Skip to content
WooTenders

Water supply tenders in Uttar Pradesh

741 open Water supply tenders in Uttar Pradesh, from GeM and central and state e-procurement portals. Closing soonest first, with value, EMD and documents.

  1. Lab, testing & survey equipment7 hours left

    Construction/Installation of 03 Nos. Medium Depth New Piezometers at different places in Sant Ravidas Nagar (Bhadohi) District

    03 nos. of Medium Depth New Piezometers; work period 1 month; open tender in two covers (technical and financial)

    Mirzapur-Cum-Vindhyachal, Mirzapur district, Uttar Pradesh

    Sr. Geophysicist, GWD Dn- Mirzapur (Geophysical)

    EMD ₹18,000Closes 18 Nov, 9:00 am
  2. Water supply7 hours left

    Construction of Roof Top Rain Water Harvesting Structure at Narottam Singh Padam Singh Rajkiya Snatakottar Mahavidyalay, Magarha, Mirzapur

    Work period 1 month; open tender in two covers (technical and financial)

    Mirzapur-Cum-Vindhyachal, Mirzapur district, Uttar Pradesh

    Sr. Geophysicist, GWD Dn- Mirzapur (Geophysical)

    EMD ₹44,000Closes 18 Nov, 9:00 am
  3. Lab, testing & survey equipment7 hours left

    Construction/Installation of 04 Nos. Medium Depth New Piezometers at different places in Mirzapur District

    04 nos. of Medium Depth New Piezometers; work period 1 month; open tender in two covers (technical and financial)

    Mirzapur-Cum-Vindhyachal, Mirzapur district, Uttar Pradesh

    Sr. Geophysicist, GWD Dn- Mirzapur (Geophysical)

    EMD ₹24,000Closes 18 Nov, 9:00 am
  4. Water supply7 hours left

    Construction of Roof Top Rain Water Harvesting Structure at Shree Gandhi Vidyalay Intermediate College, Kachwa, Mirzapur

    Work period 1 month; open tender in two covers (technical and financial)

    Mirzapur-Cum-Vindhyachal, Mirzapur district, Uttar Pradesh

    Sr. Geophysicist, GWD Dn- Mirzapur (Geophysical)

    EMD ₹43,500Closes 18 Nov, 9:00 am
  5. Water supply7 hours left

    Construction of Roof Top Rain Water Harvesting Structures at Janta Janardan Inter College, Bhudkuda, Mirzapur

    Work period 1 month; open tender in two covers (technical and financial)

    Mirzapur-Cum-Vindhyachal, Mirzapur district, Uttar Pradesh

    Sr. Geophysicist, GWD Dn- Mirzapur (Geophysical)

    EMD ₹21,500Closes 18 Nov, 9:00 am
  6. Water supply8 hours left

    Construction of Roof Top Rain Water Harvesting and Ground Water Recharging at Rajkiya Inter College Northa Kasganj

    Work period 3 months; open tender in two covers (technical and financial)

    Aligarh, Aligarh district, Uttar Pradesh

    Executive Engineer Groundwater Department Aligarh (Mechanical)

    ₹19 lakhCloses 18 Nov, 10:00 am
  7. Water supply8 hours left

    Construction of Roof Top Rain Water Harvesting and Ground Water Recharging at PM SHRI Jawahar Navodaya Vidyalaya, Begaur, Etah

    Work period 3 months; open tender in two covers (technical and financial)

    Aligarh, Aligarh district, Uttar Pradesh

    Executive Engineer Groundwater Department Aligarh (Mechanical)

    ₹33.19 lakhCloses 18 Nov, 10:00 am
  8. Water supply8 hours left

    Construction of Roof Top Rain Water Harvesting and Ground Water Recharging at Christian Agricultural Inter College, Etah

    Work period 3 months; open tender in two covers (technical and financial)

    Aligarh, Aligarh district, Uttar Pradesh

    Executive Engineer Groundwater Department Aligarh (Mechanical)

    ₹19 lakhCloses 18 Nov, 10:00 am
  9. Water supply8 hours left

    Construction of Roof Top Rain Water Harvesting and Ground Water Recharging at Rajkiya Balika Inter College, Etah

