Procurement of the complete assembly of vacuum pressure relief valve installed in the silos of PH-IV STPS, Sarni
Read the full title from the noticeHide the full title
Procurement of the complete assembly of vacuum pressure relief valve installed in the silos of PH-IV STPS, Sarni.
Chief Engineer(Gen.)- Satpura Thermal Power Station Sarni MPPGCL, Madhya Pradesh Power Generating Company Limited
Betul, Betul district, Madhya Pradesh
- Estimated contract value
- Not published
- No estimate in the notice
- EMD
- Not published
- No exemption (per portal)
- Tender fee
- ₹0
- No tender fee, as listed on the portal
- Bids close
- 7 Dec 2026, 3:30 pm IST
- 14 days left
Summary
Delivery within 2 months; open tender in two covers (technical and financial)
Work duration 60 days · bids valid 120 days · Two covers (technical and financial)
AI summary. Check the official portal before you bid.
Scope of work
- Spares & parts
- Steel, cement & hardware
- Work duration
- 60 days
- From the official tender record
Eligibility
- Pre-qualification
- As per Enquiry
Submission checklist
- Submission
- Two covers: a technical bid and a separate financial bid
- From the official tender record
- Bid validity
- 120 days
Commercial terms
Contract value, EMD, tender fee and performance security are separate amounts; they are never added up.
Evaluation
Tender documents
Every file the department published. Unlock this tender to download them.
- PDFLocked
Tender notice (NIT)
Tendernotice_1.pdf · 3.6 MB
- PDFLocked
Enquiry.pdf
Enquiry · 3.6 MB
Key dates
- Published21 Nov 2026, 9:00 am IST
- Bids accepted from21 Nov 2026, 9:00 am IST
- Bids close7 Dec 2026, 3:30 pm IST
- Bid opening9 Dec 2026, 3:30 pm IST
Location and buyer
Betul
Betul district, Madhya Pradesh
Marked at pincode level
Who issued it
- Madhya Pradesh Power Generating Company Limited
- Chief Engineer(Gen.)- Satpura Thermal Power Station Sarni MPPGCL
Changes, clarifications and contacts
- Bids opened at
- STPS, MPPGCL, SARNI
Reference
- Tender ID
- 2026_MPPGC_857853_1
- Reference
- PE-302/888
- Tender type
- Open Tender
- Source
- ePublish
- Last updated
- 21 Nov 2026, 9:23 am IST
Always verify details on the official portal before bidding.
Tenders most like this one
Open Spares & parts tenders closest to it in work and place
- Spares & parts2 days left
Vent fan assembly (model HCMB-3-50-1-3) for silo, STPS Sarni
Delivery within 2 months; open tender in two covers (technical and financial); EMD exemption allowed
Betul, Betul district, Madhya Pradesh
Chief Engineer(Gen.)-Satpura Thermal Power Station-Sarni - MPPGCL
₹5.19 lakhCloses 25 Nov, 3:00 pm - Spares & parts18 days left
Supply of complete HP turbine module and IP turbine module assembly (BHEL make) for 250 MW turbine, Units 10 and 11, Satpura Thermal Power Station, Sarni
Complete HP turbine module and IP turbine module assembly for 250 MW KWU turbine set; delivery period 120 days; limited tender in two covers
Sarni, Betul district, Madhya Pradesh
Chief Engineer(Gen.)-Satpura Thermal Power Station-Sarni - MPPGCL
₹86.9 croreCloses 11 Dec, 3:00 pm - Spares & parts15 days left
Procurement of Spares of dust Suppression Actuator for CHP-4(Elec.), STPS, Sarni
Delivery within 45 days; open tender in two covers (technical and financial); EMD exemption allowed
Sarni, Betul district, Madhya Pradesh
Chief Engineer(Gen.)-Satpura Thermal Power Station-Sarni - MPPGCL
₹60.95 lakhCloses 8 Dec, 3:00 pm - Spares & parts21 days left
Procurement of spares of HP and IP Turbine Valves and strainers and various other spares of 250 MW KWU Turbine Set for COH of Unit No. 11, PH-4, STPS, MPPGCL
Delivery within 3 months; open tender in two covers (technical and financial); EMD exemption allowed
Sarni, Betul district, Madhya Pradesh
Chief Engineer(Gen.)-Satpura Thermal Power Station-Sarni - MPPGCL
₹1.36 croreCloses 14 Dec, 3:00 pm - Spares & parts2 days left
Supply of various spares for SWAS system of PH-4, Satpura Thermal Power Station, Sarni, MPPGCL
Various spares for the SWAS system of PH-4 at STPS Sarni; delivery within 60 days; open tender in two covers
Sarni, Betul district, Madhya Pradesh
Chief Engineer(Gen.)-Satpura Thermal Power Station-Sarni - MPPGCL
₹41.29 lakhCloses 25 Nov, 3:00 pm - Spares & parts9 days left
Supply of spare parts for side arm chargers, coal sampling units, ventilation and conveyor system of CHP-IV, STPS Sarni, MPPGCL
Spare parts for side arm chargers, coal sampling units, wagon tipplers and conveyor system; 60 days; open tender in two covers
Sarni, Betul district, Madhya Pradesh
Chief Engineer(Gen.)-Satpura Thermal Power Station-Sarni - MPPGCL
₹90.45 lakhCloses 2 Dec, 3:00 pm
More open tenders near this one
Within 50 km, nearest first.
