all the equipments including all Mechanical, Civil, Electrical and C&I etc.works

    Work period 720 days; EMD exemption allowed

    Vadodara, Vadodara district, Gujarat

    Ssnnl-Electrical & Mechanical Division, Vadodara

    ₹90.36 lakhCloses 25 Nov, 6:00 pm
  9. Irrigation & flood control7 days left

    Consultancy work for Survey, preparing Design, Plans, Maps, Estimate and D.T.P. for Existing Canal Syphone Structure of SRBMC Between Ch. 20.91 Km. to 39.00 Km

    Work period 2 months; EMD exemption allowed

    Mahesana, Mahesana district, Gujarat

    NWR-Dharoi Canal Division no 3 Visnagar

    ₹48.03 lakhCloses 25 Nov, 6:00 pm
  10. Irrigation & flood control7 days left

    Construction of new HR in place of old HR No. 5-6 on Vadala tank bank (2 nos.), NWR Shedhi Irrigation Division Nadiad

    Construction of 2 new HR structures replacing old ones on Vadala tank bank; 180-day work period; second attempt tender

    Nadiad, Kheda district, Gujarat

    NWR-Shedhi Irrigation Division Nadiad

    ₹18.31 lakhCloses 25 Nov, 6:00 pm
  11. Water supply7 days left

    Providing, Fixing & Extending RCC NP-3 Pipe Line for Connecting village Sojintra Tank (S.no.1079), at Village.Sojintra, Ta. Chanasma

    Work period 6 months; EMD exemption allowed

    Patan, Patan district, Gujarat

    NWR-Sujlam Suflam Division No 2

    ₹43.74 lakhCloses 25 Nov, 6:00 pm
  12. Irrigation & flood control7 days left

    Modernisation of H.R. gates at various chainages of Khumarvad distributary, Shedhi branch canal, Nadiad

    Modernisation of H.R. gates at various chainages of Khumarvard distributary; work period 180 days; open tender

    Nadiad, Kheda district, Gujarat

    NWR-Shedhi Irrigation Division Nadiad

    ₹46.89 lakhCloses 25 Nov, 6:00 pm
  13. Irrigation & flood control7 days left

    Modernization of Minor 8/L Ex. Varsola Distry Including Structures

    Work period 6 months; EMD exemption allowed

    Nadiad, Kheda district, Gujarat

    NWR-Shedhi Irrigation Division Nadiad

    ₹49.33 lakhCloses 25 Nov, 6:00 pm
  14. Irrigation & flood control7 days left

    Maintenance and repairs for Dudhai Sub Branch Canal Ch. 0.00 Km to 23.025 Km. and Its Networks

    Work period 12 months; EMD exemption allowed

    Kachchh, Kachchh district, Gujarat

    SSNNL-KBC Division No 2-6 Bhachau

    ₹1.13 croreCloses 25 Nov, 6:00 pm
  15. Irrigation & flood control7 days left

    Provision of Footbridge and Canal Repairing work of Sub Minor SM29R and SM39R of M4L

    Work period 4 months; EMD exemption allowed

    Mahesana, Mahesana district, Gujarat

    NWR-Dharoi Canal Division no 3 Visnagar

    ₹48.73 lakhCloses 25 Nov, 6:00 pm
  16. Irrigation & flood control7 days left

    Restoration of Canal chowki at Ch.54010 mt and Ch.57050 mt of Shedhi Branch Canal.(2nd attempt)

    Work period 6 months; EMD exemption allowed

    Nadiad, Kheda district, Gujarat

    NWR-Shedhi Irrigation Division Nadiad

    ₹28.41 lakhCloses 25 Nov, 6:00 pm
  17. Irrigation & flood control7 days left

    Protection Work at Main Canal SRBMC on Various Chainages and Extension, Renovation and Modernisation Work of Vadnagar Distributory

    Work period 4 months; EMD exemption allowed

    Mahesana, Mahesana district, Gujarat

    NWR-Dharoi Canal Division no 3 Visnagar

    ₹2.32 croreCloses 25 Nov, 6:00 pm
  18. Water supply7 days left

    Comprehensive Operation & Maintenance of Civil & Electromechanical assets such as Intakewell, Elevated service reservoirs (E.S.R), HGLR, sump

    Covers 0 habitations; work period 6 months

    Bharuch, Bharuch district, Gujarat

    GWSSB-Public Health Works Division, Bharuch

    ₹71.53 lakhCloses 25 Nov, 6:00 pm
  19. Irrigation & flood control7 days left

    Construction of New RCC Box Type Canal Syphone at Ch.1450 M. of B.C.No.3 of S.R.B.M.C

