76 Live Tenders from Ministry of Road Transport and Highways, Maharashtra 2026
76 open tenders from Ministry of Road Transport and Highways in Maharashtra, closing soonest first.
Offices of Ministry of Road Transport and Highways (12)
- NH Maharashtra PWD-Aurangabad - MoRTH 15
- NH Division-Akola - MoRTH 13
- NH Division-Aurangabad - MoRTH 12
- NH Maharashtra PWD-Pen - MoRTH 10
- NH Division-Nagpur - MoRTH 5
- NH Division-Pune - MoRTH 5
- NH Division-Ratnagiri - MoRTH 4
- NH Maharashtra PWD-Nagpur - MoRTH 4
- NH Maharashtra PWD-Solapur - MoRTH 4
- RO Mumbai - MoRTH 2
- NH Maharashtra PWD-Nanded - MoRTH 1
- NH Maharastra PWD - Dhule - MoRTH 1
- Roads & bridges1 day left
Risk and cost work for upgrading Paithan to Shirur NH 752E to two lane, Chhatrapati Sambhajinagar, Maharashtra
Risk and cost work for ch 0 to 55.937 two-lane upgrade with paved shoulders on EPC basis; 335 days; open tender in two covers (technical and financial)
Chhatrapati Sambhajinagar, Chhatrapati Sambhajinagar district, Maharashtra
NH Division-Aurangabad - MoRTH
₹32.57 croreCloses 25 Nov, 5:30 pm - Roads & bridges1 day left
Short term maintenance contract on Wakan-Pali-Khopoli section of NH 548A, Pen, Maharashtra
Short term maintenance of NH 548A between several km stretches on Wakan-Pali-Khopoli section; 365 days; open tender in two covers
Pen, Raigad district, Maharashtra
NH Maharashtra PWD-Pen - MoRTH
₹5.04 croreCloses 25 Nov, 5:30 pm - Roads & bridges1 day left
Rehabilitation and upgradation of NH-66 from Km 241.300 to Km 281.300 four-lane with paved shoulder, Ratnagiri, Maharashtra
Four-lane rehabilitation and upgradation with paved shoulders under NHDP IV, hybrid annuity mode, balance work; 180 days; two covers; eligibility as per tender document
Ratnagiri, Ratnagiri district, Maharashtra
NH Division-Ratnagiri - MoRTH
₹8.26 croreCloses 25 Nov, 5:30 pm - Roads & bridges1 day left
Risk and cost work for Paithan to Shirur upgradation, NH 752E, two-lane with paved shoulders, Chhatrapati Sambhajinagar, Maharashtra
Risk and cost work for upgrading Ch 0.00 to Ch 55.937 to two lanes with paved shoulders on EPC mode for 90 days; open tender in two covers
Chhatrapati Sambhajinagar, Chhatrapati Sambhajinagar district, Maharashtra
NH Division-Aurangabad - MoRTH
₹9.48 croreCloses 25 Nov, 5:30 pm - Roads & bridges1 day left
Balance risk and cost work to upgrade Paithan–Shirur highway to 2-lane with paved shoulders, 4-lane configuration, Chhatrapati Sambhajinagar
Balance work under risk and cost for package 55.937 km; 330 days; open tender in two covers
Chhatrapati Sambhajinagar, Chhatrapati Sambhajinagar district, Maharashtra
NH Division-Aurangabad - MoRTH
₹66.55 croreCloses 25 Nov, 5:30 pm - Roads & bridges1 day left
Special repairs at Shriram Bridge and Karjat ROB, Patgaon Khopoli and Wakan-Pali-Khopoli section of NH-548A, Maharashtra
Special repairs at km 75/984, km 77/400 and km 3/656 to 5/292 with culverts, for 180 days; open tender in two covers; registration as per tender document
Pen, Raigad district, Maharashtra
NH Maharashtra PWD-Pen - MoRTH
₹8.04 croreCloses 25 Nov, 5:30 pm - Roads & bridges2 days left
Balance work of 2-lane upgrade with paved shoulders, NH-965DD Pacharal to Rajewadi section and Ambadave connector, Pen, Maharashtra