- Same townConsultancy & advisory3 hours left
Witnessing of third-party coal sampling at railway sidings and mines for MPPGCL Satpura TPS Sarni, Madhya Pradesh
Witnessing the full third-party coal sampling by TPSA and its service provider at railway sidings and mines, with WCL loading end; 365 days; open tender in two covers (technical and financial)
Betul, Betul district, Madhya Pradesh
Chief Engineer(Gen.)-Satpura Thermal Power Station-Sarni - MPPGCL
₹48.34 lakhCloses 23 Nov, 3:00 pm - Same townRepair & maintenance2 days left
Biennial annual maintenance contract for repair of analytical instruments at NABL-accredited coal testing lab, STPS Sarni, MPPGCL
Biennial AMC for repair and maintenance of analytical instruments at the NABL-accredited coal testing lab; 730 days; open tender in two covers
Betul, Betul district, Madhya Pradesh
Chief Engineer(Gen.)-Satpura Thermal Power Station-Sarni - MPPGCL
₹5.17 lakhCloses 25 Nov, 3:00 pm - Same townOther goods & services2 days left
Mounted blade with wear plates for paddle mixer at silo, ash handling system, units 10 and 11, Sarni, MPPGCL
Mounted blade with wear plates for a paddle mixer at Satpura Thermal Power Station, Sarni; delivery period 60 days; two covers in open tender
Betul, Betul district, Madhya Pradesh
Chief Engineer(Gen.)-Satpura Thermal Power Station-Sarni - MPPGCL
₹8.94 lakhCloses 25 Nov, 3:00 pm - Same townVehicles & machinery2 days left
Requirement of one air-conditioned 6+1 seater diesel Jeep SUV for STPS Sarni, Madhya Pradesh, for 2 years
Work period 2 years; open tender in two covers (technical and financial); EMD exemption allowed
Betul, Betul district, Madhya Pradesh
Chief Engineer(Gen.)-Satpura Thermal Power Station-Sarni - MPPGCL
₹13.6 lakhCloses 25 Nov, 3:00 pm - Same townElectrical7 days left
Lift operators for services building of PH-IV, STPS, Sarni, Madhya Pradesh
Lift operators daily in B and C shifts only for 730 days; open tender in two covers
Betul, Betul district, Madhya Pradesh
Chief Engineer(Gen.)-Satpura Thermal Power Station-Sarni - MPPGCL
₹14 lakhCloses 30 Nov, 3:00 pm - Same townVehicles & machinery9 days left
Hiring of 01 No Air Conditioned Jeep (6 pls1 Pax Capacity) Category SUV with minimum engine capacity 1450 CC (for Diesel Version) with Air Bags, ABS
Work period 2 years; open tender in two covers (technical and financial); EMD exemption allowed
Betul, Betul district, Madhya Pradesh
Chief Engineer(Gen.)-Satpura Thermal Power Station-Sarni - MPPGCL
₹17.32 lakhCloses 2 Dec, 3:00 pm