Skip to content
WooTenders

Roads & bridges tenders in Arunachal Pradesh

29 open Roads & bridges tenders in Arunachal Pradesh, from GeM and central and state e-procurement portals. Closing soonest first, with value, EMD and documents.

  1. Roads & bridges2 days left

    Construction of FSB over Oye Nallah (Location is Approx. 14 Km away From Last Road Head Ghora) Under AOR of 31 BN ITBP (Ar.P)

    Work period 12 months; open tender in two covers (technical and financial)

    Upper Subansiri, Upper Subansiri district, Arunachal Pradesh

    IG, North Eastern FTR, Itbp

    ₹26.02 lakhCloses 20 Nov, 5:00 pm
  2. Repair & maintenance2 days left

    Repair and Maintenance of FSB Near Lung Under AOR of 31 BN ITBP (Ar.P)

    Work period 12 months; open tender in two covers (technical and financial)

    Upper Subansiri, Upper Subansiri district, Arunachal Pradesh

    IG, North Eastern FTR, Itbp

    ₹24.55 lakhCloses 20 Nov, 6:00 pm
  3. Roads & bridges3 days left

    Improvement of road from NH513 Gobuk to Harkam via Herak Army camp in Upper Siang District

    Work period 3 years; open tender in a single cover; II class registration needed; EMD exemption allowed

    Upper Siang, Upper Siang district, Arunachal Pradesh

    DIV- Yingkiong - PWDAP

    ₹7.87 croreCloses 21 Nov, 11:00 am
  4. Roads & bridges5 days left

    Repair of PCC footpaths in camp area of COB Nampong, Assam Rifles, Jairampur, Arunachal Pradesh

    Repair of PCC at various footpaths in the camp area of COB Nampong; open tender in two covers; tenderer class as per tender document

    Jairampur, Changlang district, Arunachal Pradesh

    Assam Rifles - MHA

    EMD ₹7,820Closes 23 Nov, 11:00 am
  5. Roads & bridges5 days left

    Repair of footpath at HQ Company, 21 Assam Rifles, Jairampur, Arunachal Pradesh

    Repair of footpath at HQ Company; 30-day work period; open tender in two covers

    Jairampur, Changlang district, Arunachal Pradesh

    Assam Rifles - MHA

    EMD ₹6,900Closes 23 Nov, 11:00 am
  6. Planning, GIS & survey5 days left

    Sub Soil Investigation, Design, Drawing and Constr of 80 MTR Span Major PMT Shere Thapa Bridge Over Ismi-Siko Nallah Including Approach Roads at KM 0.630 on…

    Delivery within 2 years; open tender in two covers (technical and financial)

    All Arunachal Pradesh

    HQ CE(P) Arunank(Naharlagun) - BRO

    ₹11.6 croreCloses 23 Nov, 4:00 pm
  7. Roads & bridges5 days left

    Construction of FSB at Meni Valley axis Sieera-7 under AOR of 10 Bn ITBP, 43 km from last road head Doginalo, Arunachal Pradesh

    Construction of an FSB at Meni Valley axis Sieera-7, about 43 km from last road head Doginalo; 360 days; open tender in two covers

    Upper Subansiri, Upper Subansiri district, Arunachal Pradesh

    IG, North Eastern FTR, Itbp

    ₹1.1 croreCloses 23 Nov, 4:00 pm
  8. Roads & bridges5 days left

    Construction of FSB between CP-04 and CP-05 at Sierra-9, 31st Bn ITBP, Arunachal Pradesh

    Construction of FSB (forward shelter building) about 37 km from last road head; work period 365 days; two covers; open tender

    Papum Pare, Papum Pare district, Arunachal Pradesh

    IG, North Eastern FTR, Itbp

    ₹1.02 croreCloses 23 Nov, 5:30 pm
  9. Roads & bridges5 days left

    Construction of FSB between CP-07 and CP-06 at Sierra 9, Arunachal Pradesh, for 31st Battalion ITBP

    Construction of FSB between CP-07 and CP-06, about 45 km from last road head, for 365 days; open tender in two covers

    Papum Pare, Papum Pare district, Arunachal Pradesh

    IG, North Eastern FTR, Itbp

    ₹1.3 croreCloses 23 Nov, 6:30 pm
  10. Roads & bridges5 days left

    Construction of CC footpath and footsteps from FSB Ladum bridge to Jido Pokbir, Upper Siang, Arunachal Pradesh

    CC footpath and footsteps; 180 days; open tender in two covers; eligibility criteria apply