Balance work of rehabilitation and upgrading to 2-lane road with paved shoulders, ch 22700 m to 75100 m, including Ambadave connector spur; 180 days; open tender in two covers
Pen, Raigad district, Maharashtra
NH Maharashtra PWD-Pen - MoRTH
₹69.18 croreCloses 26 Nov, 5:00 pm - Roads & bridges2 days left
Balance length 4.750 km work on STMC to Bhokardan Hasnabad Jawkheda Rajur Deulgaonraja NH753M, NH753H, NH752H, Maharashtra
Balance 4.750 km of 0.000 to 66.790 km section; two covers (technical and financial); open tender; 365 days
Chhatrapati Sambhajinagar, Chhatrapati Sambhajinagar district, Maharashtra
NH Division-Aurangabad - MoRTH
₹2.13 croreCloses 26 Nov, 5:30 pm - Roads & bridges2 days left
Road safety measures on NH-166E, Km 54.260 to 74.400, Pimpali to Kumbharli Ghatmatha, Ratnagiri, Maharashtra
From km 54.260 to 74.400; delivery within 6 months; open tender in two covers (technical and financial)
Ratnagiri, Ratnagiri district, Maharashtra
NH Division-Ratnagiri - MoRTH
₹6.52 croreCloses 26 Nov, 5:30 pm - Roads & bridges2 days left
Rehabilitation and upgrading of NH461B Malegaon missing link to two lanes with paved shoulders, Malegaon, Maharashtra
Rehabilitation and upgrade of 3.00 km Akola Naka to NH 161 junction (Malegaon bypass) plus 0.460 km of NH753C; 180 days; two covers; open tender
Malegaon, Washim district, Maharashtra
NH Division-Akola - MoRTH
₹13.73 croreCloses 26 Nov, 5:30 pm - Roads & bridges3 days left
Construction of Bhandara–Ghotitok NH-247 balance length, km 168.180 to 168.920, Bhandara city, Maharashtra
Balance length of 0.740 km from Sitlamata Mandir to railway crossing, on item rate basis; 270 days; open tender in two covers
Nagpur, Nagpur district, Maharashtra
NH Maharashtra PWD-Nagpur - MoRTH
₹9.65 croreCloses 27 Nov, 1:16 pm - Roads & bridges3 days left
Strengthening of Pulgaon to Rohna section of NH-347A, Km 24.500–32.500 and 34.800–40.000, Maharashtra, on EPC, 13.20 km
Strengthening of 13.20 km of NH-347A (Pulgaon to Rohna) in two stretches under EPC mode; open tender in two covers (technical and financial); 180 days
Nagpur, Nagpur district, Maharashtra
NH Maharashtra PWD-Nagpur - MoRTH
₹15.53 croreCloses 27 Nov, 5:00 pm - Roads & bridges6 days left
Construction of road over bridge with approaches at level crossing LC T24, Parali, NH-361H, Maharashtra
Road over bridge with approaches replacing railway crossing LC T24 at km 1.160, on EPC mode; 548 days; open tender in two covers
Beed, Beed district, Maharashtra
NH Maharashtra PWD-Aurangabad - MoRTH
₹44.2 croreCloses 30 Nov, 5:30 pm - Roads & bridges6 days left
Rehabilitation and upgradation of NH-66 (erstwhile NH-17) from km 241.300 to km 281.200, 39.24 km four-lane, Ratnagiri, Maharashtra
Four-lane widening with paved shoulder over 39.24 km, Arawali Kante section, hybrid annuity basis, balance work at risk and cost; 90 days; open tender in two covers
Ratnagiri, Ratnagiri district, Maharashtra
NH Division-Ratnagiri - MoRTH
₹41.51 croreCloses 30 Nov, 5:30 pm - Roads & bridges6 days left
Rehabilitation Upgradation of Four Lane road with Paved Shoulders in Hingoli Town section of NH 461B from Narsi Phata to Junction with NH 161 at Sawarkheda…
Work period 2 years; open tender in two covers (technical and financial)
