Patches and potholes repair of different location in Ward No. 191 Mayur Vihar Phase-I after monsoon by pdg. CC under jurisdictions
Read the full title from the noticeHide the full title
Patches and potholes repair of different location in Ward No. 191 Mayur Vihar Phase-I after monsoon by pdg. CC under jurisdictions of EE-M-III-Shahdara (South) Zone.
Civil Engineering - MCD, Municipal Corporation of Delhi
East, East district, Delhi
- Estimated contract value
- ₹2.74 lakh
- EMD
- ₹5,800
- Bid security, refunded after the bid · No exemption (per portal)
- Tender fee
- ₹590
- Paid with the bid, not refunded
- Bids close
- 19 Nov 2026, 1:00 pm IST
- 6 days left
Summary
Work period 3 months; open tender in a single cover
Work duration 90 days · bids valid 150 days · 1 covers
AI summary — verify on the official portal
Scope of work
- Roads & bridges
- Road repair & patchwork
- Work duration
- 90 days
- From the official tender record
Eligibility
- Registration class
- Not Applicable
- As listed on the portal; confirm it against the tender document.
- Pre-qualification
- Please refer Tender documents.
Submission checklist
- Submission
- 1 covers
- From the official tender record
- Bid validity
- 150 days
Commercial terms
Contract value, EMD, tender fee and performance security are separate amounts; they are never added up.
Evaluation
Tender documents
Every file the department published. Unlock this tender to download them.
- PDFLocked
Tender notice (NIT)
Tendernotice_1.pdf · 10.6 MB
- PDFLocked
Tender notice (NIT)
Tendernotice_2.pdf · 207 KB
- PDFLocked
Schedule
3.pdf · 94 KB
- XLSLocked
Pricing schedule (BOQ: bill of quantities)
BOQ_346710.xls · 286 KB
Key dates
- Published12 Nov 2026, 6:00 pm IST
- Bids accepted from12 Nov 2026, 6:00 pm IST
- Bids close19 Nov 2026, 1:00 pm IST
- Bid opening19 Nov 2026, 2:00 pm IST
Location and buyer
East
East district, Delhi
Marked at pincode level
Who issued it
- Municipal Corporation of Delhi
- Engineering - MCD
- Civil Engineering - MCD
Changes, clarifications and contacts
- Bids opened at
- O/O EE-M-III-SSZ
Reference
- Tender ID
- 2026_MCD_297587_3
- Reference
- MCD/EE-(M)-III/Sh.(S)/26-27/26
- Tender type
- Open Tender
- Source
- eTenders for CPSEs
- Last checked on the portal
- 12 Nov 2026, 6:34 pm IST
Always verify details on the official portal before bidding.
Tenders most like this one
Open Roads & bridges tenders closest to it in work and place
- Roads & bridges4 days left
Repair of potholes and patch work on Road / lanes by pdg. cement concrete in different locations Ward No. 53, Rohini-E, M-I/NWZ
Work period 3 months; open tender in two covers (technical and financial)
Outer North, Outer North district, Delhi
Civil Engineering - MCD
₹2.85 lakhCloses 17 Nov, 3:00 pm - Roads & bridges4 days left
Repair of pothole and Patch work on Road / lanes by pdg. Cement concrete in different locations Ward No. 51, Rohini-C, M-I/NWZ
Work period 3 months; open tender in two covers (technical and financial)
Outer North, Outer North district, Delhi
Civil Engineering - MCD
₹2.85 lakhCloses 17 Nov, 3:00 pm - Roads & bridges4 days left
Patch and potholes repairing for day to day maintenance of roads / lanes in different locations in Mangolpuri in Ward No. 50 / M-I (RZ) NWZ
Work period 3 months; open tender in two covers (technical and financial)
North West, North West district, Delhi
Civil Engineering - MCD
₹2.85 lakhCloses 17 Nov, 3:00 pm - Roads & bridges4 days left
Improvement and development by repair / patch work of potholes post monsoon in the area of Ward No. 54, M-I, Rohini-D, North West Zone (RZ)
Work period 3 months; open tender in two covers (technical and financial)
Outer North, Outer North district, Delhi
Civil Engineering - MCD
₹2.86 lakhCloses 17 Nov, 3:00 pm - Roads & bridges4 days left
Repair of Roads, potholes or other repair work post monsoon in area of Ward No. 25 (Budh Vihar), M-I/NWZ
Work period 3 months; open tender in two covers (technical and financial)
Outer North, Outer North district, Delhi
Civil Engineering - MCD
₹2.85 lakhCloses 17 Nov, 3:00 pm - Roads & bridges4 days left
Repair of Roads, potholes or other repair work post monsoon in area of Ward No. 24 (Vijay Vihar), M-I/NWZ
Work period 3 months; open tender in two covers (technical and financial)
Outer North, Outer North district, Delhi
Civil Engineering - MCD
₹2.85 lakhCloses 17 Nov, 3:00 pm
More open tenders near this one
Within 50 km, nearest first.
- Same townRoads & bridges3 days left
Construction of foot over bridge with lift under Shahdara Road Division M-211 at Welcome Cut, G.T. Road, Delhi
Civil and electrical works for a foot over bridge with lift facility; 180 days; open tender in two covers
East, East district, Delhi
EE/M211
₹3.98 croreCloses 16 Nov, 3:00 pm - Same townSpares & parts4 days left
Compressor-Screwoil Flooded
Delivery within 5 months; limited tender in two covers (technical and financial)
East, East district, Delhi
Head Office-Delhi, EIL, MoPNG
Value not publishedCloses 17 Nov, 12:00 pm - Same townParks & beautification4 days left
Horticulture works at residential buildings under Horticulture Sub Division East-II, PWD Delhi, 2026-27
Providing and displaying specimen winter seasonal flowering earthen tray and bulbous plants in earthen and plastic pots; 90 days; open tender in two covers
East, East district, Delhi
EE/M214
₹18.53 lakhCloses 17 Nov, 3:00 pm - Same townParks & beautification4 days left
Horticulture maintenance at D.A. Flats Timarpur under Horticulture Sub Division East-III, PWD Delhi, 2026-27
Complete maintenance of horticulture features; 365 days; open tender in two covers
East, East district, Delhi
EE/M214
₹20.99 lakhCloses 17 Nov, 3:00 pm - Same townRoads & bridges4 days left
Providing, running and maintaining 4 water sprinkler anti-smog guns on hire for roads, PWD East Road Division, Delhi
Four additional water sprinkler anti-smog guns on hire at various road locations under East Road-I, II, III and IV sub-divisions; 60 days; two covers (technical and financial); open tender
East, East district, Delhi
EE/M212
₹48.77 lakhCloses 17 Nov, 3:00 pm - Same townRoads & bridges4 days left
Improvement of central verge with RCC crash barrier on Ghazipur Road, PWD East Road-III, Delhi
Central verge improvement with RCC crash barrier, with civil and electrical works; 120-day work period; open tender in two covers
East, East district, Delhi
EE/M212
₹5.1 croreCloses 17 Nov, 3:00 pm