  1. Vehicles & machinery2 days left

    Overhauling, servicing and refitting of MCW pumps at 370 MW Utran gas based power station, GSECL, Surat

    Overhauling, servicing and refitting of MCW pumps at the 370 MW plant, Utran; 720 days; open tender

    Surat, Surat district, Gujarat

    GSECL-Utran Gas Based Power Station

    ₹11.8 lakhCloses 16 Nov, 5:45 pm
  2. Buildings3 days left

    Replacement of doors in various quarters at GBPS Utran, GSECL, Surat

    Replacing doors of various quarters at GBPS Utran gas based power station; open tender for 150 days

    Surat, Surat district, Gujarat

    GSECL-Utran Gas Based Power Station

    ₹34.56 lakhCloses 17 Nov, 5:45 pm
  3. Buildings3 days left

    Repairing and painting of store godown and Raw Water Pump House building at GBPS utran

    Work period 8 months; EMD exemption allowed

    Surat, Surat district, Gujarat

    GSECL-Utran Gas Based Power Station

    ₹29.38 lakhCloses 17 Nov, 5:45 pm
  4. Electrical11 days left

    The work of Preventive Maintenance of various 220 KV Switchyard Bays Equipment of CCPP-2 of Utran, GBPS, Gsecl

    Work period 720 days; EMD exemption allowed

    Surat, Surat district, Gujarat

    GSECL-Utran Gas Based Power Station

    ₹20.91 lakhCloses 25 Nov, 5:45 pm
  5. Buildings11 days left

    Dismantling the existing watch towers and construction of new watch towers at CCPP-I & CCPP-II, GBPS Utran

    Work period 8 months; EMD exemption allowed

    Surat, Surat district, Gujarat

    GSECL-Utran Gas Based Power Station

    ₹40.84 lakhCloses 25 Nov, 5:45 pm
  6. Buildings11 days left

    As and when required miscellaneous Civil Works at colony of GBPS Utran

    Work period 11 months; EMD exemption allowed

    Surat, Surat district, Gujarat

    GSECL-Utran Gas Based Power Station

    ₹48.66 lakhCloses 25 Nov, 5:45 pm
  7. Electrical11 days left

    (1) Replacement of insulator or SRI (2) Work of attending the fault or broken conductor and/or snapping from tower/Gantry

    Work period 720 days; EMD exemption allowed

    Surat, Surat district, Gujarat

    GSECL-Utran Gas Based Power Station

    ₹39.05 lakhCloses 25 Nov, 5:45 pm
  8. Buildings16 days left

    General Civil works in CCPP-I & II at Utran GBPS

    Work period 11 months; EMD exemption allowed

    Surat, Surat district, Gujarat

    GSECL-Utran Gas Based Power Station