Hingoli, Hingoli district, Maharashtra
NH Division-Akola - MoRTH
₹133.53 croreCloses 30 Nov, 5:30 pm - Buildings6 days left
Special repairs to Shenale Ghat on NH-965DD, Pachral–Mandangad–Rajewadi section, Pen, Maharashtra, during 2026-27
Special repairs to Shenale Ghat at several chainages on the hill and valley sides; 365 days; open tender in two covers; registration as per tender document
Pen, Raigad district, Maharashtra
NH Maharashtra PWD-Pen - MoRTH
₹8.46 croreCloses 30 Nov, 5:30 pm - Roads & bridges6 days left
Rehabilitation, upgrading and widening of Akola to Mahan section, NH161A, Akola, Maharashtra, length 29.309 km
Km 35.265 to 64.574 with 4 lane paved shoulder construction of Barshi Takli Bypass (3.160 km); two covers (technical and financial); open tender; 548 days
Akola, Akola district, Maharashtra
NH Division-Akola - MoRTH
₹298.94 croreCloses 30 Nov, 5:30 pm - Roads & bridges8 days left
Special repairs of NH-166E from km 71.900 to 77.00 (5.10 km) Ghatmatha Guhagar-Chiplun-Karad road to Dhankal, Maharashtra
Special repairs over a 5.10 km section during FY 2026-27; 334 days; open tender in two covers (technical and financial)
Satara, Satara district, Maharashtra
NH Division-Pune - MoRTH
₹6.43 croreCloses 2 Dec, 5:30 pm - Roads & bridges8 days left
Special repairs on 8.10 km NH-166E stretch, Guhagar–Chiplun–Karad road to Dhankal, Maharashtra, for FY 2026-27
Special repairs between km 77.000 and 85.100; work period 334 days; open tender in two covers; tenderer class as per tender document
Karad, Satara district, Maharashtra
NH Division-Pune - MoRTH
₹7.98 croreCloses 2 Dec, 5:30 pm - Roads & bridges8 days left
Rehabilitation and upgrading of NH 548B, km 289.300 to 342.890, Maharashtra-Karnataka border, Solapur, Maharashtra, on EPC mode
Rehabilitation and upgrade to two lane with paved shoulders over 52.556 km; two covers (technical and financial); open tender; 720 days
Solapur, Solapur district, Maharashtra
NH Maharashtra PWD-SOLAPUR - MoRTH
₹299.97 croreCloses 2 Dec, 5:30 pm - Roads & bridges9 days left
STMC work on Helwak Karad Section of NH-166E for km 120.000 to 133.417 in the State of Maharashtra
From km 120.000 to 133.417; open tender in two covers (technical and financial)
Karad, Satara district, Maharashtra
NH Division-Pune - MoRTH
₹5.07 croreCloses 3 Dec, 5:30 pm - Roads & bridges9 days left
STMC work on Helwak Karad Section of NH-166E for Km 88.500 to 90.00 km 97.00 to 99.700 and km 102.200 to 120.00 in the State of Maharashtra
From km 88.500 to 90.00; work period 334 days; open tender in two covers (technical and financial)
Karad, Satara district, Maharashtra
NH Division-Pune - MoRTH
₹6.47 croreCloses 3 Dec, 5:30 pm - Roads & bridges10 days left
Special Repairs work in km 316.700 to 319.700 km length - 4.20 km section of NH-160 Morale Ghat Phaltan - Dahiwadi Mayani Vita Tasgaon Miraj Section in the…
From km 316.700 to 319.700; open tender in two covers (technical and financial)
Satara, Satara district, Maharashtra
NH Division-Pune - MoRTH
₹5.77 croreCloses 4 Dec, 5:35 pm - Roads & bridges13 days left
Well Protection and Road Safety Measures from km 0.000 to km 8.850 i.e. Rajur to Chikhali section of NH752 H in the State of Maharashtra during 2026-27
