Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - STREET LIGHT AT GP
Department of Panchayati Raj, Government of India
Gopalganj में विद्युत कार्य — Department of Panchayati Raj.
- अनुमानित लागत
- लागत नहीं बताई गई
- अग्रधन (EMD)
- —
- निविदा शुल्क
- —
- बोली की अंतिम तिथि
- 4 दिन बाक़ी
- 3 नव॰ 2026, 3:00 pm
मुख्य तिथियाँ
- प्रकाशित24 अक्टू॰ 2026, 2:06 pm
- बोली जमा शुरू24 अक्टू॰ 2026, 2:06 pm
- बोली की अंतिम तिथि3 नव॰ 2026, 3:00 pm
काम कहाँ है
किसने जारी किया
- Government of India
- Department of Panchayati Raj
काम
- विद्युत कार्य
पूर्णता अवधि
Contract Period | 3 Month(s) 9 Day(s)
पृष्ठ 1
Bid end
03-11-2026 15:00:00. Bid End Date/Time | 03-11-2026 15:00:00
पृष्ठ 1
Bid opening
04-11-2026 15:00:00. Bid Opening | Date/Time | 04-11-2026 15:00:00
पृष्ठ 1
Offer validity
180 (Days). Bid Offer | Validity (From End Date) | 180 (Days)
पृष्ठ 1
Type of bid
Two Packet Bid. Type of Bid | Two Packet Bid
पृष्ठ 2
Reverse auction
No. Bid to RA enabled | No
पृष्ठ 2
Evaluation method
Total value wise evaluation. Evaluation Method | Total value wise evaluation
पृष्ठ 2
AI सारांश — आधिकारिक पोर्टल पर जाँचें
टेंडर दस्तावेज़
मुफ़्त। फ़ाइलें आधिकारिक पोर्टल पर खुलती हैं; WooTenders कोई प्रति नहीं रखता।
Bid document
10077275.pdf
बोली लगाने वालों को क्या चाहिए
- 3 पात्रता शर्तें, धारा और पृष्ठ सहित
- जमा करने के 3 दस्तावेज़
संदर्भ
- टेंडर आईडी
- GEM/2026/B/8197372
- स्रोत
- GeM
- पोर्टल पर आख़िरी जाँच
- 28 अक्टू॰ 2026, 12:39 am
बोली लगाने से पहले आधिकारिक पोर्टल पर विवरण अवश्य जाँचें।
इसके पास के और खुले टेंडर
50 किमी के अंदर, सबसे पास वाले पहले।
- <1किमी
Construction of Lawyer's hall Building in Civil Court Campus, Gopalganj (with Electrical) Tender ID -140827
Gopalganj, Gopalganj ज़िला
Gopalganj Division
₹67.84 लाखभवन निर्माण2 घंटे बाकी - ≈<1किमी
Construction of Laboratory Class Room at (1) Gandhi Smarak High School Bhore, Block- Bhore, (2) High School Kalyanpur, Block- Bhore, (3) Co-Operative High School Ahiyapur, Block- Bijaypur Under Gopalganj District ( Group No- PM-L12A) under PM SHRI Scheme.
Gopalganj, Gopalganj ज़िला
Bihar State Educational Infrastructure Development Corporation Limited, HQ
₹45.18 लाखभवन निर्माण3 दिन बाकी - <1किमी
Construction of Laboratory Class Room at (1) Hajari Lal High School Baliwan Sagar, Block- Kuchaekote, (2) High School Ramchandarpur, Block- Thawe, (3) High School Kusaundhi, Block- Hathua Under Gopalganj District ( Group No- PM-L12C) under PM SHRI Scheme.
Baliwan Sagar, Ramchandarpur +4, Gopalganj ज़िला
Bihar State Educational Infrastructure Development Corporation Limited, HQ
₹45.18 लाखभवन निर्माण3 दिन बाकी - ≈<1किमी
Construction of 71 Health & Wellness Centre at Block- Sidhwalia, Barauli,Manjha, Gopalganj, Thawe, Pach Deuri, Uchkagaon, Kuchaikote, Bijaipur, Katiya, Bhorey and Hathua. District-Gopalganj
Barauli, Manjha +6, Gopalganj ज़िला
Bihar Medical Services and Infrastructure Corporation Limited
₹34.87 करोड़भवन निर्माण4 दिन बाकी - ≈<1किमी
Sticky Note Pad size 3X3,Tag Cotton big size set of 100,Paper Binder Clip 41 mm Pack of 12,Fevicol
Gopalganj, Gopalganj ज़िला
Department of Defence
लागत नहीं बताई गईअन्य सामान व सेवाएँ4 दिन बाकी - ≈<1किमी
EE & VLSI Labs Equipment
Gopalganj, Gopalganj ज़िला
Science & Technology Department Bihar
लागत नहीं बताई गईअन्य सामान व सेवाएँ6 दिन बाकी