- Irrigation & flood control6 days left
Installation of Bhadidar-I L.I. Project under Redhakhol Block of Sambalpur District
Work period 4 months; open tender in two covers (technical and financial); EMD exemption allowed
Redhakhol, Sambalpur district, Odisha
LI Division Sambalpur
₹32.29 lakhCloses 30 Nov, 5:00 pm - Irrigation & flood control6 days left
Installation of Mangarpali L.I. Project under Kolabira Block of Jharsuguda District
Work period 4 months; open tender in two covers (technical and financial); EMD exemption allowed
Kolabira, Jharsuguda district, Odisha
LI Division Sambalpur
₹66 lakhCloses 30 Nov, 5:00 pm - Irrigation & flood control6 days left
Installation of Hotapali-I (Deogaon) L.I. Project under Maneswar Block of Sambalpur District
Work period 4 months; open tender in two covers (technical and financial); EMD exemption allowed
Maneswar, Sambalpur district, Odisha
LI Division Sambalpur
₹61.59 lakhCloses 30 Nov, 5:00 pm - Irrigation & flood control6 days left
Installation of Kankarmunda L.I. Project under Kirmira Block of Jharsuguda District
Work period 4 months; open tender in two covers (technical and financial); EMD exemption allowed
Kirmira, Jharsuguda district, Odisha
LI Division Sambalpur
₹27.43 lakhCloses 30 Nov, 5:00 pm - Irrigation & flood control6 days left
Installation of Madalia-II L.I. Project under Barkote Block of Debagada District
Work period 4 months; open tender in two covers (technical and financial); EMD exemption allowed
Barkote, Debagada district, Odisha
LI Division Sambalpur
₹59.89 lakhCloses 30 Nov, 5:00 pm - Irrigation & flood control6 days left
Installation of Pandripali-I L.I. Project under Rengali Block of Sambalpur District
Work period 4 months; open tender in two covers (technical and financial); EMD exemption allowed
Rengali, Sambalpur district, Odisha
LI Division Sambalpur
₹32.38 lakhCloses 30 Nov, 5:00 pm - Irrigation & flood control6 days left
Installation of Thelkogudi-II L.I. Project under Reamal Block of Debagada District
Work period 4 months; open tender in two covers (technical and financial); EMD exemption allowed
Tileibani, Debagada district, Odisha
LI Division Sambalpur
₹67.16 lakhCloses 30 Nov, 5:00 pm - Irrigation & flood control6 days left
Installation of Mauliberna-III L.I. Project under Lakhanpur Block of Jharsuguda District
Work period 4 months; open tender in two covers (technical and financial); EMD exemption allowed
Lakhanpur, Jharsuguda district, Odisha
LI Division Sambalpur
₹30.7 lakhCloses 30 Nov, 5:00 pm - Irrigation & flood control6 days left
Installation of Nuapada-II L.I. Project under Redhakhol Block of Sambalpur District
Work period 4 months; open tender in two covers (technical and financial); EMD exemption allowed
Redhakhol, Sambalpur district, Odisha
LI Division Sambalpur
₹59.65 lakhCloses 30 Nov, 5:00 pm - Irrigation & flood control6 days left
Installation of Bhadidar-II L.I. Project under Redhakhol Block of Sambalpur District
Work period 4 months; open tender in two covers (technical and financial); EMD exemption allowed
Redhakhol, Sambalpur district, Odisha
LI Division Sambalpur
₹32.26 lakhCloses 30 Nov, 5:00 pm - Irrigation & flood control6 days left
Installation of Ramchandrapur-II L.I. Project under Barkote Block of Debagada District
Work period 4 months; open tender in two covers (technical and financial); EMD exemption allowed
Barkote, Debagada district, Odisha
LI Division Sambalpur
₹58.59 lakhCloses 30 Nov, 5:00 pm - Irrigation & flood control6 days left
Installation of Bausenpali-IV L.I. Project under Lakhanpur Block of Jharsuguda District
