Periodic Maintenance Programme (Major-Bridge) for Construction of 31.83 m (1 x 30.488 m) Long PC Girder (Charpara Bridge)
Read the full title from the noticeHide the full title
Periodic Maintenance Programme (Major-Bridge) for Construction of 31.83 m (1 x 30.488 m) Long PC Girder (Charpara Bridge) at 2nd Km (Ch. 1+955 km) on Nalitbari-Papiajuri Road (Z-4619) under Sherpur Road Division during the year 2026-2027.
Sherpur Road Division, Ministry of Road Transport and Bridges
Sherpur, Sherpur district
- Estimated contract value
- Not published
- No estimate in the notice
- EMD
- Not published
- Tender fee
- Not published
- Bids close
- 14 Dec 2026, 11:30 am IST
- 30 days left
Summary
Work period 547 days
Work duration 547 days
AI summary — verify on the official portal
Scope of work
- Roads & bridges
- Bridges & culverts
- Work duration
- 547 days
- From the official tender record
Eligibility
Submission checklist
Commercial terms
Contract value, EMD, tender fee and performance security are separate amounts; they are never added up.
Evaluation
Tender documents
The portal has not listed any files for this tender yet.
Key dates
- Published10 Nov 2026, 3:30 pm IST
- Pre-bid meeting10 Nov 2026, 4:30 pm IST
- Bids close14 Dec 2026, 11:30 am IST
- Bid opening14 Dec 2026, 11:30 am IST
Location and buyer
Sherpur
Sherpur district
Only the district is known; the tender doesn't name the exact site
Who issued it
- Ministry of Road Transport and Bridges
- Road Transport and Highways Division
- Roads & Highways Department (RHD)
- Sherpur Road Division
Changes, clarifications and contacts
Reference
- Tender ID
- 1367044
- Reference
- e-GP/18-PMP-Bridge/SRD/2026-2027
- Tender type
- NCT
- Source
- Bangladesh e-GP (CPTU / BPPA)
- Last checked on the portal
- 14 Nov 2026, 12:53 am IST
Always verify details on the official portal before bidding.
Tenders most like this one
Open Roads & bridges tenders closest to it in work and place
- Roads & bridges25 days left
Periodic Maintenance Programme (Major-Bridge/Culvert) for Construction of 12.75m (1x12.00m) Long RCC Slab Sitarampur Bridge at 3rd Km (Ch. 2+330m)
Work period 1 year
Netrakona (Netrokona), Netrakona (Netrokona) district
Road Division Netrokona
Value not publishedCloses 9 Dec, 11:30 am - Roads & bridges33 hours left
Repair of Damaged Pavement by providing Aggregate base type-II, carpeting & SBST (Single Bituminous Surface Treatment) at 4th (p), 5th (p)
Work period 1 month
Sherpur, Sherpur district
Sherpur Road Division
Value not publishedCloses 15 Nov, 2:00 pm - Roads & bridges5 days left
Supply of thermoplastic paint, reflective glass beads and reflecting sheets for Jamalpur road division roads, 2026-27
Thermoplastic paint, reflective glass beads, prismatic reflecting sheets and other painting materials; work period 61 days; NCT tender
Jamalpur, Jamalpur district
Jamalpur Road Division
Value not publishedCloses 19 Nov, 11:30 am - Roads & bridges12 days left
Improvement of Dewanganj Taratioa UZR-(Hakkir Moor) Noyagram road with BC, 2000m, Jamalpur, LGED Jamalpur
Road improvement with BC for 2000m, 2 RCC box culverts, U-drain, protective work for 308m and road safety work; 450 days; NCT tender type
Jamalpur, Jamalpur district
Office of the Executive Engineer, LGED, Jamalpur
Value not publishedCloses 26 Nov, 12:30 pm - Roads & bridges12 days left
Improvement of Banshchara U.P to Upazila H/Q Bania Bazar road with BC, Sadar upazila, Jamalpur, LGED Jamalpur
Work period 450 days
Jamalpur, Jamalpur district
Office of the Executive Engineer, LGED, Jamalpur
Value not publishedCloses 26 Nov, 12:30 pm - Roads & bridges9 days left
Construction of 22.00 m Long RCC Girder bridge on deuli up-mokamtola up via chakloma road from ch.1382m
Work period 364 days
Bogura (Bogra), Bogura (Bogra) district
Office of the Executive Engineer, LGED, Bogura
Value not publishedCloses 23 Nov, 2:30 pm