Earthen to BT road construction of Tokarva village main road and link roads, Songadh taluka, Tapi, R&B Panchayat Tapi
Read the full title from the noticeHide the full title
MMGSY 2026-27 (Earthen to BT) Construction of Tokarva village main road to Zaradi faliya toward road to Kanubhai home to Dhara faliya to Ramubhai home to Nana Bandharpada Village Joining road Sec-I 0/0 to 0/900, Sec-II 0/0 to 0/670 Ta.Songadh Dist.Tapi.
R&B-Panchayat Division Tapi
Tapi, Tapi district, Gujarat
- Estimated contract value
- ₹1.24 crore
- EMD
- ₹1,25,000
- Bid security, refunded after the bid · Exemption allowed (per portal)
- Tender fee
- ₹3,600
- Paid with the bid, not refunded
- Bids close
- 17 Nov 2026, 6:00 pm IST
Summary
Earthen to BT road from Tokarva village main road to Zaradi faliya and Nana Bandharpada link road, Sections I and II; open tender for 270 days
Work duration 270 days · bids valid 90 days
AI summary. Check the official portal before you bid.
Scope of work
- Roads & bridges
- Work duration
- 270 days
- From the official tender record
Eligibility
Submission checklist
- Bid validity
- 90 days
Documents the portal asks bidders to upload
- Attached Copy of Tender Fee · Preliminary Stage
- Attached Copy of EMD · Preliminary Stage
- Attached Copy of Registration of Class · Preliminary Stage
- Attached Copy of Pan Card & GST Registration · Preliminary Stage
- Attached Copy of Valid Bank Solvency Certificate for Current Calendar year 2026 · Preliminary Stage
- Attached Copy of all Required Documents as per Tender Condition · Preliminary Stage
- Provide any proof of Bid Processing Fee · Documents required For Form - Tender Fee Form
- Provide any proof of EMD Document · Documents required For Form - Emd Fee Form
Commercial terms
Contract value, EMD, tender fee and performance security are separate amounts; they are never added up.
Evaluation
Tender documents
Every file the department published. Unlock this tender to download them.
- PDFLocked
Standard bidding document (SBD)
SBD_Tokarva main road to Zarali.pdf
- PDFLocked
Pricing schedule (BOQ: bill of quantities)
BOQ_ Tokarva main road to Zarali.pdf
- PDFLocked
Technical specification
Specification Tokarva.pdf
- PDFLocked
Standard bidding document (SBD)
SBD_PBMC_OPRC_GR_14-10-26.pdf
- PDFLocked
Terms and conditions of contract
1. Clauses-Terms and Conditions of Contract-B1-04.09.2017 (1).pdf
- PDFLocked
2. ESMP Table and Protection Clause.pdf
2. ESMP Table and Protection Clause.pdf
- PDFLocked
3. SOM and Monitoring Formats (Uploading attachment).pdf
3. SOM and Monitoring Formats (Uploading attachment).pdf
- PDFLocked
4.Clouse 24(iv) 34 and 52.pdf
- PDFLocked
Standard bidding document (SBD)
GR all SBd with Index-1.pdf
- PDFLocked
Standard bidding document (SBD)
GR all SBd with Index-2.pdf
- PDFLocked
Standard bidding document (SBD)
GR all SBd with Index-3.pdf
Key dates
- Published29 Oct 2026, 2:20 pm IST
- Bids accepted from29 Oct 2026, 2:20 pm IST
- Bids close17 Nov 2026, 6:00 pm IST
- Bid opening17 Nov 2026, 6:05 pm IST
Location and buyer
Tapi
Tapi district, Gujarat
Only the district is known; the tender doesn't name the exact site
Changes, clarifications and contacts
Reference
- Tender ID
- 360759
- Reference
- 19 OF 2026-27
- Tender type
- Open
- Source
- Gujarat nProcure (GIL)
- Last updated
- 17 Nov 2026, 6:05 pm IST
Always verify details on the official portal before bidding.
