Enquiry for work of availing Service Engineer on supervisory basis for providing assistance in servicing of Hydraulic Coupling of make VOITH
Read the full title from the noticeHide the full title
Enquiry for work of availing Service Engineer on supervisory basis for providing assistance in servicing of HYDRAULIC COUPLING of make VOITH of type R16K.1 for BFP Set of Unit No. 11, PH-IV, STPS, MPPGCL, Sarni during COH.
Chief Engineer(Gen.)- Satpura Thermal Power Station Sarni MPPGCL, Madhya Pradesh Power Generating Company Limited
Sarni, Betul district, Madhya Pradesh
- Estimated contract value
- ₹1.85 lakh
- EMD
- Not published
- No exemption (per portal)
- Tender fee
- ₹0
- No tender fee, as listed on the portal
- Bids close
- 7 Dec 2026, 4:00 pm IST
- 18 days left
Summary
Work period 9 days; open tender in two covers (technical and financial)
Work duration 9 days · bids valid 180 days · Two covers (technical and financial)
AI summary. Check the official portal before you bid.
Scope of work
- Spares & parts
- Repair & maintenance
- Work duration
- 9 days
- From the official tender record
Eligibility
- Pre-qualification
- as per enquiry PQR
Submission checklist
- Submission
- Two covers: a technical bid and a separate financial bid
- From the official tender record
- Bid validity
- 180 days
Commercial terms
Contract value, EMD, tender fee and performance security are separate amounts; they are never added up.
Evaluation
Tender documents
Every file the department published. Unlock this tender to download them.
- PDFLocked
Tender notice (NIT)
Tendernotice_1.pdf · 464 KB
- PDFLocked
WE-453Servicing of hydraulic coupling VOITH make.pdf
enquiry · 464 KB
Key dates
- Published18 Nov 2026, 9:00 am IST
- Bids accepted from18 Nov 2026, 9:00 am IST
- Bids close7 Dec 2026, 4:00 pm IST
- Bid opening9 Dec 2026, 5:30 pm IST
Location and buyer
Sarni
Betul district, Madhya Pradesh
Marked at town level
Who issued it
- Madhya Pradesh Power Generating Company Limited
- Chief Engineer(Gen.)- Satpura Thermal Power Station Sarni MPPGCL
Changes, clarifications and contacts
- Bids opened at
- sarni
Reference
- Tender ID
- 2026_MPPGC_857413_1
- Reference
- WE-453
- Tender type
- Open Tender
- Source
- ePublish
- Last updated
- 18 Nov 2026, 9:05 am IST
Always verify details on the official portal before bidding.
Tenders most like this one
Open Spares & parts tenders closest to it in work and place
- Spares & parts6 days left
Supply of mill end and motor end couplings for Coal Mill XRP-903, STPS Sarni, MPPGCL, Madhya Pradesh
Mill end and motor end couplings for Coal Mill XRP-903 of Units 10 and 11; 90 days; open tender in two covers
Sarni, Betul district, Madhya Pradesh
Chief Engineer(Gen.)-Satpura Thermal Power Station-Sarni - MPPGCL
₹6.52 lakhCloses 25 Nov, 3:00 pm - Spares & parts4 days left
Supply of Cenlub make lube oil system spares for PA and FD fans of Units 10 and 11, Satpura Thermal Power Station, Sarni
Spares for Cenlub make lube oil system of PA and FD fans of Units 10 and 11; delivery period 90 days; single-cover bid
Sarni, Betul district, Madhya Pradesh
Chief Engineer(Gen.)-Satpura Thermal Power Station-Sarni - MPPGCL
₹4.7 lakhCloses 23 Nov, 3:00 pm - Spares & parts13 days left
Supply of spare parts for side arm chargers, coal sampling units, ventilation and conveyor system of CHP-IV, STPS Sarni, MPPGCL
Spare parts for side arm chargers, coal sampling units, wagon tipplers and conveyor system; 60 days; open tender in two covers
Sarni, Betul district, Madhya Pradesh
Chief Engineer(Gen.)-Satpura Thermal Power Station-Sarni - MPPGCL
₹90.45 lakhCloses 2 Dec, 3:00 pm - Spares & parts4 days left
