Loading tenders in Punjab…
Loading tenders in Punjab…
599 open Irrigation & flood control tenders in Sangrur, Punjab, from GeM and central and state e-procurement portals. Closing soonest first, with value, EMD and documents.
Balance relining and lining of watercourse by brick masonry; open tender in two covers; OT class registration needed
Sangrur, Sangrur district, Punjab
DE Lehal PWRMDC Division - Patiala
Manual clearance of weeds, reeds, jungle growth and silt from inside brick-lined channels; 60-day work period; open tender in two covers (technical and financial)
Sangrur, Sangrur district, Punjab
Canal - Sangrur Canal Div
Manual clearance of inner sections of Brick lined Mandi Minor (RD 48220 to 92356), Sub minor 2 (RD 0 to 18957) and Sub minor 3 (RD 0 to 4050); 60 days; open tender in two covers (technical and financial)
Sangrur, Sangrur district, Punjab
Canal - Sangrur Canal Div
Manual desilting and weed clearance of brick-lined Sangrur Disty RD 33215 to 68660; 60 days; open tender in two covers
Sangrur, Sangrur district, Punjab
Canal - Sangrur Canal Div
Manual clearance of weeds, reeds, jungle growth and silt from inside the channel; 60-day work period; open tender in two covers (technical and financial)
Sangrur, Sangrur district, Punjab
Canal - Sangrur Canal Div
Internal clearance of Pandher Distributary (RD 0 to 23348) and Togowal Minor (RD 0 to 8500); 30 days; open tender in two covers (technical and financial)
Sangrur, Sangrur district, Punjab
Canal - Sangrur Canal Div
Manual clearance of weeds, reeds, jungle growth and silt from inside the channels; 60-day work period; open tender in two covers (technical and financial)
Sangrur, Sangrur district, Punjab
Canal - Sangrur Canal Div
Manual desilting and weed clearance of lined Longowal Disty RD 12500 to 39840 and Bahadarpur Minor RD 0 to 3182; 60 days; open tender in two covers
Sangrur, Sangrur district, Punjab
Canal - Sangrur Canal Div
Manual desilting and weed clearance of lined Longowal Minor RD 0 to 18424 and Batuha Minor RD 0 to 22470 of Longowal Disty; 60 days; open tender in two covers
Sangrur, Sangrur district, Punjab
Canal - Sangrur Canal Div
UGPL laying at one point on the distributary for 60 days; open tender in two covers
Sangrur, Sangrur district, Punjab
Canal - Sangrur Canal Div
Manual clearance of weeds, reeds, jungle growth and silt from inside the lined channels; 60-day work period; open tender in two covers (technical and financial)
Sangrur, Sangrur district, Punjab
Canal - Sangrur Canal Div
Manual clearance of weeds, jungle growth and silt from inner sections of concrete-lined Sangrur Distributary, sub-minor and several minors; 60 days; open tender in two covers
Sangrur, Sangrur district, Punjab
Canal - Sangrur Canal Div
Pipeline laying on main line in service bank along Kairon Drain for 60 days; open tender in two covers
Sangrur, Sangrur district, Punjab
Canal - Sangrur Canal Div
Manual clearance of weeds, silt and jungle booti on distributary and minor sections for the second term of 2026-27; 60 days; open tender in two covers (technical and financial)
Sangrur, Sangrur district, Punjab
Canal - Sangrur Canal Div
Manual removal of weeds, reeds, jungle growth and silt from the internal section for the 2nd term of 2026-27; open tender in two covers; 60 days
Sangrur, Sangrur district, Punjab
Canal - Sangrur Canal Div
Manual clearance of weeds, silt and jungle growth for 60 days, second term of 2026-27; open tender in two covers
Sangrur, Sangrur district, Punjab
Canal - Sangrur Canal Div
Pipeline laying at outlet RD 883 L of Minor Number 07 for 45 days; two covers (technical and financial); open tender
Sangrur, Sangrur district, Punjab
Canal - Sangrur Canal Div
Estimate for laying underground pipeline at a canal outlet; 45 days; open tender in two covers (technical and financial); no registration class required
Sangrur, Sangrur district, Punjab
Canal - Sangrur Canal Div
Manual clearance of weeds, reeds, jungle growth and silt from inside the channel; 60-day work period; open tender in two covers (technical and financial)
Sangrur, Sangrur district, Punjab
Canal - Sangrur Canal Div
Manual clearance of inner sections of Brick lined Mandi Minor (RD 42000 to 48220) and Khokhar Sub Minor (RD 0 to 29700); 60 days; open tender in two covers (technical and financial)
Sangrur, Sangrur district, Punjab
Canal - Sangrur Canal Div
Estimate for underground pipeline laying at the outlet; 60 days work period; open tender in two covers
Sangrur, Sangrur district, Punjab
Canal - Sangrur Canal Div
Laying of main-line pipeline in service bank along Kairon Drain at RD 76700 R of First Patiala Feeder; 60 days; open tender in two covers
Sangrur, Sangrur district, Punjab
Canal - Sangrur Canal Div
Lining of watercourse outlet for 180 days; open tender in two covers; no tenderer class required
Sangrur, Sangrur district, Punjab
DE - Lining Division No. - 3 - Malout
Underground pipeline laid at an outlet of Kotla branch; work period 60 days; two covers; open tender
