Constructing Pucca Water Course on SM-14/L Ex Lunej Distributory near Ch. 1690 m
Read the full title from the noticeHide the full title
Constructing Pucca Water Course on SM-14/L Ex Lunej Distributory Near Ch. 1690 m
NWR-Petlad Irrigation Division - Petlad
Gujarat
- Estimated contract value
- ₹12.28 lakh
- EMD
- ₹13,000
- Bid security, refunded after the bid · Exemption allowed (per portal)
- Tender fee
- ₹900
- Paid with the bid, not refunded
- Bids close
- 20 Nov 2026, 6:00 pm IST
- 7 days left
Summary
Work period 6 months; EMD exemption allowed
Work duration 180 days · bids valid 120 days
AI summary — verify on the official portal
Scope of work
- Irrigation & flood control
- Work duration
- 180 days
- From the official tender record
Eligibility
Submission checklist
- Bid validity
- 120 days
Documents the portal asks bidders to upload
- Attach scan copy of tender fee · Preliminary Stage
- Attach scan copy of emd · Preliminary Stage
- PAN card · Preliminary Stage
- GST Number · Preliminary Stage
- 3. Registration Certificate of Appropriate Class–B or above WITH Reg. (R & B and NWRWSKD Only) · Preliminary Stage
- 6. Bid Capacity : It is mandatory to provide information for assessment of bid capacity as per section-1 ,Point-4.7 & 1.4. It is to be provided in the form prescribed in Section-2 point 1.2 & 1.4.Also provided Calculated/derived value of your Bid Capacity as per given formula & attach the calculation sheet for the same. Necessary certificates showing year wise breakup of work done amount, issued by concerned Engineer-in-Charge are required to be attached. · Preliminary Stage
- 7. Annual Turnover (Of Civil Construction Activity Only & Excluidng GST Expense)as Per Section-2 Table1.2 · Preliminary Stage
- 8. Existing Commitment Of Ongoing Work To be Completed(A per Section-02 Table 1.4.) · Preliminary Stage
- 9. Affidavit (As per Section 2 of SBD book ) · Preliminary Stage
- 10. FORM OF BID(as per Section-6 of SBD Book) · Preliminary Stage
- 11. Partnership deed (If Applicable) · Preliminary Stage
- 12. Power of Attorney of the signatory of bid(If Applicable) · Preliminary Stage
- attach scan copy of necessary documents · Preliminary Stage
Commercial terms
Contract value, EMD, tender fee and performance security are separate amounts; they are never added up.
Evaluation
Tender documents
Every file the department published. Unlock this tender to download them.
- PDFLocked
Tender notice (NIT)
Tender Notice 11 of 2026-27 online.pdf
- PDFLocked
1 Front Page.pdf
- PDFLocked
2. Sechedule B Cement Consumption-1.pdf
2. Sechedule B Cement Consumption-1.pdf
- PDFLocked
Technical specification
5 Itemwise Specification.pdf
- PDFLocked
Pricing schedule (BOQ: bill of quantities)
BOQ.pdf
- PDFLocked
Technical specification
Standard Techanical Specification of MIC.pdf
- DOCLocked
2. Notice Inviting online Tender.doc
- DOCLocked
Standard bidding document (SBD)
4.SBD-Documen without PQ-14 L SM.doc
Key dates
- Published6 Nov 2026, 5:00 pm IST
- Bids accepted from6 Nov 2026, 5:00 pm IST
- Bids close20 Nov 2026, 6:00 pm IST
- Bid opening20 Nov 2026, 6:05 pm IST
Location and buyer
Gujarat
The tender doesn't say where the work is
Who issued it
- NWR-Petlad Irrigation Division - Petlad
Changes, clarifications and contacts
Reference
- Tender ID
- 363169
- Reference
- 11 of 2026-27
- Tender type
- Open
- Source
- Gujarat nProcure (GIL)
- Last checked on the portal
- 13 Nov 2026, 12:38 am IST
Always verify details on the official portal before bidding.
Tenders most like this one
Open Irrigation & flood control tenders closest to it in work and place
- Irrigation & flood control12 days left
Construction of a new RCC Canal syphon in place of the existing Canal syphon at Ch.9546 mt & Ch.10020 mt on the Mahisa Distributary
Work period 9 months; EMD exemption allowed
Gujarat
NWR-Shedhi Irrigation Division Nadiad
₹43.57 lakhCloses 25 Nov, 6:00 pm - Irrigation & flood control6 days left
Construction of Gauhan-1 Weir Across Tributary of Purna River near Village Gauhan Ta. Subir district Dang
Work period 11 months; EMD exemption allowed
Gujarat
NWR-VER(2) Project Division, Vyara
₹6.42 croreCloses 19 Nov, 6:00 pm - Irrigation & flood control6 days left
Construction of Nimpada-1 Weir Across Tributary of Purna River near Village Nimpada Ta. Subir district Dang
Work period 11 months; EMD exemption allowed
Gujarat
NWR-VER(2) Project Division, Vyara
₹5.5 croreCloses 19 Nov, 6:00 pm - Irrigation & flood control12 days left
Construction of a new RCC Canal syphon in place of the existing brick masonry Canal syphon at Ch.90 mt & Ch.5490 mt on the Mahisa Distributary
Work period 9 months; EMD exemption allowed
Gujarat
NWR-Shedhi Irrigation Division Nadiad
₹42.4 lakhCloses 25 Nov, 6:00 pm - Irrigation & flood control6 days left
Construction of Ghubita-1 Weir Across Tributary of Purna River near Village: Ghubita Ta. Ahwa district Dang
Work period 11 months; EMD exemption allowed
Gujarat
NWR-VER(2) Project Division, Vyara
₹7.31 croreCloses 19 Nov, 6:00 pm - Irrigation & flood control12 days left
Seepage Prevention Work Between Ch. 15360 to 16160 mt. of Ex. Vad. Distry and Construction of Footbridge Ch. 8550 mt. of Ex. Vadnagar Distributory of SRBMC
Work period 2 months; EMD exemption allowed
Gujarat
NWR-Dharoi Canal Division no 3 Visnagar
₹11.88 lakhCloses 25 Nov, 6:00 pm