    Work period 3 months; open tender in two covers (technical and financial)

    Aligarh, Aligarh district, Uttar Pradesh

    Executive Engineer Groundwater Department Aligarh (Mechanical)

    EMD ₹32,300Closes 18 Nov, 10:00 am
  10. Water supply8 hours left

    Construction of Roof Top Rain Water Harvesting and Ground Water Recharging at Ganjdundwara College, Ganjdundwara Kasganj

    Work period 3 months; open tender in two covers (technical and financial)

    Aligarh, Aligarh district, Uttar Pradesh

    Executive Engineer Groundwater Department Aligarh (Mechanical)

    ₹33.19 lakhCloses 18 Nov, 10:00 am
  11. Water supply9 hours left

    HDPE pipeline laying in Wards 1 and 2, Nagar Panchayat Jagner, Agra

    HDPE pipeline along the Dhansu shop, thana and chowk stretches and several named house stretches in Wards 1 and 2; open tender in two covers

    Jagner, Agra district, Uttar Pradesh

    Nagar Panchayat Jagner Agra

    EMD ₹1.26 lakhCloses 18 Nov, 11:00 am
  12. Water supply9 hours left

    Drinking water system improvement at various places, RO, sewer and cooler work, Nagar Panchayat Jagner, Agra

    Drinking water improvement work at various places in Jagner, including RO units and cooler work; open tender in two covers (technical and financial)

    Jagner, Agra district, Uttar Pradesh

    Nagar Panchayat Jagner Agra

    EMD ₹29,880Closes 18 Nov, 11:00 am
  13. Water supply9 hours left

    Operation and repair of various drains, pump houses and water supply pipeline in Nagar Panchayat Jagner, Agra

    Operation and repair work on various tube wells, pump houses and water supply pipeline; open tender in two covers

    Jagner, Agra district, Uttar Pradesh

    Nagar Panchayat Jagner Agra

    EMD ₹1.13 lakhCloses 18 Nov, 11:00 am
  14. Roads & bridges10 hours left

    Special repair work on Pipeline to Shahpur road

    Work period 2 months; open tender in two covers (technical and financial); Class D registration needed

    Ghaziabad, Ghaziabad district, Uttar Pradesh

    EE Construction Division-2 PWD Gaziabad

    EMD ₹2.02 lakhCloses 18 Nov, 12:00 pm
  15. Water supply11 hours left

    Installation of 2 rainwater harvesting systems in PWD residential complex at Circuit House, Jhansi district, Uttar Pradesh

    Installation of two rainwater harvesting systems in the PWD residential complex at the Circuit House premises for 60 days; two covers (technical and financial); Class D registration, open tender

    Jhansi, Jhansi district, Uttar Pradesh

    Provincial Division PWD Jhansi

    EMD ₹1.45 lakhCloses 18 Nov, 12:50 pm
  16. Water supply11 hours left

    Nagar Panchyat Haisar Bazar Dhanghata ward no 01 me subai kuteshwarnath subhash ramyaga ke makan marg per with cover jal nikasi nala nirman kary 05

    Delivery within 9 months; open tender in two covers (technical and financial); Class A registration needed; EMD exemption allowed

    Sant Kabir Nagar, Sant Kabir Nagar district, Uttar Pradesh

    Nagar Panchayat Haisar Bazaar Dhanghata Sant Kabir Nagar

    ₹2.5 croreCloses 18 Nov, 1:00 pm
  17. Water supply11 hours left

    Pipeline extension work in Word No. 1, Nasopur, Mau

    pipeline extension along Bhawanathpur road near Dih Baba Sthan, Ramlila ground and Pramod Kirana, beside the primary school lane; 120 days; two covers (technical and financial); open tender

    Mau, Mau district, Uttar Pradesh

    Nagar Palika Parishad Mau Mau

    ₹37.21 lakhCloses 18 Nov, 1:00 pm
  18. Water supply11 hours left

    Pipeline extension from 20 HP bore in Kandheri Manyver Kanshi Ram awas, Ward 14, Nagar Palika Parishad Mau