Work period 4 months; open tender in two covers (technical and financial); EMD exemption allowed
Lakhanpur, Jharsuguda district, Odisha
LI Division Sambalpur
₹64.34 lakhCloses 30 Nov, 5:00 pm - Irrigation & flood control6 days left
Installation of Lakhabahal L.I. Project under Reamal Block of Debagada District
Work period 4 months; open tender in two covers (technical and financial); EMD exemption allowed
Reamal, Debagada district, Odisha
LI Division Sambalpur
₹61.14 lakhCloses 30 Nov, 5:00 pm - Irrigation & flood control6 days left
Installation of Sardha-III L.I. Project under Lakhanpur Block of Jharsuguda District
Work period 4 months; open tender in two covers (technical and financial); EMD exemption allowed
Lakhanpur, Jharsuguda district, Odisha
LI Division Sambalpur
₹65.11 lakhCloses 30 Nov, 5:00 pm - Irrigation & flood control6 days left
Installation of Jamdihi L.I. Project under Laikera Block of Jharsuguda District
Work period 4 months; open tender in two covers (technical and financial); EMD exemption allowed
Laikera, Jharsuguda district, Odisha
LI Division Sambalpur
₹29.98 lakhCloses 30 Nov, 5:00 pm - Irrigation & flood control6 days left
Installation of M Kantapali-III L.I. Project under Lakhanpur Block of Jharsuguda District
Work period 4 months; open tender in two covers (technical and financial); EMD exemption allowed
Lakhanpur, Jharsuguda district, Odisha
LI Division Sambalpur
₹57.55 lakhCloses 30 Nov, 5:00 pm - Irrigation & flood control6 days left
Installation of Ainlapali L.I. Project under Lakhanpur Block of Jharsuguda District
Work period 4 months; open tender in two covers (technical and financial); EMD exemption allowed
Lakhanpur, Jharsuguda district, Odisha
LI Division Sambalpur
₹63.31 lakhCloses 30 Nov, 5:00 pm - Irrigation & flood control6 days left
Installation of Sendha-V L.I. Project under Reamal Block of Debagada District
Work period 4 months; open tender in two covers (technical and financial); EMD exemption allowed
Reamal, Debagada district, Odisha
LI Division Sambalpur
₹60.33 lakhCloses 30 Nov, 5:00 pm - Irrigation & flood control6 days left
Installation of Butupali-II L.I. Project under Kolabira Block of Jharsuguda District
Work period 4 months; open tender in two covers (technical and financial); EMD exemption allowed
Kolabira, Jharsuguda district, Odisha
LI Division Sambalpur
₹66.31 lakhCloses 30 Nov, 5:00 pm - Irrigation & flood control6 days left
Installation of Dalak L.I. Project under Reamal Block of Debagada District
Work period 4 months; open tender in two covers (technical and financial); EMD exemption allowed
Reamal, Debagada district, Odisha
LI Division Sambalpur
₹59.26 lakhCloses 30 Nov, 5:00 pm - Irrigation & flood control6 days left
Installation of Ghansara-IV L.I. Project under Bamara Block of Sambalpur District
Work period 4 months; open tender in two covers (technical and financial); EMD exemption allowed
Sambalpur, Sambalpur district, Odisha
LI Division Sambalpur
₹34.48 lakhCloses 30 Nov, 5:00 pm - Irrigation & flood control6 days left
Installation of Tudabahal-III L.I. Project under Redhakhol Block of Sambalpur District
Work period 4 months; open tender in two covers (technical and financial); EMD exemption allowed
Redhakhol, Sambalpur district, Odisha
LI Division Sambalpur
₹32.32 lakhCloses 30 Nov, 5:00 pm - Irrigation & flood control6 days left
Installation of Surupa L.I. Project under Tileibani Block of Debagada District
Work period 4 months; open tender in two covers (technical and financial); EMD exemption allowed
Tileibani, Debagada district, Odisha
LI Division Sambalpur
₹67.59 lakhCloses 30 Nov, 5:00 pm - Irrigation & flood control6 days left