    Work period 11 months; EMD exemption allowed

    Mahesana, Mahesana district, Gujarat

    NWR-Dharoi Canal Division no 3 Visnagar

    ₹95.82 lakhCloses 25 Nov, 6:00 pm
  20. Water supply7 days left

    Providing, Fixing & Extending RCC NP-3 Pipe Linefor Connecting Lanva Tanks (Survey No. 19 &8) at village Lanva, Ta. Chanasma

    Work period 6 months; EMD exemption allowed

    Patan, Patan district, Gujarat

    NWR-Sujlam Suflam Division No 2

    ₹1.7 croreCloses 25 Nov, 6:00 pm
  21. Irrigation & flood control7 days left

    Constructing New RCC Box type V.R.B. on Goblaj Vahela near village: Rangpura & Restoration of HR Cum VRB of Kheda Kans at Ch.0 mt

    Work period 6 months; EMD exemption allowed

    Nadiad, Kheda district, Gujarat

    NWR-Shedhi Irrigation Division Nadiad

    ₹30.62 lakhCloses 25 Nov, 6:00 pm
  22. Drains & sewerage7 days left

    Restoration of structures at Ch.418 mt, 1400 mt and providing new pipe drain syphone at Ch.1330 mt of Nagwal SD Ex. Bordi Distry

    Work period 6 months; EMD exemption allowed

    Nadiad, Kheda district, Gujarat

    NWR-Shedhi Irrigation Division Nadiad

    ₹31.72 lakhCloses 25 Nov, 6:00 pm
  23. Irrigation & flood control7 days left

    Installation of various instruments and monitoring system at Thebi Irrigation Scheme (5th Attempt)

    Work period 6 months; EMD exemption allowed

    Amreli, Amreli district, Gujarat

    NWR-Irrigation Sub Division No.2 - AMRELI

    ₹5.38 lakhCloses 25 Nov, 6:00 pm
  24. Irrigation & flood control7 days left

    Construction of a new RCC Canal syphon in place of the existing Canal syphon at Ch.9546 mt & Ch.10020 mt on the Mahisa Distributary

    Work period 9 months; EMD exemption allowed

    Nadiad, Kheda district, Gujarat

    NWR-Shedhi Irrigation Division Nadiad

    ₹43.57 lakhCloses 25 Nov, 6:00 pm
  25. Irrigation & flood control7 days left

    Repairing Work of Sub Minor SM15L, SM17R, SM20R & SM23L of Vadnagar Distributory and Tail End Connectivity Work at the end of SM23L of Vadnagar Distributory

    Work period 4 months; EMD exemption allowed

    Mahesana, Mahesana district, Gujarat

    NWR-Dharoi Canal Division no 3 Visnagar

    ₹49.56 lakhCloses 25 Nov, 6:00 pm
  26. Irrigation & flood control7 days left

    Consultancy work for under water photography, videography and survey investigation by DGPS of Design of Inlet Strcture and other miscellaneous works

    Work period 3 months; EMD exemption allowed

    Mahesana, Mahesana district, Gujarat

    NWR-Dharoi Canal Division no 3 Visnagar

    ₹24.82 lakhCloses 25 Nov, 6:00 pm
  27. Irrigation & flood control7 days left

    Providing Protection and Strengthening Work for Embankment of SRBMC Between Ch. 39.072 to 39.642 Km and Ch. 40.832 to 40.932 km

    Work period 6 months; EMD exemption allowed

    Mahesana, Mahesana district, Gujarat

    NWR-Dharoi Canal Division no 3 Visnagar

    ₹2.44 croreCloses 25 Nov, 6:00 pm
  28. Irrigation & flood control7 days left

    Restoration of Canal chowki at Ch.61735 mt and Ch.66790 mt of Shedhi Branch Canal

    Work period 6 months; EMD exemption allowed

    Nadiad, Kheda district, Gujarat

    NWR-Shedhi Irrigation Division Nadiad

    ₹28.41 lakhCloses 25 Nov, 6:00 pm
  29. Water supply7 days left

    Providing, Fixing & Extending RCC NP-3 Pipe Line for Dabhadi Manud Drain at Village Dabhadi Ta.district Patan