    Pipeline extension to houses and blocks in Kandheri Manyver Kanshi Ram awas, fed by a 20 HP bore; 120 days; two covers; open tender; A class registration needed

    Mau, Mau district, Uttar Pradesh

    Nagar Palika Parishad Mau Mau

    ₹22.55 lakhCloses 18 Nov, 1:00 pm
  19. Water supply11 hours left

    Pipeline extension in Premnagar Chakiya mohalla near flyover, Nagar Palika Parishad Mau, Uttar Pradesh

    Pipeline extension work in Premnagar Chakiya mohalla up to the D.A.B. School branch boundary; 120 days; open tender in two covers; Class A registration needed

    Mau, Mau district, Uttar Pradesh

    Nagar Palika Parishad Mau Mau

    ₹27.47 lakhCloses 18 Nov, 1:00 pm
  20. Water supply11 hours left

    Tubewell and pitch road construction in Ward 4, Kajha Khurd, Mau

    Pitch road construction near Chandramuni's field, Rameshchandra and Rajeshwar's tubewell, and Shivmuni and Ramjatan Chauhan's house over about 180 days; open tender in two covers; A class registration needed

    Mau, Mau district, Uttar Pradesh

    Nagar Palika Parishad Mau Mau

    ₹25.46 lakhCloses 18 Nov, 1:00 pm
  21. Roads & bridges11 hours left

    Water pipeline work in Mohalla Ward 19, Achar/Thakurmanpur, Nagar Palika Parishad Mau

    Pipe laying work along the road from Mau towards Chiraiyakot, near the primary school; 120 days; open tender in two covers (technical and financial); A class registration needed

    Mau, Mau district, Uttar Pradesh

    Nagar Palika Parishad Mau Mau

    ₹38.38 lakhCloses 18 Nov, 1:00 pm
  22. Water supply11 hours left

    Nagar Panchyat Haisar Bazar Dhanghata me suraina Malauli mukhy marg per vipin ke makan se ramjeet Chandra Prakash ke makan marg per cover jal nikasi nala…

    Delivery within 9 months; open tender in two covers (technical and financial); Class A registration needed; EMD exemption allowed

    Sant Kabir Nagar, Sant Kabir Nagar district, Uttar Pradesh

    Nagar Panchayat Haisar Bazaar Dhanghata Sant Kabir Nagar

    ₹1.2 croreCloses 18 Nov, 1:00 pm
  23. Water supply11 hours left

    Pipeline extension work at Chandrabhanpur-Raghopatti road near Ravidas Mandir, Ward 9, Nagar Palika Parishad Mau

    Pipeline extension work for 120 days; two covers (technical and financial); open tender; A class registration needed

    Mau, Mau district, Uttar Pradesh

    Nagar Palika Parishad Mau Mau

    ₹34.36 lakhCloses 18 Nov, 1:00 pm
  24. Water supply11 hours left

    Pipeline laying on both sides of the drain from Nesar Ahmad's house to Lakender's house in Ward 25, Badi Kamhariya, Mau

    Pipeline extension work on both sides of the drain near Pulia, from Nesar Ahmad's house, Prakash Chauhan's field to Lakender's house; 120 days; two covers; A class registration needed

    Mau, Mau district, Uttar Pradesh

    Nagar Palika Parishad Mau Mau

    ₹20.74 lakhCloses 18 Nov, 1:00 pm
  25. Water supply11 hours left

    Pipeline extension in Ward 17/10, Mau, from Azamgarh Road to Gomti river near Achay Pan ki Gomti, Nagar Palika Parishad Mau

    Pipeline extension work between named points in Mau; 120 days; two covers (technical and financial); open tender; A class registration needed

    Mau, Mau district, Uttar Pradesh

    Nagar Palika Parishad Mau Mau

    ₹37.77 lakhCloses 18 Nov, 1:00 pm
  26. Water supply11 hours left

    Water pipeline replacement in Ward 15, Belchaura (Bichalapura), from Ramdyal's house to Brijvasi Teju Chauhan's house, Nagar Palika Parishad Mau

    Delivery within 4 months; open tender in two covers (technical and financial); Class A registration needed

