Skip to content
WooTenders
Open, 6 days leftElectricalGeM Tender ID GEM/2026/B/8076900

Electrical Engg SMART EV LAB PROPOSAL

Science & Technology Department Bihar, Government of India

Electrical in Supaul, by Science & Technology Department Bihar.

Estimated value
Value not stated
EMD
—
Tender fee
—
Bids close
6 days left
6 Nov 2026, 1:00 pm

Key dates

  1. Published29 Sept 2026, 12:53 pm
  2. Bids accepted from29 Sept 2026, 12:53 pm
  3. Bids close6 Nov 2026, 1:00 pm

Where the work is

Supaul

Supaul district

Marked at block level

See the area on Google Maps

Who issued it

  1. Government of India
  2. Science & Technology Department Bihar

The work

  • Electrical
  • Medical & lab

Bid end

26-10-2026 13:00:00. Bid End Date/Time | 26-10-2026 13:00:00page 1

Bid opening

27-10-2026 13:00:00. Bid Opening | Date/Time | 27-10-2026 13:00:00page 1

Offer validity

80 (Days). Bid Offer | Validity (From End Date) | 80 (Days)page 1

Type of bid

Two Packet Bid. Type of Bid | Two Packet Bidpage 2

Reverse auction

Yes. Bid to RA enabled | Yespage 2

Evaluation method

Total value wise evaluation. Evaluation Method | Total value wise evaluationpage 3

AI summary — verify on the official portal

Tender documents

Every file the department published. Unlock this tender to download them: files come straight from the official portal, and WooTenders keeps no copies.

  • PDF

    9939041.pdf

    Bid document

    Locked

What bidders need

Locked: shown after unlocking
  • 1 tender documents to download
  • 4 eligibility criteria, with clause and page
  • 3 documents to submit

Reference

Tender ID
GEM/2026/B/8076900
Source
GeM
Last checked on the portal
30 Oct 2026, 2:15 pm

Always verify details on the official portal before bidding.

More open tenders near this one

Within 50 km, nearest first.

  1. Construction of Laboratory Class Room at (1) Janta Bachha High School, Block- Raghopur, (2) L.K.A. High School, Block- Birpur Under Supaul District ( Group No- PM-L36C) under PM SHRI Scheme.

    Raghopur, Birpur, Supaul district

    Bihar State Educational Infrastructure Development Corporation Limited, HQ

    ₹31.05 lakhBuildings2 days left
  2. Construction of Laboratory Class Room at (1) Bihari Gumaita Higher Secondary School, Block- Saraigarh Bhaptiyahi (2) +2 Senior Secondary School Sukhpur, Block- Supaul, (3) High School Kishnapur, Block- Kishnapur Under Supaul District ( Group No- PM-L36E) under PM SHRI Scheme.

    Saraigarh Bhaptiyahi, Supaul, Supaul district

    Bihar State Educational Infrastructure Development Corporation Limited, HQ

    ₹46.58 lakhBuildings2 days left
  3. Construction of New Control Room Building at 33/11 KV PSS at Pipra under Civil division Supaul

    Pipra, Supaul, Supaul district

    Civil

    ₹84.04 lakhBuildings3 days left
  4. CONSTRUCTION OF TOILET COMPLEX IN CAMPUS OF SUBDIVISIONAL CIVIL COURT BIRPUR, DIST -SUPAUL FOR THE F-YEAR 2026-27

    Birpur, Supaul, Supaul district

    Supaul Division

    ₹33.55 lakhBuildings5 days left
  5. RENOVATION OF SAHARSA SUB-BRANCH AND SUPAUL SUB-BRANCH CANAL AND ITS DISTRIBUTION SYSTEMS UNDER IRRIGATION DIVISION SAHARSA

    Kahara, Supaul, Saharsa, Supaul districts

    IRRIGATION CIRCLE, SAHARSA

    ₹15.29 croreBuildings11 days left
  6. CIVIL LAB AND CONSULTANCY REQUIREMENT

    Supaul, Supaul district

    Science & Technology Department Bihar

    Value not statedMedical & lab15 days left