Installation of Kuntara L.I. Project under Kuchinda Block of Sambalpur District
Work period 4 months; open tender in two covers (technical and financial); EMD exemption allowed
Kuchinda, Sambalpur district, Odisha
LI Division Sambalpur
₹41.64 lakhCloses 30 Nov, 5:00 pm - Irrigation & flood control6 days left
Installation of Jamadarpali-IV L.I. Project under Dhankouda Block of Sambalpur District
Work period 4 months; open tender in two covers (technical and financial); EMD exemption allowed
Sambalpur, Sambalpur district, Odisha
LI Division Sambalpur
₹60.85 lakhCloses 30 Nov, 5:00 pm - Irrigation & flood control6 days left
Installation of Gogua L.I. Project under Tileibani Block of Debagada District
Work period 4 months; open tender in two covers (technical and financial); EMD exemption allowed
Tileibani, Debagada district, Odisha
LI Division Sambalpur
₹68.28 lakhCloses 30 Nov, 5:00 pm - Irrigation & flood control6 days left
Installation of Nuapali-I L.I. Project under Kolabira Block of Jharsuguda District
Work period 4 months; open tender in two covers (technical and financial); EMD exemption allowed
Kolabira, Jharsuguda district, Odisha
LI Division Sambalpur
₹27.72 lakhCloses 30 Nov, 5:00 pm - Irrigation & flood control6 days left
Installation of Lalmuni L.I. Project under Jujumura Block of Sambalpur District
Work period 4 months; open tender in two covers (technical and financial); EMD exemption allowed
Sambalpur, Sambalpur district, Odisha
LI Division Sambalpur
₹30.31 lakhCloses 30 Nov, 5:00 pm - Irrigation & flood control6 days left
Installation of Baliturei-III (Loketkudar) L.I. Project under Bamara Block of Sambalpur District
Work period 4 months; open tender in two covers (technical and financial); EMD exemption allowed
Sambalpur, Sambalpur district, Odisha
LI Division Sambalpur
₹41.34 lakhCloses 30 Nov, 5:00 pm - Irrigation & flood control6 days left
Installation of Jamumunda L.I. Project under Reamal Block of Debagada District
Work period 4 months; open tender in two covers (technical and financial); EMD exemption allowed
Reamal, Debagada district, Odisha
LI Division Sambalpur
₹60.64 lakhCloses 30 Nov, 5:00 pm - Irrigation & flood control6 days left
Installation of Pohalmara L.I. Project under Tileibani Block of Debagada District
Work period 4 months; open tender in two covers (technical and financial); EMD exemption allowed
Tileibani, Debagada district, Odisha
LI Division Sambalpur
₹68.37 lakhCloses 30 Nov, 5:00 pm - Irrigation & flood control6 days left
Installation of Beluamba L.I. Project under Reamal Block of Debagada District
Work period 4 months; open tender in two covers (technical and financial); EMD exemption allowed
Tileibani, Debagada district, Odisha
LI Division Sambalpur
₹68.28 lakhCloses 30 Nov, 5:00 pm - Irrigation & flood control6 days left
Installation of Dudukabahal-II L.I. Project under Laikera Block of Jharsuguda District
Work period 4 months; open tender in two covers (technical and financial); EMD exemption allowed
Laikera, Jharsuguda district, Odisha
LI Division Sambalpur
₹58.67 lakhCloses 30 Nov, 5:00 pm - Irrigation & flood control6 days left
Installation of Jammal-II L.I. Project under Laikera Block of Jharsuguda District
Work period 4 months; open tender in two covers (technical and financial); EMD exemption allowed
Laikera, Jharsuguda district, Odisha
LI Division Sambalpur
₹61.16 lakhCloses 30 Nov, 5:00 pm - Irrigation & flood control6 days left
Installation of Musakata-IV L.I. Project under Redhakhol Block of Sambalpur District
Work period 4 months; open tender in two covers (technical and financial); EMD exemption allowed