    Mau, Mau district, Uttar Pradesh

    Nagar Palika Parishad Mau Mau

    ₹14.5 lakhCloses 18 Nov, 1:00 pm
  27. Water supply11 hours left

    Pipeline extension in Ward 3 Baddhuwa Gogam Vandevi area, Nagar Palika Parishad Mau

    Pipeline extension along lanes near Vandevi mod and Katara Road, reaching houses of Tuntun Singh and Raju Singh; 120 days; two covers; open tender; A class registration needed

    Mau, Mau district, Uttar Pradesh

    Nagar Palika Parishad Mau Mau

    ₹39.86 lakhCloses 18 Nov, 1:00 pm
  28. Water supply11 hours left

    Water pipeline extension from Sheetala Mata temple Dham gate to near Dr. Neyaz Ahmad's house, Nagar Palika Parishad Mau

    Pipeline extension from the Sheetala Mata temple Dham gate to near Dr. Neyaz Ahmad's house; 120 days; two covers (technical and financial); A class registration needed; open tender

    Mau, Mau district, Uttar Pradesh

    Nagar Palika Parishad Mau Mau

    ₹12.21 lakhCloses 18 Nov, 1:00 pm
  29. Water supply11 hours left

    Nagar Panchyat Haisar Bazar Dhanghata ke ward no 14 Dudhra mukhy marg se surendra Radheshyam Vrindavan vanwari ke ghar marg per cover jal nikasi hetu nala…

    Delivery within 9 months; open tender in two covers (technical and financial); Class A registration needed; EMD exemption allowed

    Sant Kabir Nagar, Sant Kabir Nagar district, Uttar Pradesh

    Nagar Panchayat Haisar Bazaar Dhanghata Sant Kabir Nagar

    ₹2 croreCloses 18 Nov, 1:00 pm
  30. Water supply11 hours left

    Pipeline extension in Ward 1, Nasopur, covering several localities and schools, Nagar Palika Parishad Mau

    Pipeline extension work for 120 days; two covers (technical and financial); open tender; A class registration needed

    Mau, Mau district, Uttar Pradesh

    Nagar Palika Parishad Mau Mau

    ₹19.1 lakhCloses 18 Nov, 1:00 pm
  31. Water supply11 hours left

    Nagar Panchyat Haisar Bazar Dhanghata ward no 11 dhanghata mukh marg se pardeep mauriya chandrika ke ghar via ramkishun ke ghar evam durvijay ram lagan Ajay…

    Delivery within 9 months; open tender in two covers (technical and financial); Class A registration needed; EMD exemption allowed

    Sant Kabir Nagar, Sant Kabir Nagar district, Uttar Pradesh

    Nagar Panchayat Haisar Bazaar Dhanghata Sant Kabir Nagar

    ₹1.2 croreCloses 18 Nov, 1:00 pm
  32. Water supply11 hours left

    Pipeline extension in ward 17, Achar near Chatti, Nagar Palika Parishad Mau, Uttar Pradesh

    Delivery within 4 months; open tender in two covers (technical and financial); Class A registration needed

    Mau, Mau district, Uttar Pradesh

    Nagar Palika Parishad Mau Mau

    ₹24.92 lakhCloses 18 Nov, 1:00 pm
  33. Water supply11 hours left

    Pitch road construction in Ward 5, Sahadatpura Purvi, from Parshu Ram's house to Shankar Pahalwan's house, Nagar Palika Parishad Mau

    Pitch road works on Indrapur-Bhalya road; 180 days; open tender in two covers (technical and financial); A class registration needed

    Mau, Mau district, Uttar Pradesh

    Nagar Palika Parishad Mau Mau

    ₹23.3 lakhCloses 18 Nov, 1:00 pm
  34. Water supply11 hours left

    Pipeline extension in Ward 16 Salhabad near Shiv Mandir and Shikari Samiti, Nagar Palika Parishad Mau

    Pipeline extension in lanes near Shiv Mandir, Shikari Samiti and the primary school in Salhabad; 120 days; two covers; open tender; A class registration needed

