Skip to content
WooTenders
Open, 7 days leftDrains & sewerageGujarat nProcure (GIL) Tender ID 365508

Upgrade Drainage Line & SWD Line Network, Maintanace Work and Breakdown Repairing Works in Diiff.T.P.Road and Diff.chwali Area

Read the full title from the notice

Upgrade Drainage Line & SWD Line Network, Maintanace Work and Breakdown Repairing Works in Diiff.T.P.Road and Diff.chwali Area, Diff.gamtal Area and other Require Differant Places in Different Ward of West Zone”(A.R.C. TENDER) (Re-Tender)

AMC-West Zone- Engineering (Sub Zone-1)

Ahmedabad, Ahmedabad district, Gujarat

Estimated contract value
₹3 crore
EMD
₹3,00,000
Bid security, refunded after the bid · Exemption allowed (per portal)
Tender fee
₹3,600
Paid with the bid, not refunded
Bids close
26 Nov 2026, 6:00 pm IST
7 days left

Summary

Work period 12 months; re-tender; EMD exemption allowed

Work duration 360 days · bids valid 120 days

AI summary. Check the official portal before you bid.

Scope of work

  • Drains & sewerage
  • Drains & nala
Work duration
360 days
From the official tender record

Eligibility

Submission checklist

Bid validity
120 days

Documents the portal asks bidders to upload

  • Provide Scan Copy of tender Fee · Preliminary Stage
  • Provide Scan copy of EMD · Preliminary Stage
  • Provide Scan copy of Registration Certificate · Preliminary Stage
  • Other Supporting Documents as per tender documents · Preliminary Stage
  • Provide any proof of Bid Processing Fee · Documents required For Form - Tender Fee Form
  • Provide any proof of EMD Document · Documents required For Form - Emd Fee Form

Commercial terms

Contract value, EMD, tender fee and performance security are separate amounts; they are never added up.

Evaluation

Tender documents

Every file the department published. Unlock this tender to download them.

  • PDF

    Tender No. 75.pdf

    Tender No. 75.pdf

    Locked

Key dates

  1. Published13 Nov 2026, 6:00 pm IST
  2. Bids accepted from13 Nov 2026, 6:00 pm IST
  3. Bids close26 Nov 2026, 6:00 pm IST
  4. Bid opening27 Nov 2026, 3:00 pm IST

Location and buyer

Ahmedabad

Ahmedabad district, Gujarat

Only the district is known; the tender doesn't name the exact site

Who issued it

  1. AMC-West Zone- Engineering (Sub Zone-1)
More tenders from AMC-West Zone- Engineering (Sub Zone-1) →

Changes, clarifications and contacts

Reference

Tender ID
365508
Reference
3/26-27 (T.N.75)
Tender type
Open
Source
Gujarat nProcure (GIL)
Last updated
13 Nov 2026, 7:57 pm IST

Always verify details on the official portal before bidding.