Redhakhol, Sambalpur district, Odisha
LI Division Sambalpur
₹32.39 lakhCloses 30 Nov, 5:00 pm - Irrigation & flood control6 days left
Installation of Jharaberni-V L.I. Project under Reamal Block of Debagada District
Work period 4 months; open tender in two covers (technical and financial); EMD exemption allowed
Reamal, Debagada district, Odisha
LI Division Sambalpur
₹60.67 lakhCloses 30 Nov, 5:00 pm - Irrigation & flood control6 days left
Installation of Khajurikhamar-II L.I. Project under Barkote Block of Debagada District
Work period 4 months; open tender in two covers (technical and financial); EMD exemption allowed
Barkote, Debagada district, Odisha
LI Division Sambalpur
₹60.47 lakhCloses 30 Nov, 5:00 pm - Irrigation & flood control6 days left
Installation of Jarachat-V L.I. Project under Reamal Block of Debagada District
Work period 4 months; open tender in two covers (technical and financial); EMD exemption allowed
Reamal, Debagada district, Odisha
LI Division Sambalpur
₹59.24 lakhCloses 30 Nov, 5:00 pm - Irrigation & flood control6 days left
Installation of Kandheikela-II L.I. Project under Lakhanpur Block of Jharsuguda District
Work period 4 months; open tender in two covers (technical and financial); EMD exemption allowed
Lakhanpur, Jharsuguda district, Odisha
LI Division Sambalpur
₹32.17 lakhCloses 30 Nov, 5:00 pm - Irrigation & flood control6 days left
Installation of Raital Kataipada L.I. Project under Tileibani Block of Debagada District
Work period 4 months; open tender in two covers (technical and financial); EMD exemption allowed
Tileibani, Debagada district, Odisha
LI Division Sambalpur
₹66.6 lakhCloses 30 Nov, 5:00 pm - Irrigation & flood control6 days left
Installation of Kadopada-III L.I. Project under Reamal Block of Debagada District
Work period 4 months; open tender in two covers (technical and financial); EMD exemption allowed
Reamal, Debagada district, Odisha
LI Division Sambalpur
₹60.5 lakhCloses 30 Nov, 5:00 pm - Irrigation & flood control6 days left
Installation of Saruali-IV L.I. Project under Barkote Block of Debagada District
Work period 4 months; open tender in two covers (technical and financial); EMD exemption allowed
Barkote, Debagada district, Odisha
LI Division Sambalpur
₹59.34 lakhCloses 30 Nov, 5:00 pm - Irrigation & flood control6 days left
Installation of Tainsar-IV L.I. Project under Kuchinda Block of Sambalpur District
Work period 4 months; open tender in two covers (technical and financial); EMD exemption allowed
Kuchinda, Sambalpur district, Odisha
LI Division Sambalpur
₹34.56 lakhCloses 30 Nov, 5:00 pm - Irrigation & flood control6 days left
Installation of Jhankarpada (Kristianpada)-II L.I. Project under Redhakhol Block of Sambalpur District
Work period 4 months; open tender in two covers (technical and financial); EMD exemption allowed
Redhakhol, Sambalpur district, Odisha
LI Division Sambalpur
₹58.64 lakhCloses 30 Nov, 5:00 pm - Irrigation & flood control6 days left
Installation of Tipirisingha (Silotka) L.I. Project under Tileibani Block of Debagada District
Work period 4 months; open tender in two covers (technical and financial); EMD exemption allowed
Tileibani, Debagada district, Odisha
LI Division Sambalpur
₹67.52 lakhCloses 30 Nov, 5:00 pm - Irrigation & flood control6 days left
Installation of Thakurmal-VII L.I. Project under Jujumura Block of Sambalpur District
Work period 4 months; open tender in two covers (technical and financial); EMD exemption allowed
Sambalpur, Sambalpur district, Odisha
LI Division Sambalpur
₹30.15 lakhCloses 30 Nov, 5:00 pm - Irrigation & flood control6 days left
