Construction of High School Building at Middle School Badi Naki Sanhaula, Block- Sanhoula, District- Bhagalpur, Group No- SSSM-372
Bihar State Educational Infrastructure Development Corporation Limited, HQ, Bihar State Educational Infrastructure Development Corporation Limited
Bhagalpur ज़िला में भवन निर्माण — Bihar State Educational Infrastructure Development Corporation Limited, HQ.
- अनुमानित लागत
- ₹1 करोड़
- अग्रधन (EMD)
- ₹2,00,300
- निविदा शुल्क
- ₹10,000
- बोली की अंतिम तिथि
- 3 दिन बाक़ी
- 2 नव॰ 2026, 3:00 pm
मुख्य तिथियाँ
- प्रकाशित27 अक्टू॰ 2026, 11:18 am
- बोली जमा शुरू27 अक्टू॰ 2026, 11:25 am
- बोली की अंतिम तिथि2 नव॰ 2026, 3:00 pm
- बोली खुलने की तिथि3 नव॰ 2026, 3:30 pm
काम कहाँ है
Bhagalpur
Bhagalpur ज़िला
स्थान: ज़िले में कहीं स्तर तक
किसने जारी किया
- Bihar State Educational Infrastructure Development Corporation Limited
- Bihar State Educational Infrastructure Development Corporation Limited, HQ
- जारी करने वाला अधिकारी
- CHIEF ENGINEER, Bihar State Educational Infrastructure Development Corporation Limited
- स्वीकृति देने वाला अधिकारी
- CHIEF ENGINEER, Bihar State Educational Infrastructure Development Corporation Limited
काम
- भवन निर्माण
टेंडर दस्तावेज़
मुफ़्त। फ़ाइलें आधिकारिक पोर्टल पर खुलती हैं; WooTenders कोई प्रति नहीं रखता।
Attachment
BOQ.Sr-02.xlsx
Attachment
NIT-24 (2026-27) Complete Document-32.pdf
- 208 KB
NIT-24
NIT-24 (2026-27) Complete Document-32.pdf
- 261 KB
BOQ
BOQ.Sr-02.xlsx
- 50 KB
SPECIAL CONDITION
SpeCon2026NIT24SL02.doc
बोली लगाने वालों को क्या चाहिए
- 5 पात्रता शर्तें, धारा और पृष्ठ सहित
- जमा करने के 14 दस्तावेज़
इनमें शामिल: शपथ पत्र, चरित्र प्रमाण पत्र, अग्रधन (EMD), मुकदमे का विवरण, ठेकेदार पंजीकरण, समान कार्य अनुभव, PAN / GST, टर्नओवर
संदर्भ
- टेंडर आईडी
- 142238
- संदर्भ संख्या
- NIT-24/2026-27/02
- स्रोत
- Bihar eProc
- पोर्टल पर आख़िरी जाँच
- 27 अक्टू॰ 2026, 11:30 am
बोली लगाने से पहले आधिकारिक पोर्टल पर विवरण अवश्य जाँचें।
इसके पास के और खुले टेंडर
50 किमी के अंदर, सबसे पास वाले पहले।
- ≈<1किमी
Name of Work: Repair of 500 MT Capacity TPDS SFC Godown At -Naugachia Block , Dist-Bhagalpur(RETENDER)
Bhagalpur, Bhagalpur ज़िला
लागत नहीं बताई गई24 घंटे बाकी - ≈<1किमी
Design , Drawing , Fabrication , Supply , Fitting , Fixing , Installation , Erection Of Embeded Parts, Gate leaf , Bottom Seal, of 2 Nos U/S Gate With Hoisting Arrangement, Operating Platform And PCC Work of Checkdam on Koshik River at Village- Piri Bazar ,Block- Suryagrah Dist- Lakhisarai Under Ganga Pump Canal Division , Munger .
Lakhisarai, Bhagalpur, Bhagalpur, Lakhisarai ज़िले
IRRIGATION MECHANICAL CIRCLE, MITHAPUR, PATNA
₹18.34 लाखसिंचाई व बाढ़ नियंत्रण3 दिन बाकी - <1किमी
Construction of Laboratory Class Room at (1) Asarganj Saraswati High School Belari, Block- Sultanganj, (2) D.P.M. High School Karharia, Block- Sultanganj Under Bhagalpur District ( Group No- PM-L06E) under PM SHRI Scheme.
Belari, Sultanganj +1, Bhagalpur ज़िला
Bihar State Educational Infrastructure Development Corporation Limited, HQ
₹29.61 लाखभवन निर्माण3 दिन बाकी - ≈<1किमी
Selection of System Integrator for Supply, Installation, Integration, Testing, Commissioning and Operation & Maintenance of Electronic Toll Collection (ETC) System including Medium Speed Weigh-in-Motion (MSWIM) and Static Weigh Bridge (SWB) System at Toll Plazas- Bridge on Sanhaula - Baissa - Hanwara Road in the District of Bhagalpur in the State of Bihar
Bhagalpur, Bhagalpur ज़िला
WORKS DIVISION BHAGALPUR
₹1.73 करोड़सड़क व पुल6 दिन बाकी - ≈<1किमी
Collection of User Fee through the Agency Selected on Competitive Bidding (e-Tendering) for Bridge on Sanhaula - Baissa - Hanwara Road in the District of Bhagalpur in the State of Bihar
Bhagalpur, Bhagalpur ज़िला
WORKS DIVISION BHAGALPUR
₹78 लाखटोल व शुल्क वसूली12 दिन बाकी - 8किमी
Construction of Laboratory Class Room at (1)High School Saidpur, Block- Gopalpur (2) Adarsh High School Kadwa, Block- Naugachhia, (3) High School Bahadurpur, Block- Sabour Under Bhagalpur District ( Group No- PM-L06D) under PM SHRI Scheme.
Bahadurpur, Gopalpur +2, Bhagalpur ज़िला
Bihar State Educational Infrastructure Development Corporation Limited, HQ
₹44.41 लाखभवन निर्माण3 दिन बाकी