Supply of various critical spare parts for rotary breakers of CHP-IV, STPS, MPPGCL, Sarni, Madhya Pradesh
Various critical spare parts for rotary breakers of CHP-IV for 60 days; open tender in two covers
Sarni, Betul district, Madhya Pradesh
Chief Engineer(Gen.)-Satpura Thermal Power Station-Sarni - MPPGCL
₹2.46 croreCloses 23 Nov, 3:00 pm - Spares & parts19 days left
Procurement of Spares of dust Suppression Actuator for CHP-4(Elec.), STPS, Sarni
Delivery within 45 days; open tender in two covers (technical and financial); EMD exemption allowed
Sarni, Betul district, Madhya Pradesh
Chief Engineer(Gen.)-Satpura Thermal Power Station-Sarni - MPPGCL
₹60.95 lakhCloses 8 Dec, 3:00 pm - Spares & parts4 days left
Supply of various spares for mill reject, ash handling, CW pump house and chlorination plant, PH-4 2X250 MW STPS Sarni
Various spares for mill reject, ash handling, circulating water pump house and chlorination plant; 45 days; open tender in two covers
Sarni, Betul district, Madhya Pradesh
Chief Engineer(Gen.)-Satpura Thermal Power Station-Sarni - MPPGCL
₹12.49 lakhCloses 23 Nov, 3:00 pm
More open tenders near this one
Within 50 km, nearest first.
- Same townOther goods & services26 hours left
EPC package for ash handling system and raw water intake outside plant boundary at MPPGCL Satpura TPS Unit-12, Sarni
Delivery within 1080 days; open tender in two covers (technical and financial)
Sarni, Betul district, Madhya Pradesh
Central Procurement Cell
EMD ₹50 lakhCloses 20 Nov, 11:00 am - Same townBuildings30 hours left
Annual general civil and carpentry maintenance of residential quarters in sectors 3 to 7, Satpura Thermal Power Station, Sarni
Annual general civil and carpentry maintenance work of residential quarters under sectors 3 to 7; 365 days; open tender in two covers
Sarni, Betul district, Madhya Pradesh
Chief Engineer(Gen.)-Satpura Thermal Power Station-Sarni - MPPGCL
₹50.45 lakhCloses 20 Nov, 3:00 pm - Same townBuildings30 hours left
Annual general civil and carpentry maintenance of AB type colony and public buildings, sector 2, STPS Sarni
Annual general civil and carpentry maintenance of AB type colony and public buildings under sector 2 for 2026-27; 365 days; open tender in two covers
Sarni, Betul district, Madhya Pradesh
Chief Engineer(Gen.)-Satpura Thermal Power Station-Sarni - MPPGCL
₹16.09 lakhCloses 20 Nov, 3:00 pm - Same townBuildings30 hours left
Annual general civil repair and maintenance of PH-II, III and IV with ancillary buildings and offices, STPS Sarni, 2026-27
Annual general civil repair and maintenance of PH-II, III and IV, ancillary buildings, store shed and all office buildings; 365 days; open tender in two covers
Sarni, Betul district, Madhya Pradesh
Chief Engineer(Gen.)-Satpura Thermal Power Station-Sarni - MPPGCL
₹27.78 lakhCloses 20 Nov, 3:00 pm - Same townElectrical30 hours left
Periodic testing of generators of Units 10 and 11 at Satpura Thermal Power Station, Sarni, Madhya Pradesh
Periodic testing of generators of Unit No. 10 and 11 per IEGC-2023 and MPEGC-2024; work period 10 days; limited tender in two covers (technical and financial)
Sarni, Betul district, Madhya Pradesh
Chief Engineer(Gen.)-Satpura Thermal Power Station-Sarni - MPPGCL
₹19.23 lakhCloses 20 Nov, 3:00 pm - Same townElectrical30 hours left
Supply and installation of load cells for 100 MT electronic weighbridges in ash silo area, 2x250MW STPS Sarni, MPPGCL
Supply and installation of load cells for electronic weighbridges; 60 days; open tender in two covers; no registration class required
Sarni, Betul district, Madhya Pradesh
Chief Engineer(Gen.)-Satpura Thermal Power Station-Sarni - MPPGCL
₹4.98 lakhCloses 20 Nov, 3:00 pm