    Work period 6 months; EMD exemption allowed

    Patan, Patan district, Gujarat

    NWR-Sujlam Suflam Division No 2

    ₹1.1 croreCloses 25 Nov, 6:00 pm
  30. Consultancy & advisory7 days left

    Consultancy work for Survey, preparing Design, Plans, Maps, Estimate & D.T.P. for Existing Canal Syphone Structure with Cross Drain

    Work period 6 months; EMD exemption allowed

    Mahesana, Mahesana district, Gujarat

    NWR-Dharoi Canal Division no 3 Visnagar

    ₹31.93 lakhCloses 25 Nov, 6:00 pm
  31. Irrigation & flood control7 days left

    Assessment of Storage Capacities of Reservoirs (Bathymetry Survey) of Valasana Barrage Ta. Vadnagar district Mehsana.(2nd Trial)

    Work period 3 months; EMD exemption allowed

    Mahesana, Mahesana district, Gujarat

    NWR-Sujlam Suflam Division No 2

    ₹4.72 lakhCloses 25 Nov, 6:00 pm
  32. Irrigation & flood control7 days left

    Seepage Prevention Work Between Ch. 15360 to 16160 mt. of Ex. Vad. Distry and Construction of Footbridge Ch. 8550 mt. of Ex. Vadnagar Distributory of SRBMC

    Work period 2 months; EMD exemption allowed

    Mahesana, Mahesana district, Gujarat

    NWR-Dharoi Canal Division no 3 Visnagar

    ₹11.88 lakhCloses 25 Nov, 6:00 pm
  33. Irrigation & flood control7 days left

    Maintenance and repairs for Wandhiya Sub Branch Canal Ch 0.00 km to 23.740 km and its network

    Work period 12 months; EMD exemption allowed

    Kachchh, Kachchh district, Gujarat

    SSNNL-KBC Division No 2-6 Bhachau

    ₹1.1 croreCloses 25 Nov, 6:00 pm
  34. Irrigation & flood control7 days left

    Maintenance and repairs for Kachchh Branch Canal Ch. 170.740 Km to 205.986 Km. and Its Networks

    Work period 12 months; EMD exemption allowed

    Kachchh, Kachchh district, Gujarat

    SSNNL-KBC Division No 2-6 Bhachau

    ₹2.63 croreCloses 25 Nov, 6:00 pm
  35. Irrigation & flood control7 days left

    Repairing & Maintenance work of Left Bank Main Canal of Nirona Medium Irrigation Scheme, Taluka-Nakhatrana, District:-Kutch

    Work period 540 days; EMD exemption allowed

    Kachchh, Kachchh district, Gujarat

    NWR-Salinity Control Division, Bhuj

    ₹3.54 croreCloses 25 Nov, 6:00 pm
  36. Roads & bridges7 days left

    Construction Work of Box Culvert on Local Drain at Unad Ta. Vadnagar near Survey No. 343

    Work period 3 months; EMD exemption allowed

    Mahesana, Mahesana district, Gujarat

    NWR-Dharoi Canal Division no 3 Visnagar

    ₹22.95 lakhCloses 25 Nov, 6:00 pm
  37. Irrigation & flood control7 days left

    Replacement of rubble pitching on upstream and downstream slopes of right-side earthen dam of Madhuban dam, Damanganga Reservoir Project, Dadra and Nagar Haveli

    Replacement of rubble pitching on both dam slopes; 540 days; open tender

    All Gujarat

    NWR-Damanganga Project Division No. 1, Dadra and Nagar Haveli

    ₹12.27 croreCloses 25 Nov, 6:00 pm
  38. Irrigation & flood control7 days left

    Restoration of canal lining, plastering and raising of upstream and downstream of syphon structures from ch. 5870.00 mt to 15150.00 mt. of Branch Canal No. 5

    Work period 6 months; EMD exemption allowed

    Mahesana, Mahesana district, Gujarat

    NWR-Dharoi Canal Division no 3 Visnagar

    ₹1.67 croreCloses 25 Nov, 6:00 pm
  39. Irrigation & flood control7 days left

    Maintenance and repairs for Kachchh Branch Canal Ch.153.905 Km to 170.740 Km. and Its Networks

    Work period 12 months; EMD exemption allowed

    Kachchh, Kachchh district, Gujarat

    SSNNL-KBC Division No 2-6 Bhachau

    ₹1.03 croreCloses 25 Nov, 6:00 pm
  40. Irrigation & flood control7 days left

    Installation of various instruments and monitoring system at Vadi Irrigation Scheme (5th Attempt)