Tenders most like this one
Open Roads & bridges tenders closest to it in work and place
- Roads & bridges4 days left
Earthen to BT road construction of Vadi Bhensrot main road to Tapi faliya and Borisavar joining road, Songadh taluka, Tapi district
Earthen to BT road in three sections (Sec-I 0/0 to 1/400, Sec-II 0/0 to 1/100, Sec-III 0/0 to 0/550) under MMGSY 2025-26 Vanbandhu Kalyan Yojana-2; work period 270 days; open tender
Tapi, Tapi district, Gujarat
R&B-Panchayat Division Tapi
₹1.97 croreCloses 25 Nov, 6:00 pm - Roads & bridges13 days left
Construction of three roads in Songadh taluka, Mota Amlapada and Limbi villages, R&B Panchayat Division Tapi, Gujarat
Three roads totalling 2.450 km under Mukhyamantri Adimjuth Sarvangi Utkarsh Scheme 2023-24; open tender for 270 days
Tapi, Tapi district, Gujarat
R&B-Panchayat Division Tapi
₹1.02 croreCloses 4 Dec, 6:00 pm - Roads & bridges13 days left
Construction of Sadadvel village Kotvaliya faliya road, Songadh taluka, Tapi district, R&B Panchayat Division Tapi, Gujarat
Two sections of Kotvaliya faliya road, Section I Km 0/0 to 0/185 and Section II Km 0/0 to 1/120; open tender for 180 days
Tapi, Tapi district, Gujarat
R&B-Panchayat Division Tapi
₹41.45 lakhCloses 4 Dec, 6:00 pm - Roads & bridges13 days left
Construction of Gusargam village main road to Smashan road, Songadh taluka, Tapi, Gujarat
Road construction from chainage 0/0 to 1/00 under Mukhyamantri Border Village Sarvangi Utkarsh Scheme 2025-26; 180 days; open tender
Tapi, Tapi district, Gujarat
R&B-Panchayat Division Tapi
₹49.65 lakhCloses 4 Dec, 6:00 pm - Roads & bridges12 days left
MMGSY 2026-27 (Earthen to BT) Construction of C.C road on Dholiumara faliya to Lift irrigation joining road Km 0/0 to 0/600 Ta. Uchchhaal Dist.Tapi
Work period 9 months; EMD exemption allowed
Tapi, Tapi district, Gujarat
R&B-Panchayat Division Tapi
₹57.72 lakhCloses 3 Dec, 6:00 pm - Roads & bridges13 days left
Construction of Vanjharda village Dadri faliya to Vad faliya joining road, Songadh taluka, Tapi, Gujarat
Joining road from chainage 0/0 to 0/750 under Mukhyamantri Adimjuth Sarvangi Utkarsh Scheme 2022-23; 180 days; open tender
Tapi, Tapi district, Gujarat
R&B-Panchayat Division Tapi
₹33.19 lakhCloses 4 Dec, 6:00 pm
More open tenders near this one
Within 50 km, nearest first.
- Same townIrrigation & flood control6 hours left
Improvement of Existing Irrigation Infracture works on Donja Minor Ex. ULBBC
Tapi, Tapi district, Gujarat
NWR-Ukai Left Bank Canal Inv. Dn. No. 2 Valod
₹2.37 croreCloses 21 Nov, 6:00 pm - Same townIrrigation & flood control6 hours left
Improvement of Existing Irrigation Infrastructure works on Kaliyari Minor Ex.Ambach Distry
Tapi, Tapi district, Gujarat
NWR-Ukai Left Bank Canal Inv. Dn. No. 2 Valod
₹2.19 croreCloses 21 Nov, 6:00 pm - Same townIrrigation & flood control6 hours left
Improvement of Existing Irrigation Infrastructure works on Sadadvel Left Minor Ex.Bamanvada Minor
Tapi, Tapi district, Gujarat
NWR-Ukai Left Bank Canal Inv. Dn. No. 2 Valod
₹1.79 croreCloses 21 Nov, 6:00 pm - Same townIrrigation & flood control6 hours left
Improvement of Existing Irrigation Infrastructure works on Fadvel Minor Ex.Vandarvela Distry
Tapi, Tapi district, Gujarat
NWR-Ukai Left Bank Canal Inv. Dn. No. 2 Valod
₹2.29 croreCloses 21 Nov, 6:00 pm - Same townIrrigation & flood control6 hours left
Improvement of Existing Irrigation Infrastructure works on Sadadvel Right Minor Ex.Bamanvada Minor
Tapi, Tapi district, Gujarat
NWR-Ukai Left Bank Canal Inv. Dn. No. 2 Valod
₹2.28 croreCloses 21 Nov, 6:00 pm - Same townIrrigation & flood control6 hours left
Improvement of Existing Irrigation Infrastructure works on Kaliyari Sub Minor Ex.Kaliyari Minor
Tapi, Tapi district, Gujarat
NWR-Ukai Left Bank Canal Inv. Dn. No. 2 Valod
₹2.32 croreCloses 21 Nov, 6:00 pm