Construction of Panchakshari Samdong road, km 0.00 to 15.294, Brahmank project, Arunachal Pradesh
Read the full title from the noticeHide the full title
Construction of Road Panchakshari Samdong Between KM 0.00 to KM 15.294 to Nhsl Specifications under 1443 BCC/44 Brtf in AOR of Project Brahmank in Arunachal Pradesh on EPC Mode
HQ CE(P) Brahmank(Pasighat) - BRO, Dte General Border Roads Organisation
All Arunachal Pradesh
- Estimated contract value
- ₹70.9 crore
- EMD
- ₹70,90,000
- Bid security, refunded after the bid · No exemption (per portal)
- Tender fee
- ₹10,000
- Paid with the bid, not refunded
- Bids close
- 30 Dec 2026, 11:00 am IST
- 41 days left
Summary
Construction of 15.294 km road from km 0.00 to km 15.294 on EPC mode to NHSL specifications; 730 days; two covers; open tender
Work duration 730 days · bids valid 120 days · Two covers (technical and financial)
AI summary. Check the official portal before you bid.
Scope of work
- Roads & bridges
- Work duration
- 730 days
- From the official tender record
Eligibility
- Registration class
- As per Tender Document
- As listed on the portal; confirm it against the tender document.
- Pre-qualification
- As per RFP
Submission checklist
- Submission
- Two covers: a technical bid and a separate financial bid
- From the official tender record
- Bid validity
- 120 days
Commercial terms
Contract value, EMD, tender fee and performance security are separate amounts; they are never added up.
Evaluation
Tender documents
Every file the department published. Unlock this tender to download them.
- PDFLocked
Tender notice (NIT)
Tendernotice_1.pdf · 5.3 MB
- PDFLocked
Request for proposal (RFP)
RFP_P_S.pdf · 1.5 MB
- PDFLocked
DCA_P_S.pdf
DCA · 1.9 MB
- PDFLocked
Schedule.pdf
Schedule · 4.4 MB
- PDFLocked
Drawings / layout
BRIDGE_30mtr.pdf · 414 KB
- PDFLocked
Drawings / layout
BRIDGE_45mtr.pdf · 406 KB
- XLSLocked
Pricing schedule (BOQ: bill of quantities)
BOQ_896272.xls · 324 KB
- PDFLocked
Drawings / layout
Drawing_1_compressed.pdf · 19.8 MB
Key dates
- Published16 Nov 2026, 2:00 pm IST
- Bids accepted from9 Dec 2026, 11:00 am IST
- Pre-bid meeting9 Dec 2026, 12:00 pm IST
- Bids close30 Dec 2026, 11:00 am IST
- Bid opening31 Dec 2026, 11:00 am IST
Location and buyer
All Arunachal Pradesh
The work covers all of Bihar
Who issued it
- Dte General Border Roads Organisation
- HQ CE(P) Brahmank(Pasighat) - BRO
Changes, clarifications and contacts
- Clarification window
- 16 Nov 2026, 2:10 pm IST – 9 Dec 2026, 11:00 am IST
- Bids opened at
- HQ Chief Engineer Project Brahmank, Pasighat
Reference
- Tender ID
- 2026_BRO_798908_1
- Reference
- CE (P) BMK/05/2026-27(EPC)
- Tender type
- Open Tender
- Source
- Defence eProcurement
- Last updated
- 16 Nov 2026, 2:19 pm IST
Always verify details on the official portal before bidding.
Tenders most like this one
Open Roads & bridges tenders closest to it in work and place
- Roads & bridges18 days left
Construction of 58.907 km Nacho–Bangte–Neying road on new green-field alignment in Arunachal Pradesh, Border Roads Organisation, EPC mode
New green-field road from km 0 to km 58.907 to NHSL specifications on EPC mode; 1096 days; open tender in two covers (technical and financial)
Papum Pare, Papum Pare district, Arunachal Pradesh
ADG East(Guwahati) - BRO
₹498.89 croreCloses 7 Dec, 6:00 pm - Roads & bridges28 days left
Construction of Road Tapa Karu Sering Bagan New Alignment from KM 000 to KM 81 686 NET Length 81.686 KM Green Field Alignment to Nhsl Specifications in the AOR…
From km 000 to 81; work period 1277 days; open tender in two covers (technical and financial)
All Arunachal Pradesh
ADG East(Guwahati) - BRO
₹664.91 croreCloses 17 Dec, 6:00 pm - Roads & bridges7 days left
Construction of major bridge at Ch. 28.200 of Hunli-Anini road (NH-313), Arunachal Pradesh under SARDP
Major bridge built on EPC mode; 913 days; open tender in two covers
Lower Dibang Valley, Lower Dibang Valley district, Arunachal Pradesh
Corporate Office-New Delhi - NHIDCL
₹42.05 croreCloses 26 Nov, 3:00 pm - Roads & bridges4 days left
Sub Soil Investigation, Design, Drawing and Constr of 80 MTR Span Major PMT Shere Thapa Bridge Over Ismi-Siko Nallah Including Approach Roads at KM 0.630 on…
Delivery within 2 years; open tender in two covers (technical and financial)
All Arunachal Pradesh
HQ CE(P) Arunank(Naharlagun) - BRO
₹11.6 croreCloses 23 Nov, 4:00 pm - Roads & bridges4 days left
Construction of FSB between CP-04 and CP-05 at Sierra-9, 31st Bn ITBP, Arunachal Pradesh
Construction of FSB (forward shelter building) about 37 km from last road head; work period 365 days; two covers; open tender
Papum Pare, Papum Pare district, Arunachal Pradesh
IG, North Eastern FTR, Itbp
₹1.02 croreCloses 23 Nov, 5:30 pm - Roads & bridges4 days left
Construction of FSB between CP-07 and CP-06 at Sierra 9, Arunachal Pradesh, for 31st Battalion ITBP
Construction of FSB between CP-07 and CP-06, about 45 km from last road head, for 365 days; open tender in two covers
Papum Pare, Papum Pare district, Arunachal Pradesh
IG, North Eastern FTR, Itbp
₹1.3 croreCloses 23 Nov, 6:30 pm