    Work period 6 months; EMD exemption allowed

    Amreli, Amreli district, Gujarat

    NWR-Irrigation Sub Division No.2 - AMRELI

    ₹7.25 lakhCloses 25 Nov, 6:00 pm
  41. Irrigation & flood control7 days left

    Construction of a new RCC Canal syphon in place of the existing brick masonry Canal syphon at ch.7530 mt & ch.8730 mt on the Mahisa distributary

    Work period 9 months; EMD exemption allowed

    Nadiad, Kheda district, Gujarat

    NWR-Shedhi Irrigation Division Nadiad

    ₹40.05 lakhCloses 25 Nov, 6:00 pm
  42. Irrigation & flood control7 days left

    Construction of a new RCC Canal syphon in place of the existing brick masonry Canal syphon at Ch.90 mt & Ch.5490 mt on the Mahisa Distributary

    Work period 9 months; EMD exemption allowed

    Nadiad, Kheda district, Gujarat

    NWR-Shedhi Irrigation Division Nadiad

    ₹42.4 lakhCloses 25 Nov, 6:00 pm
  43. Irrigation & flood control7 days left

    Construction of RCC Barrel Type Canal Syphon Ch. 3210 of Extended Vadnagar Distibutory of Sabarmati Right Bank Main Canal

    Work period 3 months; EMD exemption allowed

    Mahesana, Mahesana district, Gujarat

    NWR-Dharoi Canal Division no 3 Visnagar

    ₹81.43 lakhCloses 25 Nov, 6:00 pm
  44. Irrigation & flood control7 days left

    Restoration of Meshwo main canal and Kajipura branch canals, Meshwo irrigation sub-division, Bareja, Nadiad

    Canal restoration over chainages 0 to 14587 m (Meshwo main), 0 to 9085 m and 0 to 7225 m (Kajipura branch and extension); 180 days; open tender

    Nadiad, Kheda district, Gujarat

    NWR-Shedhi Irrigation Division Nadiad

    ₹41.79 lakhCloses 25 Nov, 6:00 pm
  45. Consultancy & advisory8 days left

    Consultancy for Preparation of Detailed Project Report, Crossing Permissions, Land/ROU Acquisition and PMC/TPI for Disposal

    Work period 540 days

    Ahmedabad, Ahmedabad district, Gujarat

    NWR-Ahmedabad irrigation Division

    ₹11.75 croreCloses 26 Nov, 12:00 pm
  46. Irrigation & flood control8 days left

    Construction of Amboshi-2 Weir Across Man River near village Amboshi Tal. Dharampur district Valsad

    Work period 11 months; EMD exemption allowed

    Valsad, Valsad district, Gujarat

    NWR-Damanganga Canal Investigation Division

    ₹11.83 croreCloses 26 Nov, 6:00 pm
  47. Manpower & services8 days left

    Providing Security service and Man Power service for Implementation of Rabi Irrigation Year 2026-27 for Section 01 of Machchhu 2 Irrigation Scheme

    Work period 5 months; EMD exemption allowed

    Morbi, Morbi district, Gujarat

    NWR-Irrigation Division - Morbi

    ₹14.6 lakhCloses 26 Nov, 6:00 pm
  48. Consultancy & advisory8 days left

    Consultancy for survey, plotting and design of new check dams for 2026-27, NWR Irrigation Division Morbi

    Survey, plotting of C/S and L/S, and preparation of design, plans and estimates for various new check dams in Morbi district; 180 days; open tender

    Morbi, Morbi district, Gujarat

    NWR-Irrigation Division - Morbi

    ₹44.04 lakhCloses 26 Nov, 6:00 pm
  49. Irrigation & flood control8 days left

    Restoration and Strengthening of Bhandaria Minor Irrigation Scheme Ta. Palitana. district Bhavnagar

    Work period 11 months

    Bhavnagar, Bhavnagar district, Gujarat

    NWR-Panchayat Irrigation Division Bhavnagar

    ₹98.48 lakhCloses 26 Nov, 6:00 pm
  50. Irrigation & flood control8 days left

    Providing, laying and jointing 400 mm HDPE pipeline for filling pond at Malgadh village, Deesa taluka, Banaskantha

    Laying and jointing 400 mm HDPE pipeline with new scour valve at Ch.49990 m of Changa Dantiwada pipeline project; open tender for 270 days

    Banas Kantha, Banas Kantha district, Gujarat

    NWR-WRI Division - Palanpur

    ₹2.38 croreCloses 26 Nov, 6:00 pm

Other work in Gujarat