Sangrur, Sangrur district, Punjab
Canal - Sangrur Canal Div
Manual clearance of weeds, silt and sarkanda from Joga Distributary (RD 0 to 28066) and Kotduna Distributary (RD 35220 to 46000) for 60 days; open tender in two covers
Sangrur, Sangrur district, Punjab
Canal - Sangrur Canal Div
Laying of underground pipeline at canal RD point; 45 days; two covers; class I registration needed
Sangrur, Sangrur district, Punjab
Canal - Sangrur Canal Div
Laying of underground pipeline at canal RD point; 45 days; two covers; class I registration needed
Sangrur, Sangrur district, Punjab
Canal - Sangrur Canal Div
Relining and lining of a watercourse by underground pipeline (UGPL) of an outlet on minor No. 2; open tender in two covers
Sangrur, Sangrur district, Punjab
DE Lehal PWRMDC Division - Patiala
Brickwork lining of a watercourse at one outlet; 60 days; two covers (technical and financial); open tender
Sangrur, Sangrur district, Punjab
Canal - Lehal Canal Div - Patiala
Estimate for a cross regulator at RD 119260 off Ladbanjara Distributary for 60 days; open tender in two covers
Sangrur, Sangrur district, Punjab
Canal - Lehal Canal Div - Patiala
Estimate for an escape structure on the Ghaggar Branch into the Lehragaga Ditch Drain for 60 days; open tender in two covers
Sangrur, Sangrur district, Punjab
Canal - Lehal Canal Div - Patiala
Lining of watercourse outlet on Minor No. 1; two covers (technical and financial); open tender; 60 days
Sangrur, Sangrur district, Punjab
Canal - Lehal Canal Div - Patiala
Lining of the water course at the outlet; 60 days; two covers; open tender
Sangrur, Sangrur district, Punjab
Canal - Lehal Canal Div - Patiala
Estimate for lining of a watercourse outlet; 60 days; two covers (technical and financial); open tender
Sangrur, Sangrur district, Punjab
Canal - Lehal Canal Div - Patiala
Restoration of canal lining gaps over 24,000 running metres of sub-branch; 60 days to complete; open tender in two covers (technical and financial)
Sangrur, Sangrur district, Punjab
Canal - Lehal Canal Div - Patiala
Construction or reconstruction of outlet watercourses using fly ash; 60 days; open tender in two covers
Sangrur, Sangrur district, Punjab
Canal - Lehal Canal Div - Patiala
Watercourse lining by laying an underground pipeline; 180 days; open tender in two covers; OT class registration
Sangrur, Sangrur district, Punjab
DE - Tubewell Division - Malerkotla
Estimate for laying underground pipeline at OL RD 11450TF of Minor 7, part 2; 45 days; open tender in two covers (technical and financial)
Sangrur, Sangrur district, Punjab
Canal - Sangrur Canal Div
Underground pipeline laying at one outlet for 60 days; open tender in two covers
Sangrur, Sangrur district, Punjab
Canal - Sangrur Canal Div
Estimate for underground pipeline laying at the outlet; 60 days work period; open tender in two covers
Sangrur, Sangrur district, Punjab
Canal - Sangrur Canal Div
Extension of underground pipeline at outlet for 45 days; open tender in two covers
Sangrur, Sangrur district, Punjab
Canal - Sangrur Canal Div
Lining or relining of the watercourse by underground pipeline at outlet RD 25400-L in Village Kanjhla, Dhuri; two covers; open tender
Sangrur, Sangrur district, Punjab
DE - Lining Division No. - 3 - Malout
Lining of watercourses at one outlet; 45 days work period; two covers (technical and financial) in open tender
Sangrur, Sangrur district, Punjab
Canal - Sangrur Canal Div
Relining and lining of a watercourse by laying UGPL; open tender in two covers
Sangrur, Sangrur district, Punjab
DE Lehal PWRMDC Division - Patiala
Relining and lining of watercourse at Outlet RD 13730TR Extension 1 under UGPL; open tender in two covers
Sangrur, Sangrur district, Punjab
DE Lehal PWRMDC Division - Patiala
Re-lining of watercourse with RCC underground pipeline laying and jointing, plus allied works; 180 days; open tender in two covers; OT class registration
Sangrur, Sangrur district, Punjab
DE - Lining Division No. - 6 - Rampura Phul
Relining of watercourse by laying and jointing RCC underground pipeline system and allied works; 180 days; open tender in two covers (technical and financial); OT class registration
Sangrur, Sangrur district, Punjab
DE - Lining Division No. - 6 - Rampura Phul
Relining of watercourse OL RD 12228TL with laying and jointing of RCC underground pipeline for 180 days; two covers (technical and financial); open tender
Sangrur, Sangrur district, Punjab
DE - Lining Division No. - 6 - Rampura Phul
Relining of a watercourse by laying and jointing UPVC underground pipeline for 180 days; open tender in two covers; OT class registration needed
Sangrur, Sangrur district, Punjab
DE - Lining Division No. - 6 - Rampura Phul
Relining of a watercourse by laying and jointing UPVC underground pipeline for 180 days; open tender in two covers; OT class registration needed
Sangrur, Sangrur district, Punjab
DE - Lining Division No. - 6 - Rampura Phul