New Construction of Staff Quarters Class-1 (2Unit), Class-2 (2 Unit) & Class-3 (32 Unit) Total -36 Units At. SDH Mandvi, Ta: Mandvi, Dist: Surat
PIU-Project Implementation Unit - Surat
Gujarat
- Estimated contract value
- ₹14.23 crore
- EMD
- ₹14,23,100
- Bid security, refunded after the bid · Exemption allowed (per portal)
- Tender fee
- ₹18,000
- Paid with the bid, not refunded
- Bids close
- 4 Dec 2026, 6:00 pm IST
- 21 days left
Summary
Work period 540 days; EMD exemption allowed
Work duration 540 days · bids valid 90 days
AI summary — verify on the official portal
Scope of work
- Buildings
- IT & electronics
- Networking, internet & telecom
- Work duration
- 540 days
- From the official tender record
Eligibility
Submission checklist
- Bid validity
- 90 days
Documents the portal asks bidders to upload
- Attach scan copy of technical supporting document as per tender. · Priliminary Stage
Commercial terms
Contract value, EMD, tender fee and performance security are separate amounts; they are never added up.
Evaluation
Tender documents
Every file the department published. Unlock this tender to download them.
- PDFLocked
Condition for cement.pdf
Condition for cement
- PDFLocked
GR RnB Revise.pdf
- PDFLocked
GR-TMT-Lap Length.pdf
- JPGLocked
INSTRUCTIONS TO PERSON TENDERING.jpg
- PDFLocked
Performance Bond and SD-Paripatra-2023.pdf
Performance Bond and SD-Paripatra-2023.pdfPerformance Bond and SD-Pari
- PDFLocked
PIU SPECIAL CONDITIONS.pdf
PIU SPECIAL CONDITIONS
- PDFLocked
Standard bidding document (SBD)
Inclusion of Insurance clause as per new SBD.pdf
- PDFLocked
6372 Make List HO 15.10.2025.pdf
6372 Make List HO 15.10.2025
- PDFLocked
Performance Bond and Bitumen date.pdf
Performance Bond and Bitumen date
- PDFLocked
Draft Letter_7-9 tender invite day.pdf
Draft Letter_7-9 tender invite day
- PDFLocked
Draft Letter_7-9.pdf
Draft Letter_7-9
- PDFLocked
Drawings / layout
Drawing.pdf
- PDFLocked
Technical specification
Specification for Electrical System.pdf
- PDFLocked
Technical specification
Specification for Fire Fighting.pdf
- PDFLocked
Technical specification
Specification for Plumbing Works.pdf
- PDFLocked
Technical specification
Specification for Safty norms.pdf
- PDFLocked
Technical specification
Specification for Shuttring.pdf
- PDFLocked
Technical specification
Specification.pdf
- PDFLocked
04_C_Make List_ELV.pdf
04_C_Make List_ELV
- PDFLocked
Technical specification
Specification for Electrical.pdf
- PDFLocked
Schedule B.pdf
Schedule B
- PDFLocked
Standard bidding document (SBD)
SBD.pdf
- PDFLocked
Tender document
Tender Document.pdf
Key dates
- Published7 Nov 2026, 12:00 pm IST
- Bids accepted from7 Nov 2026, 12:00 pm IST
- Bids close4 Dec 2026, 6:00 pm IST
- Bid opening5 Dec 2026, 12:00 pm IST
Location and buyer
Gujarat
The tender doesn't say where the work is
Who issued it
- PIU-Project Implementation Unit - Surat
Changes, clarifications and contacts
Reference
- Tender ID
- 364160
- Reference
- 2026-27/117/04
- Tender type
- Open
- Source
- Gujarat nProcure (GIL)
- Last checked on the portal
- 13 Nov 2026, 3:58 am IST
Always verify details on the official portal before bidding.
Tenders most like this one
Open Buildings tenders closest to it in work and place
- Buildings13 days left
New Construction of Staff Quarters C Type 3 Unit & D Type 1 Unit Total 4 Unit at PHC Garkhadi Ta.Subir Dist.Dang
Work period 11 months; EMD exemption allowed
Gujarat
PIU-Project Implementation Unit Zone - 7 Navsari
₹1.6 croreCloses 26 Nov, 6:00 pm - Buildings3 days left
Construction of New Quarter No-4 Staff Quarters At.-Baria, Range.-Baria, Division.-Dev.Baria
Work period 3 months; EMD exemption allowed
Gujarat
CP-Dy.Conservator of Forests - Baria
EMD ₹80,000Closes 16 Nov, 6:00 pm - Buildings4 days left
Construction of New Quarter No-1 Staff Quarters At.- Limkheda, Range.-Limkheda, Division.-Dev.Baria
Work period 3 months; EMD exemption allowed
Gujarat
CP-Dy.Conservator of Forests - Baria
EMD ₹25,000Closes 17 Nov, 6:00 pm - Buildings4 days left
Construction of New Quarter No-1 Staff Quarters At.- Rampur, Range.-Dhanpur, Division.-Dev.Baria
Work period 3 months; EMD exemption allowed
Gujarat
CP-Dy.Conservator of Forests - Baria
EMD ₹15,000Closes 17 Nov, 6:00 pm - Buildings3 days left
Construction of New Quarter No-3 Field Staff Quarters At.-Sagatala, Range.-Sagatala, Division.-Dev.Baria
Work period 3 months; EMD exemption allowed
Gujarat
CP-Dy.Conservator of Forests - Baria
EMD ₹55,000Closes 16 Nov, 6:00 pm - Buildings4 days left
Construction of New Quarter No-3 Staff Quarters At.-Dudhiya, Range.-Sarjumi, Division.-Dev.Baria
Work period 3 months; EMD exemption allowed
Gujarat
CP-Dy.Conservator of Forests - Baria