Periodic Maintenance Programme by Rigid Pavement Work from Ch. 03+334m to Ch. 03+400m (Jora Pump) of Narail Town By-Pass Road (Z-7505) under Road Division
Read the full title from the noticeHide the full title
Periodic Maintenance Programme by Rigid Pavement Work from Ch. 03+334m to Ch. 03+400m (Jora Pump) of Narail Town By-Pass Road (Z-7505) under Road Division, Narail during the year 2026-2027.
Narail Road Division, Ministry of Road Transport and Bridges
Narail, Narail district
- Estimated contract value
- Not published
- No estimate in the notice
- EMD
- Not published
- Tender fee
- Not published
- Bids close
- 23 Nov 2026, 12:15 pm IST
- 9 days left
Summary
Work period 91 days
Work duration 91 days
AI summary — verify on the official portal
Scope of work
- Roads & bridges
- Vehicles & machinery
- Work duration
- 91 days
- From the official tender record
Eligibility
Submission checklist
Commercial terms
Contract value, EMD, tender fee and performance security are separate amounts; they are never added up.
Evaluation
Tender documents
The portal has not listed any files for this tender yet.
Key dates
- Published10 Nov 2026, 7:30 pm IST
- Pre-bid meeting10 Nov 2026, 8:00 pm IST
- Bids close23 Nov 2026, 12:15 pm IST
- Bid opening23 Nov 2026, 12:15 pm IST
Location and buyer
Narail
Narail district
Only the district is known; the tender doesn't name the exact site
Who issued it
- Ministry of Road Transport and Bridges
- Road Transport and Highways Division
- Roads & Highways Department (RHD)
- Narail Road Division
Changes, clarifications and contacts
Reference
- Tender ID
- 1368940
- Reference
- 35.01.6500.450.07.005.26- 2360 Dt:10 /11/2026
- Tender type
- NCT
- Source
- Bangladesh e-GP (CPTU / BPPA)
- Last checked on the portal
- 14 Nov 2026, 12:53 am IST
Always verify details on the official portal before bidding.
Tenders most like this one
Open Roads & bridges tenders closest to it in work and place
- Roads & bridges9 days left
Periodic Maintenance Programme (PMP Road-Minor) by Rigid Pavement work from Ch.01+100m to Ch.01+172m (Badaghat mor) of Narail-Fultala Road (R-718)
Work period 91 days
Narail, Narail district
Narail Road Division
Value not publishedCloses 23 Nov, 12:30 pm - Roads & bridges9 days left
Periodic Maintenance Programme by Rigid Pavement Work from Ch.32+600m to Ch.32+660m (Gabtola Bazar)
Work period 91 days
Narail, Narail district
Narail Road Division
Value not publishedCloses 23 Nov, 1:00 pm - Roads & bridges9 days left
Periodic Maintenance Programme (Emergency Repair /VVIP) work at Narail-Fultala Road (R-718) by Rigid Pavement
Work period 91 days
Narail, Narail district
Narail Road Division
Value not publishedCloses 23 Nov, 12:45 pm - Roads & bridges9 days left
Construction of Rigid Pavement with Widening Works from Ch.06+100m to Ch.06+154m of Bhatiapara-Kalna-Lohagara-Narail-Jashore Road (N-806)
Work period 91 days
Narail, Narail district
Narail Road Division
Value not publishedCloses 23 Nov, 11:45 am - Roads & bridges9 days left
Construction of Rigid Pavement with Widening Works from Ch. 03+990m to Ch.04+032m of Bhatiapara-Kalna-Lohagara-Narail-Jashore Road (N-806)
Work period 91 days
Narail, Narail district
Narail Road Division
Value not publishedCloses 23 Nov, 11:30 am - Roads & bridges9 days left
Construction of Rigid Pavement with Widening Works from Ch.07+940m to Ch.08+005m of Bhatiapara-Kalna-Lohagara-Narail-Jashore Road (N-806)
Work period 91 days
Narail, Narail district
Narail Road Division
Value not publishedCloses 23 Nov, 12:00 pm