    Mau, Mau district, Uttar Pradesh

    Nagar Palika Parishad Mau Mau

    ₹12.75 lakhCloses 18 Nov, 1:00 pm
  35. Water supply11 hours left

    Pipeline extension work in Mohalla Astupura, Mau, from near Anas Automobile to Haji Fakruddin's house

    Pipeline extension in Mohalla Astupura near Dr. Neyaz Ahmad, Mumtaz Interiors, Star Tiles and Shriya Mobile; 120 days; two covers (technical and financial); B class registration needed

    Mau, Mau district, Uttar Pradesh

    Nagar Palika Parishad Mau Mau

    ₹9.45 lakhCloses 18 Nov, 1:00 pm
  36. Water supply11 hours left

    Side wall and CC work in Ward 4, Kanjha Khurd, from Anganwadi centre via Shravan Rai's tubewell to the railway boundary, Nagar Palika Parishad Mau

    Side wall and CC work from Anganwadi centre via Shravan Rai's tubewell to the railway boundary; 120 days; two covers (technical and financial); A class registration needed

    Mau, Mau district, Uttar Pradesh

    Nagar Palika Parishad Mau Mau

    ₹24.01 lakhCloses 18 Nov, 1:00 pm
  37. Water supply11 hours left

    Pipeline extension and road strengthening work for drinking water supply from the main road of ward no. 16 of Bagar Panchayat Hasar Bazar Ghanghay to the…

    Work period 9 months; open tender in two covers (technical and financial); Class A registration needed; EMD exemption allowed

    Sant Kabir Nagar, Sant Kabir Nagar district, Uttar Pradesh

    Nagar Panchayat Haisar Bazaar Dhanghata Sant Kabir Nagar

    ₹2.4 croreCloses 18 Nov, 1:00 pm
  38. Roads & bridges11 hours left

    Installation of 20 HP tube well pump house near Badhuwa godown on Gorakhpur to Varanasi road, Nagar Palika Parishad Mau

    20 HP tube well pump with pump house installation; 120 days; open tender in two covers (technical and financial); A class registration needed

    Mau, Mau district, Uttar Pradesh

    Nagar Palika Parishad Mau Mau

    ₹39.99 lakhCloses 18 Nov, 1:00 pm
  39. Water supply11 hours left

    Pipeline extension and road strengthening work for drinking water supply in Ward No. 10 of Bagar Panchayat Hesar Bazar Ghanghata from Ramjankari Mai via Bal…

    Work period 9 months; open tender in two covers (technical and financial); Class A registration needed; EMD exemption allowed

    Sant Kabir Nagar, Sant Kabir Nagar district, Uttar Pradesh

    Nagar Panchayat Haisar Bazaar Dhanghata Sant Kabir Nagar

    ₹1.19 croreCloses 18 Nov, 1:00 pm
  40. Water supply11 hours left

    Pipeline extension work at several points in Ward 9, Raghopatti, near Ravidas Mandir to Sanbeen School, Nagar Palika Parishad Mau

    Pipeline extension from near Ravidas Mandir to near Sanbeen School, covering Dharmbeer tent, Paudhashala and Balgopal Narsari; 120 days; two covers (technical and financial); A class registration needed

    Mau, Mau district, Uttar Pradesh

    Nagar Palika Parishad Mau Mau

    ₹36.1 lakhCloses 18 Nov, 1:00 pm
  41. Water supply12 hours left

    Laying of 110 mm HDPE pipeline from near Shri Rohit's house to near Shri Arun's house in Makbara Ward 4, Najibabad

    Laying 110 mm HDPE pipeline from near Shri Rohit's house to near Shri Arun's house in Moh-Makbara; 90 days; open tender in two covers (technical and financial)

    Najibabad, Bijnor district, Uttar Pradesh

    Nagar Palika Parishad Nazibabad Bijnor

    EMD ₹19,500Closes 18 Nov, 2:00 pm
  42. Water supply12 hours left

    Laying of 110 mm HDPE pipeline in Ward 9, Shyamli, Nagar Palika Parishad Najibabad

    110 mm HDPE pipeline across several stretches in Shyamli with multiple house-to-house sections; 90 days; open tender in two covers; OTHERS class registration

