Supply and stacking of stone chips, stone dust and sand for modular bridge over Paro Nallah on Kimin-Potin road, BRO, Arunachal Pradesh
Read the full title from the noticeHide the full title
Supply and Stacking of Stone Chips, Stone Metal, Stone Dust and Coarse Sand for Substructure, GSB, WMM, DBM and BC Works for Construction of Modular Bridge Over Paro Nallah at KM 38.750 on Kimin-Potin Road under 119 RCC/756 Brtf, Project Arunank.
HQ CE(P) Arunank(Naharlagun) - BRO, Dte General Border Roads Organisation
All Arunachal Pradesh
- Estimated contract value
- ₹22.93 lakh
- EMD
- ₹45,866
- Bid security, refunded after the bid · Exemption allowed (per portal)
- Tender fee
- ₹0
- No tender fee, as listed on the portal
- Bids close
- 16 Nov 2026, 6:00 pm IST
Summary
Stone chips, stone metal, stone dust and coarse sand supplied and stacked for substructure, GSB, WMM, DBM and BC works; 180 days; open tender in two covers
Work duration 180 days · bids valid 180 days · Two covers (technical and financial)
AI summary. Check the official portal before you bid.
Scope of work
- Roads & bridges
- Highways & bituminous roads
- Bridges & culverts
- Work duration
- 180 days
- From the official tender record
Eligibility
- Registration class
- As per Tender Document
- As listed on the portal; confirm it against the tender document.
- Pre-qualification
- As per Tender Documents
Submission checklist
- Submission
- Two covers: a technical bid and a separate financial bid
- From the official tender record
- Bid validity
- 180 days
Commercial terms
Contract value, EMD, tender fee and performance security are separate amounts; they are never added up.
Evaluation
Tender documents
Every file the department published. Unlock this tender to download them.
- PDFLocked
Tender notice (NIT)
Tendernotice_1.pdf · 288 KB
- PDFLocked
Tender document
Tenderdocs.pdf · 1.9 MB
- XLSLocked
Pricing schedule (BOQ: bill of quantities)
BOQ_891326.xls · 338 KB
Key dates
- Published19 Oct 2026, 4:30 pm IST
- Pre-bid meeting30 Oct 2026, 11:00 am IST
- Bids accepted from1 Nov 2026, 12:00 pm IST
- Bids close16 Nov 2026, 6:00 pm IST
- Bid opening17 Nov 2026, 6:00 pm IST
Location and buyer
All Arunachal Pradesh
The work covers all of Bihar
Who issued it
- Dte General Border Roads Organisation
- HQ CE(P) Arunank(Naharlagun) - BRO
Changes, clarifications and contacts
- Clarification window
- 22 Oct 2026, 4:30 pm IST – 28 Oct 2026, 6:00 pm IST
- Bids opened at
- HQ756 BRTF, Pine Grove,Old Ziro District, A.P
Reference
- Tender ID
- 2026_BRO_794520_1
- Reference
- CDR 756BRTF/01/2026-27
- Tender type
- Open Tender
- Source
- Defence eProcurement
- Last updated
- 16 Nov 2026, 6:05 pm IST
Always verify details on the official portal before bidding.
Tenders most like this one
Open Roads & bridges tenders closest to it in work and place
- Roads & bridges3 days left
Construction of major bridge at Ch. 28.200 of Hunli-Anini road (NH-313), Arunachal Pradesh under SARDP
Major bridge built on EPC mode; 913 days; open tender in two covers
Lower Dibang Valley, Lower Dibang Valley district, Arunachal Pradesh
Corporate Office-New Delhi - NHIDCL
₹42.05 croreCloses 26 Nov, 3:00 pm - Roads & bridges17 days left
Construction of 01 No FSB above Dau River near kizab nallah and 01 No Log bridge at Kizbam Nallah of 25th Bn I.T.B.P Arunachal Pradesh
01 nos. of FSB above Dau River; work period 1 year; open tender in two covers (technical and financial)
Anjaw, Anjaw district, Arunachal Pradesh
IG, Eastern FTR, Itbp
₹1.01 croreCloses 10 Dec, 4:00 pm - Roads & bridges17 days left
Providing, Laying, Spreading and Compaction of Flexible Pavement Comprising GSB, WMM
Work period 540 days; open tender in two covers (technical and financial)
All Arunachal Pradesh
HQ CE(P) Brahmank(Pasighat) - BRO
₹18.31 croreCloses 10 Dec, 4:00 pm - Roads & bridges9 days left
Construction of log bridge between Bakar and Kawachvi on Kilo1 axis of 54 Bn ITBP, about 87 km from last road head Milli, Arunachal Pradesh
Construction of a log bridge between Bakar and Kawachvi, about 87 km from last road head Milli; 360 days; open tender in two covers
Kurung Kumey, Kurung Kumey district, Arunachal Pradesh
IG, North Eastern FTR, Itbp
₹36.32 lakhCloses 2 Dec, 5:00 pm - Roads & bridges8 days left
Construction of seven log bridges at various locations on Kilo 1 axis, 54th Bn ITBP, Arunachal Pradesh
Seven log bridges at various locations on Kilo 1 axis; work period 360 days; two covers; open tender
Kurung Kumey, Kurung Kumey district, Arunachal Pradesh
IG, North Eastern FTR, Itbp
₹93.76 lakhCloses 1 Dec, 4:00 pm - Roads & bridges10 days left
Construction of two log bridges at various locations on Kilo 2 axis, 54th Bn ITBP, Arunachal Pradesh
Two log bridges at various locations on Kilo 2 axis; work period 360 days; two covers; open tender
Kurung Kumey, Kurung Kumey district, Arunachal Pradesh
IG, North Eastern FTR, Itbp
₹50.41 lakhCloses 3 Dec, 6:00 pm