From km 0.000 to 8.850; work period 6 months; open tender in two covers (technical and financial)
Chhatrapati Sambhajinagar, Chhatrapati Sambhajinagar district, Maharashtra
NH Division-Aurangabad - MoRTH
₹39.35 lakhCloses 7 Dec, 5:30 pm - Roads & bridges13 days left
Short Term (STMC) Maintenance of MahanAkola section of NH 161A from Ch 35.265 to 64.574 and major bridge across Purna river
Work period 1 year; open tender in two covers (technical and financial)
Akola, Akola district, Maharashtra
NH Division-Akola - MoRTH
₹1.05 croreCloses 7 Dec, 5:30 pm - Roads & bridges13 days left
Well Protection Work on NH 753F from Design Ch. to CH. 47.500 Chhatrapati Sambhajinagar to Nillod Phata road in the state of Maharashtra. during 2026-27
Work period 6 months; open tender in two covers (technical and financial)
Chhatrapati Sambhajinagar, Chhatrapati Sambhajinagar district, Maharashtra
NH Division-Aurangabad - MoRTH
₹20.3 lakhCloses 7 Dec, 5:30 pm - Roads & bridges13 days left
Road Sefety Measures and construction of damaged Retaining and Parapet Walls in Talere - Gaganbawda Kolhapur road NH 166 G From km 0.000 to km 35.300 in…
From km 0.000 to 35.300; work period 6 months; open tender in two covers (technical and financial)
Ratnagiri, Ratnagiri district, Maharashtra
NH Division-Ratnagiri - MoRTH
₹2 croreCloses 7 Dec, 5:30 pm - Roads & bridges13 days left
Road Safety Work at Chouka Ghat on NH 753F from Design CH. to CH. 10.500 Chhatrapati Sambhajinagar to Jalgaon road in the state of Maharashtra during 2026-27
Work period 6 months; open tender in two covers (technical and financial)
Chhatrapati Sambhajinagar, Chhatrapati Sambhajinagar district, Maharashtra
NH Division-Aurangabad - MoRTH
₹39.03 lakhCloses 7 Dec, 5:30 pm - Roads & bridges13 days left
Short term maintenance of NH 347 C, Km 143.200 to 165.750 (22.550 km), Palpadiya–Raver section, NH Maharashtra PWD Dhule, Jalgaon
Short term maintenance contract for 22.550 km of NH 347 C for 365 days; open tender in two covers
Jalgaon, Jalgaon district, Maharashtra
NH Maharastra PWD - Dhule - MoRTH
EMD ₹4.74 lakhCloses 7 Dec, 5:30 pm - Roads & bridges13 days left
Special Repairs of Hingoli Town section of NH 461B from Ch. 94.750 to 101.550 except ROB at LC No. 144(B) of length 800 mtrs (Length 6.00 Km) in the state
Work period 1 year; open tender in two covers (technical and financial)
Hingoli, Hingoli district, Maharashtra
NH Division-Akola - MoRTH
₹50.42 lakhCloses 7 Dec, 5:30 pm - Roads & bridges13 days left
Short Term (STMC) Maintenance of Buldhana Khamgaon section of NH 753E from Ch 54.543 to 99.950 and Jacketing and repair to MNBs
Work period 1 year; open tender in two covers (technical and financial)
Khamgaon, Buldhana district, Maharashtra
NH Division-Akola - MoRTH
₹3.83 croreCloses 7 Dec, 5:30 pm - Repair & maintenance13 days left
Short Term Maintenance Contract on Shegaon to Maharashtra.MP Border section of NH 161G from 55.000 to 118.000 (Length 63.00 km) in the state of Maharashtra
Work period 1 year; open tender in two covers (technical and financial)
Shegaon, Buldhana district, Maharashtra
NH Division-Akola - MoRTH
₹4.06 croreCloses 7 Dec, 5:30 pm - Roads & bridges13 days left
Short Term Maintenance Contract (STMC) Forest section of Khamgaon Deulgaon Sakarsha Mehkar section