    Najibabad, Bijnor district, Uttar Pradesh

    Nagar Palika Parishad Nazibabad Bijnor

    EMD ₹47,000Closes 18 Nov, 2:00 pm
  43. Water supply12 hours left

    Laying 150mm D.I. K7 raising main pipeline from tubewell to raising shifting work near temple in Shyamli Ward 9, Najibabad

    Laying 150mm D.I. K7 raising main pipeline from tubewell to shifting work near temple; 90 days; open tender in two covers

    Najibabad, Bijnor district, Uttar Pradesh

    Nagar Palika Parishad Nazibabad Bijnor

    EMD ₹45,600Closes 18 Nov, 2:00 pm
  44. Water supply12 hours left

    Laying 160 mm HDPE pipeline from Jhanda Chowk to Hariom Furniture in Ward 2, Mohalla Rampura, Najibabad, Bijnor

    Laying 160 mm HDPE pipeline from near Jhanda Chowk to near Hariom Furniture; 90 days; open tender in two covers

    Najibabad, Bijnor district, Uttar Pradesh

    Nagar Palika Parishad Nazibabad Bijnor

    EMD ₹1.46 lakhCloses 18 Nov, 2:00 pm
  45. Water supply12 hours left

    Replacement of 110 mm dia PVC pipe line 100 mtr from Sri Shiv Temple to Sri Shanti Kanaujiya House in Karwalo Nagar Ward-06 Bhannanapurwa, Kanpur

    Work period 1 month; open tender in two covers (technical and financial)

    Kanpur, Kanpur Nagar district, Uttar Pradesh

    Jal kal Vibhag Nagar Nigam Kanpur

    EMD ₹20,000Closes 18 Nov, 2:00 pm
  46. Water supply12 hours left

    Laying of 160 mm HDPE pipeline in Ward 8, Havelitala, Nagar Palika Parishad Najibabad

    160 mm HDPE pipeline from near the Goshala to near Shri Guddu Member's house; 90 days; open tender in two covers; OTHERS class registration

    Najibabad, Bijnor district, Uttar Pradesh

    Nagar Palika Parishad Nazibabad Bijnor

    EMD ₹32,500Closes 18 Nov, 2:00 pm
  47. Water supply12 hours left

    Laying of 110mm HDPE pipeline in Moh Rampura Ward 20, Najibabad, Nagar Palika Parishad Nazibabad Bijnor

    110mm HDPE pipe laying from Munsafi Gate to Munsafi Tanki, Jhanda Chowk and Bypass Road areas; work period 90 days; two covers (technical and financial); open tender

    Najibabad, Bijnor district, Uttar Pradesh

    Nagar Palika Parishad Nazibabad Bijnor

    EMD ₹82,900Closes 18 Nov, 2:00 pm
  48. Water supply12 hours left

    Balance Works for Laying and Associated Works Section-III of Srikakulam-Angul Pipeline Project (Part B) of M/S Gail (India) Limited

    Work period 3 months; open tender in two covers (technical and financial); EMD exemption allowed

    Gautam Buddha Nagar, Gautam Buddha Nagar district, Uttar Pradesh

    Mecon Limited-PMC

    EMD ₹15 lakhCloses 18 Nov, 2:00 pm
  49. Water supply12 hours left

    Tube well boring and 10 HP submersible pump installation at 2 sites, Mathura district, UP Small Industries Corporation

    Tube well boring and installation of 10 HP submersible pump at 2 places; work period 180 days; single cover bid

    Agra, Agra district, Uttar Pradesh

    UP Small Industries Corporation Ltd

    ₹6.78 lakhCloses 18 Nov, 2:00 pm
  50. Water supply12 hours left

    Laying of 150 mm D.I. K7 raising main pipeline and shifting work in Moh Jabtaganj Harijan Basti, Ward 1, Najibabad

    Laying 150 mm D.I. K7 raising main pipeline from a tube well with shifting work; 90 days; open tender in two covers

    Najibabad, Bijnor district, Uttar Pradesh

    Nagar Palika Parishad Nazibabad Bijnor

    EMD ₹42,800Closes 18 Nov, 2:00 pm

Other work in Uttar Pradesh