CIVIL LAB AND CONSULTANCY REQUIREMENT
Science & Technology Department Bihar, Government of India
Supaul में चिकित्सा व प्रयोगशाला — Science & Technology Department Bihar.
- अनुमानित लागत
- लागत नहीं बताई गई
- अग्रधन (EMD)
- —
- निविदा शुल्क
- —
- बोली की अंतिम तिथि
- 15 दिन बाक़ी
- 14 नव॰ 2026, 9:00 pm
मुख्य तिथियाँ
- प्रकाशित26 अक्टू॰ 2026, 3:39 pm
- बोली जमा शुरू26 अक्टू॰ 2026, 3:39 pm
- बोली की अंतिम तिथि14 नव॰ 2026, 9:00 pm
काम कहाँ है
किसने जारी किया
- Government of India
- Science & Technology Department Bihar
काम
- चिकित्सा व प्रयोगशाला
- परामर्श व सर्वेक्षण
Bid end
14-11-2026 21:00:00. Bid End Date/Time | 14-11-2026 21:00:00
पृष्ठ 1
Bid opening
15-11-2026 21:00:00. Bid Opening | Date/Time | 15-11-2026 21:00:00
पृष्ठ 1
Offer validity
90 (Days). Bid Offer | Validity (From End Date) | 90 (Days)
पृष्ठ 1
Type of bid
Two Packet Bid. Type of Bid | Two Packet Bid
पृष्ठ 2
Reverse auction
Yes. Bid to RA enabled | Yes
पृष्ठ 2
Evaluation method
Total value wise evaluation. Evaluation Method | Total value wise evaluation
पृष्ठ 3
AI सारांश — आधिकारिक पोर्टल पर जाँचें
टेंडर दस्तावेज़
मुफ़्त। फ़ाइलें आधिकारिक पोर्टल पर खुलती हैं; WooTenders कोई प्रति नहीं रखता।
Bid document
9879891.pdf
बोली लगाने वालों को क्या चाहिए
- 3 पात्रता शर्तें, धारा और पृष्ठ सहित
- जमा करने के 3 दस्तावेज़
- परफ़ॉर्मेंस गारंटी की शर्तें
संदर्भ
- टेंडर आईडी
- GEM/2026/B/8025319
- स्रोत
- GeM
- पोर्टल पर आख़िरी जाँच
- 30 अक्टू॰ 2026, 2:15 pm
बोली लगाने से पहले आधिकारिक पोर्टल पर विवरण अवश्य जाँचें।
इसके पास के और खुले टेंडर
50 किमी के अंदर, सबसे पास वाले पहले।
- ≈<1किमी
Construction of Laboratory Class Room at (1) Bihari Gumaita Higher Secondary School, Block- Saraigarh Bhaptiyahi (2) +2 Senior Secondary School Sukhpur, Block- Supaul, (3) High School Kishnapur, Block- Kishnapur Under Supaul District ( Group No- PM-L36E) under PM SHRI Scheme.
Saraigarh Bhaptiyahi, Supaul, Supaul ज़िला
Bihar State Educational Infrastructure Development Corporation Limited, HQ
₹46.58 लाखभवन निर्माण3 दिन बाकी - ≈<1किमी
Construction of Laboratory Class Room at (1) Janta Bachha High School, Block- Raghopur, (2) L.K.A. High School, Block- Birpur Under Supaul District ( Group No- PM-L36C) under PM SHRI Scheme.
Raghopur, Birpur, Supaul ज़िला
Bihar State Educational Infrastructure Development Corporation Limited, HQ
₹31.05 लाखभवन निर्माण3 दिन बाकी - <1किमी
Construction of New Control Room Building at 33/11 KV PSS at Pipra under Civil division Supaul
Pipra, Supaul, Supaul ज़िला
Civil
₹84.04 लाखभवन निर्माण3 दिन बाकी - ≈<1किमी
CONSTRUCTION OF TOILET COMPLEX IN CAMPUS OF SUBDIVISIONAL CIVIL COURT BIRPUR, DIST -SUPAUL FOR THE F-YEAR 2026-27
Birpur, Supaul, Supaul ज़िला
Supaul Division
₹33.55 लाखभवन निर्माण6 दिन बाकी - ≈<1किमी
Electrical Engg SMART EV LAB PROPOSAL
Supaul, Supaul ज़िला
Science & Technology Department Bihar
लागत नहीं बताई गईविद्युत कार्य6 दिन बाकी - ≈<1किमी
RENOVATION OF SAHARSA SUB-BRANCH AND SUPAUL SUB-BRANCH CANAL AND ITS DISTRIBUTION SYSTEMS UNDER IRRIGATION DIVISION SAHARSA
Kahara, Supaul, Saharsa, Supaul ज़िले
IRRIGATION CIRCLE, SAHARSA
₹15.29 करोड़भवन निर्माण12 दिन बाकी