Work period 1 year; open tender in two covers (technical and financial)
Khamgaon, Buldhana district, Maharashtra
NH Division-Akola - MoRTH
₹98.87 lakhCloses 7 Dec, 5:30 pm - Roads & bridges14 days left
Balance upgradation works Seldoh to Pavnar section on NH-353I and ROB in lieu of level crossing LC 94A, Maharashtra
Balance works to upgrade Seldoh–Pavnar section to 2LPS in realigned stretches, and a ROB in lieu of LC 94A at km 85.033, on EPC mode; 540 days; open tender in two covers
Wardha, Wardha district, Maharashtra
RO Mumbai - MoRTH
₹149.57 croreCloses 8 Dec, 5:00 pm - Roads & bridges14 days left
Rehabilitation and upgrading of NH-160A, Ghoti to Trimbak section (km 53.500 to 101.100) to 4-lane, Maharashtra, EPC mode
Rehabilitation and upgrade to 4-lane (47.600 km) on EPC mode; 540 days; open tender in two covers; second call
Nashik, Nashik district, Maharashtra
RO Mumbai - MoRTH
₹794.26 croreCloses 8 Dec, 5:00 pm - Roads & bridges16 days left
Risk and cost repair of Chimur–Warora section of NH-353E, km 47.700 to 98.350, excluding 7.90 km stretch, Chimur, Maharashtra
Risk and cost repair works on the NH-353E Chimur–Warora section, excluding km 52.700 to 60.600; 180 days; open tender in two covers; registration as per tender document
Chimur, Chandrapur district, Maharashtra
NH Division-Nagpur - MoRTH
₹16.66 croreCloses 10 Dec, 5:00 pm - Roads & bridges16 days left
Balance widening and strengthening of NH 353C, km 227 to 243, Chodampalli to Guddiguddam, Gadchiroli, Maharashtra, by MoRTH Nagpur
Balance widening and strengthening of 16 km of NH 353C on EPC mode for 270 days; open tender in two covers (technical and financial); registration as per tender document
Gadchiroli, Gadchiroli district, Maharashtra
NH Division-Nagpur - MoRTH
₹50.46 croreCloses 10 Dec, 5:00 pm - Roads & bridges16 days left
Repairs of Mul Chandrapur section of NH 930, km 233.414 to 273.088, Maharashtra, under risk and cost
Repairs within stipulated maintenance period, 2 lane to 4 lane configuration, item rate mode; two covers (technical and financial); open tender; 1800 days
Mul, Chandrapur district, Maharashtra
NH Division-Nagpur - MoRTH
₹3.53 croreCloses 10 Dec, 5:00 pm - Roads & bridges16 days left
Authority's Engineer supervision of balance rehabilitation and upgradation, NH 652 Naldurge–Akkalkot, km 33.860 to 67.150, Solapur, Maharashtra
Authority's Engineer supervision services for the balance work of 2-lane upgradation with paved shoulders; work period 365 days; open tender in two covers
Solapur, Solapur district, Maharashtra
NH Maharashtra PWD-SOLAPUR - MoRTH
₹70.34 lakhCloses 10 Dec, 5:00 pm - Roads & bridges16 days left
Construction of side shoulders on Mul-Chandrapur section of NH 930, eco-sensitive zone of TATR, Maharashtra
Side shoulders on km 233.414 to 269.500, two-lane eco-sensitive zone of TATR, item rate mode; 30 days; open tender in two covers (technical and financial)
Mul, Chandrapur district, Maharashtra
NH Division-Nagpur - MoRTH
EMD ₹1.44 lakhCloses 10 Dec, 5:00 pm - Roads & bridges16 days left
Construction of ROB at km 38.215 near Pangaon on NH-361H, Maharashtra, for Ministry of Road Transport and Highways
Construction of road over bridge; 548 days; open tender in two covers
Latur, Latur district, Maharashtra
NH Maharashtra PWD-Aurangabad - MoRTH