    Upper Siang, Upper Siang district, Arunachal Pradesh

    PD Upper Siang

    EMD ₹10,000Closes 23 Nov, 6:55 pm
  11. Roads & bridges6 days left

    Construction of 70R loading capacity bridge over Sibo Korong at Pasighat, East Siang district, Arunachal Pradesh, span 90 m

    Bridge of 90 m span with 70R loading capacity; 1095 days; open tender in two covers; eligibility criteria apply

    East Siang, East Siang district, Arunachal Pradesh

    DIV- Pasighat - PWDAP

    ₹45.65 croreCloses 24 Nov, 10:00 am
  12. Consultancy & advisory7 days left

    Onsultancy Services for Authority Engineer AE for supervision of Pango Jorging, Singa Anleye, Kamlang T Junction Deban and Kharsang Miao Vijaynagar packages of…

    Work period 9 years; open tender in two covers (technical and financial)

    Papum Pare, Papum Pare district, Arunachal Pradesh

    Corporate Office-New Delhi - NHIDCL

    EMD ₹10 lakhCloses 25 Nov, 3:00 pm
  13. Buildings7 days left

    Construction of FSB near Singrio (Sieera-9), 48 km from last road head, under 31st BN ITBP, Arunachal Pradesh

    Construction of FSB near Singrio, about 48 km from last road head, under AOR of 31st BN ITBP; 365 days; open tender in two covers

    Papum Pare, Papum Pare district, Arunachal Pradesh

    IG, North Eastern FTR, Itbp

    ₹1.15 croreCloses 25 Nov, 4:00 pm
  14. Roads & bridges7 days left

    Construction of FSB over Ojugo Nallah under AOR of 31 Bn ITBP, about 2 km from last road head Ghora, Arunachal Pradesh

    Construction of an FSB over Ojugo Nallah, about 2 km from last road head Ghora; 360 days; open tender in two covers

    Upper Subansiri, Upper Subansiri district, Arunachal Pradesh

    IG, North Eastern FTR, Itbp

    ₹63.46 lakhCloses 25 Nov, 4:00 pm
  15. Roads & bridges7 days left

    Construction of FSB at Sierra 09 near Chocker village, 31 Bn ITBP, Nacho, Arunachal Pradesh

    Construction of an FSB about 10 km from last road head Nacho; work period 360 days; two covers (technical and financial); open tender

    Upper Subansiri, Upper Subansiri district, Arunachal Pradesh

    IG, North Eastern FTR, Itbp

    ₹55.51 lakhCloses 25 Nov, 5:00 pm
  16. Roads & bridges8 days left

    Construction of major bridge at Ch. 28.200 of Hunli-Anini road (NH-313), Arunachal Pradesh under SARDP

    Major bridge built on EPC mode; 913 days; open tender in two covers

    Lower Dibang Valley, Lower Dibang Valley district, Arunachal Pradesh

    Corporate Office-New Delhi - NHIDCL

    ₹42.05 croreCloses 26 Nov, 3:00 pm
  17. Roads & bridges8 days left

    Construction of FSB near Pichu on Kilo-1 axis for 54th Bn ITBP, Arunachal Pradesh

    Construction of a forward support base near Pichu on Kilo-1 axis, about 64 km from last road head Milli; work period 365 days; open tender in two covers

    Papum Pare, Papum Pare district, Arunachal Pradesh

    IG, North Eastern FTR, Itbp

    ₹1.21 croreCloses 26 Nov, 4:00 pm
  18. Roads & bridges9 days left

    Construction of FSB Dharmu–Sangia at Kilo-2 axis for 54th Battalion ITBP, Arunachal Pradesh

    Construction of an FSB at Dharmu-Sangia on Kilo-2 axis, about 72 km from last road head Milli; 365 days; open tender in two covers

    Papum Pare, Papum Pare district, Arunachal Pradesh

    IG, North Eastern FTR, Itbp

    ₹1.44 croreCloses 27 Nov, 4:00 pm
  19. Roads & bridges9 days left

    Construction of FSB at BW Wate and Bibi, Kilo 1 Axis, 54 Bn ITBP area, Arunachal Pradesh, 26 km from Milli road head

    Work period 12 months; open tender in two covers (technical and financial)

    Kurung Kumey, Kurung Kumey district, Arunachal Pradesh

    IG, North Eastern FTR, Itbp

    ₹38.05 lakhCloses 27 Nov, 5:00 pm
  20. Roads & bridges12 days left

    Construction of FSB at Milli Gane, Kilo 2 Axis, 54 Bn ITBP area, Arunachal Pradesh, 11 km from Milli road head