Installation of Badmal-III L.I. Project under Maneswar Block of Sambalpur District
Work period 4 months; open tender in two covers (technical and financial); EMD exemption allowed
Maneswar, Sambalpur district, Odisha
LI Division Sambalpur
₹61.36 lakhCloses 30 Nov, 5:00 pm - Irrigation & flood control6 days left
Installation of Batemura-III L.I. Project under Maneswar Block of Sambalpur District
Work period 4 months; open tender in two covers (technical and financial); EMD exemption allowed
Maneswar, Sambalpur district, Odisha
LI Division Sambalpur
₹61.83 lakhCloses 30 Nov, 5:00 pm - Irrigation & flood control6 days left
Installation of Jhankarpada (Kristianpada)-I L.I. Project under Redhakhol Block of Sambalpur District
Work period 4 months; open tender in two covers (technical and financial); EMD exemption allowed
Redhakhol, Sambalpur district, Odisha
LI Division Sambalpur
₹58.64 lakhCloses 30 Nov, 5:00 pm - Irrigation & flood control6 days left
Installation of Tiligi L.I. Project under Lakhanpur Block of Jharsuguda District
Work period 4 months; open tender in two covers (technical and financial); EMD exemption allowed
Lakhanpur, Jharsuguda district, Odisha
LI Division Sambalpur
₹64.52 lakhCloses 30 Nov, 5:00 pm
LI Division Sambalpur tenders: quick answers
- How many tenders does LI Division Sambalpur have open?
- 114 open tenders. 114 of them close within the next 7 days.
- What are these tenders worth?
- 114 of the open tenders state a value. The middle value is ₹58.62 lakh; most lie between ₹29.97 lakh and ₹66.31 lakh.
- Which portals publish them, and how do you bid?
- They come from Odisha e-Procurement (GePNIC). Bids are made online on the portal that published the tender, after registering there as a bidder; most e-procurement portals also need a class 3 Digital Signature Certificate (DSC), and GeM needs a GeM seller account. Each tender page here gives the dates, EMD, documents and portal.
Recently closed tenders from LI Division Sambalpur
Closed in the last 6 months, latest first.
- Reinforcement of Gouribuda-I, Kumardihi-I and II lift irrigation projects, Laikera block, Jharsuguda district, Odisha2026_OLIC_144824_7 · ₹8.01 lakh · Closed 13 Nov 2026
- Reinforcement of Kudapada-I and II lift irrigation projects in Kuchinda block, Sambalpur, Odisha2026_OLIC_144824_77 · ₹16.59 lakh · Closed 13 Nov 2026
- Reinforcement of Netipada lift irrigation project, Bamra block, Sambalpur district, Odisha by Orissa Lift Irrigation…2026_OLIC_144824_55 · ₹6.12 lakh · Closed 13 Nov 2026
- Reinforcement of Gudhiali-I and II lift irrigation project, Lakhanpur block, Jharsuguda district, Odisha, by Orissa…2026_OLIC_144824_17 · ₹11.09 lakh · Closed 13 Nov 2026
- Revival of Kaliapal-I lift irrigation project, Barkote block, Deogarh district, Odisha2026_OLIC_144824_101 · ₹17.35 lakh · Closed 13 Nov 2026
- Reinforcement of Tengnamal-II, Bausenpali-III and Samarbaga-III lift irrigation projects, Lakhanpur block, Jharsuguda,…2026_OLIC_144824_12 · ₹12.62 lakh · Closed 13 Nov 2026
- Revival of Saruali-III lift irrigation project, Barkote block, Deogarh district, Odisha2026_OLIC_144824_106 · ₹15.94 lakh · Closed 13 Nov 2026
- Reinforcement of Lasa-II lift irrigation project, Kuchinda block, Sambalpur district, Odisha2026_OLIC_144824_74 · ₹8.02 lakh · Closed 13 Nov 2026
- Reinforcement of Tanmura-III lift irrigation project, Kuchinda block, Sambalpur district, Odisha2026_OLIC_144824_80 · ₹8.47 lakh · Closed 13 Nov 2026
- Reinforcement of Guljipali-I and II lift irrigation projects under Jamankira block, Sambalpur district, Odisha2026_OLIC_144824_65 · ₹12.79 lakh · Closed 13 Nov 2026