₹30.74 croreCloses 10 Dec, 5:30 pm - Roads & bridges16 days left
Construction of ROB at km 97.542 near Wadwal Nagnath on NH-752K, Maharashtra, on EPC mode
Road over bridge built on EPC mode; 548 days; open tender in two covers
Latur, Latur district, Maharashtra
NH Maharashtra PWD-Aurangabad - MoRTH
₹29.48 croreCloses 10 Dec, 5:30 pm - Roads & bridges16 days left
Construction of road over bridge with approaches at km 1.235 near Ashtamode on NH-63, Maharashtra, on EPC mode
Road over bridge with approaches built on EPC mode; 548 days; open tender in two covers
Latur, Latur district, Maharashtra
NH Maharashtra PWD-Aurangabad - MoRTH
₹68.76 croreCloses 10 Dec, 5:30 pm - Roads & bridges16 days left
Upgrade of Tuljapur–Naldurge–Akkalkot road (NH 652) to two/four lane, Solapur, Maharashtra
Balance work from Ch 30.884 to Ch 70.800 of NH 652 from Naldurge to Akkalkot, with paved shoulders, on EPC mode; 730 days; open tender in two covers
Solapur, Solapur district, Maharashtra
NH Maharashtra PWD-SOLAPUR - MoRTH
₹99.41 croreCloses 10 Dec, 5:30 pm - Roads & bridges20 days left
Interconnection of Main Highway with Service Road Comprising DBM and BC Overlay Builtup Drain and Road Safety Works in the Tapering Portion
From km 35.300 to 35.500; work period 9 months; open tender in two covers (technical and financial); EMD exemption allowed
Ambajogai, Beed district, Maharashtra
NH Maharashtra PWD-Aurangabad - MoRTH
₹56.52 lakhCloses 14 Dec, 5:00 pm - Buildings20 days left
Special Repairs at Matola Village portion from km 232.100 to 232.380 of NH.548 in the State of Maharashtra
From km 232.100 to 232.380; work period 9 months; open tender in two covers (technical and financial)
Dharashiv, Dharashiv district, Maharashtra
NH Maharashtra PWD-Aurangabad - MoRTH
₹4.43 croreCloses 14 Dec, 5:00 pm - Roads & bridges20 days left
Road Safety measures work for Kal River Bridge at Mangaon Km 94/400 on NH-66 in the State of Maharashtra during FY 2026-27
Work period 6 months; open tender in two covers (technical and financial)
Pen, Raigad district, Maharashtra
NH Maharashtra PWD-Pen - MoRTH
₹2.02 croreCloses 14 Dec, 5:00 pm - Roads & bridges20 days left
Special Repairs at Mahila Polytechnic Latur to PVR Chowk Latur portion from Km 86.908 to Km 88.108 of NH-63 in the State of Maharashtra
From km 86.908 to 88.108; work period 9 months; open tender in two covers (technical and financial)
Latur, Latur district, Maharashtra
NH Maharashtra PWD-Aurangabad - MoRTH
₹3.87 croreCloses 14 Dec, 5:00 pm - Buildings20 days left
Provision of Safety Measures and Protection work for Exsiting Open walls Along NH.361F at Pangri Village District Beed Design km.126.400 to km.126.500 BHS
From km 126.400 to 126.500; work period 9 months; open tender in two covers (technical and financial)
Beed, Beed district, Maharashtra
NH Maharashtra PWD-Aurangabad - MoRTH
₹17.05 lakhCloses 14 Dec, 5:00 pm - Roads & bridges20 days left
Rectification of black spots on Ausa–Omerga NH 548B for Killari Police Station, Latur, Maharashtra
Rectification of identified black spots at several chainages on NH 548B; work period 270 days; open tender in two covers
Latur, Latur district, Maharashtra
NH Maharashtra PWD-Aurangabad - MoRTH
₹96.72 lakhCloses 14 Dec, 5:00 pm