    Work period 12 months; open tender in two covers (technical and financial)

    Kurung Kumey, Kurung Kumey district, Arunachal Pradesh

    IG, North Eastern FTR, Itbp

    ₹64.35 lakhCloses 30 Nov, 4:00 pm
  21. Roads & bridges13 days left

    Construction of seven log bridges at various locations on Kilo 1 axis, 54th Bn ITBP, Arunachal Pradesh

    Seven log bridges at various locations on Kilo 1 axis; work period 360 days; two covers; open tender

    Kurung Kumey, Kurung Kumey district, Arunachal Pradesh

    IG, North Eastern FTR, Itbp

    ₹93.76 lakhCloses 1 Dec, 4:00 pm
  22. Roads & bridges14 days left

    Construction of log bridge between Bakar and Kawachvi on Kilo1 axis of 54 Bn ITBP, about 87 km from last road head Milli, Arunachal Pradesh

    Construction of a log bridge between Bakar and Kawachvi, about 87 km from last road head Milli; 360 days; open tender in two covers

    Kurung Kumey, Kurung Kumey district, Arunachal Pradesh

    IG, North Eastern FTR, Itbp

    ₹36.32 lakhCloses 2 Dec, 5:00 pm
  23. Roads & bridges15 days left

    Construction of two log bridges at various locations on Kilo 2 axis, 54th Bn ITBP, Arunachal Pradesh

    Two log bridges at various locations on Kilo 2 axis; work period 360 days; two covers; open tender

    Kurung Kumey, Kurung Kumey district, Arunachal Pradesh

    IG, North Eastern FTR, Itbp

    ₹50.41 lakhCloses 3 Dec, 6:00 pm
  24. Roads & bridges16 days left

    Resurfacing of Likabali Basar road, km 25 to km 91.928, Arunachal Pradesh, Border Roads Organisation

    40 mm bituminous concrete with 60 mm DBM and road marking for resurfacing; 100 days; two covers; open tender

    All Arunachal Pradesh

    HQ CE(P) Brahmank(Pasighat) - BRO

    ₹27.96 croreCloses 4 Dec, 11:00 am
  25. Roads & bridges16 days left

    Construction of two wooden huts in Daporijo axis, AOR of 10th Bn ITBP Kimin, Arunachal Pradesh

    Two wooden huts of 20x30 ft each, about 50 km from last road head; work period 365 days; two covers; open tender

    Daporijo, Upper Subansiri district, Arunachal Pradesh

    IG, North Eastern FTR, Itbp

    ₹60.13 lakhCloses 4 Dec, 4:00 pm
  26. Roads & bridges16 days left

    Construction of FSB at Sage CG-Hush in Kilo 4 Axis (Location is Approx. 60 Km away from Last Road Head HOTAR) under AOR of 60 BN ITBP (Ar.P)

    Work period 1 year; open tender in two covers (technical and financial)

    Papum Pare, Papum Pare district, Arunachal Pradesh

    IG, North Eastern FTR, Itbp

    ₹1.2 croreCloses 4 Dec, 4:30 pm
  27. Roads & bridges19 days left

    Construction of 58.907 km Nacho–Bangte–Neying road on new green-field alignment in Arunachal Pradesh, Border Roads Organisation, EPC mode

    New green-field road from km 0 to km 58.907 to NHSL specifications on EPC mode; 1096 days; open tender in two covers (technical and financial)

    Papum Pare, Papum Pare district, Arunachal Pradesh

    ADG East(Guwahati) - BRO

    ₹498.89 croreCloses 7 Dec, 6:00 pm
  28. Roads & bridges29 days left

    Construction of Road Tapa Karu Sering Bagan New Alignment from KM 000 to KM 81 686 NET Length 81.686 KM Green Field Alignment to Nhsl Specifications in the AOR…

    From km 000 to 81; work period 1277 days; open tender in two covers (technical and financial)

    All Arunachal Pradesh

    ADG East(Guwahati) - BRO

    ₹664.91 croreCloses 17 Dec, 6:00 pm
  29. Roads & bridges42 days left

    Construction of Panchakshari Samdong road, km 0.00 to 15.294, Brahmank project, Arunachal Pradesh

    Construction of 15.294 km road from km 0.00 to km 15.294 on EPC mode to NHSL specifications; 730 days; two covers; open tender

    All Arunachal Pradesh

    HQ CE(P) Brahmank(Pasighat) - BRO

    ₹70.9 croreCloses 30 Dec, 11:00 am

Other work in Arunachal Pradesh