Engineering, procurement, and construction (EPC) work for surveying, investigation, designing and construction
Read the full title from the noticeHide the full title
Engineering, procurement, and construction (EPC) work for surveying, investigation, designing and construction of new hydraullic structure (machchhu 4 rubber dam), protection work and other allied works on machchhu river (from downstream of machhu 3 wrp to 15 km and 1.5 km downstream of naranka check dam) taluka maliya (mi), morbi district including operation and maintenance for 10 years.
NWR-Irrigation Division - Morbi
Gujarat
- Estimated contract value
- ₹140.69 crore
- EMD
- ₹1,40,70,000
- Bid security, refunded after the bid · Exemption allowed (per portal)
- Tender fee
- ₹18,000
- Paid with the bid, not refunded
- Bids close
- 27 Nov 2026, 6:00 pm IST
- 13 days left
Summary
Work period 540 days; EMD exemption allowed
Work duration 540 days · bids valid 120 days
AI summary — verify on the official portal
Scope of work
- Irrigation & flood control
- Repair & maintenance
- Work duration
- 540 days
- From the official tender record
Eligibility
Submission checklist
- Bid validity
- 120 days
Documents the portal asks bidders to upload
- Bid Document Fee/Tender Fee · PRELIMINARY STAGE
- EMD · PRELIMINARY STAGE
- Registration Certificate of Appropriate Class · PRELIMINARY STAGE
- GST Number and Pan card · PRELIMINARY STAGE
- ANY OTHER REQUIRED · PRELIMINARY STAGE
- Copy of Partnership Deed or Memorandum as well as Articles of Association · Pre Qualification Stage
- Similar nature of work and O&M work · Pre Qualification Stage
- Power of Attorney (if Applicable) · Pre Qualification Stage
- Last Five Financial Year IT Return. · Pre Qualification Stage
- Key Personnel Detail · Pre Qualification Stage
- Machineries and Equipment Details · Pre Qualification Stage
- Undertaking for Engaging Technical Staff and Machineries · Pre Qualification Stage
- Information regarding any litigation in which the applicant is involved · Pre Qualification Stage
- Last 5-Years Turn Over (year wise) for Civil Engineering Works certified by CA (for Bid Capacity Evaluation)and Details of civil engineering works completed in last 5 financial year. · Pre Qualification Stage
- Details of Existing Commitments and On-Going Works · Pre Qualification Stage
- Undertaking on statement of compliance of clause 3.2 · Pre Qualification Stage
- Affidavit (As per Prescribed Format in SBD) · Pre Qualification Stage
- Form of Bid (As per Prescribed Format Section-6) · Pre Qualification Stage
- Undertaking for bid Validity (As per Prescribed Format Section-8) · Pre Qualification Stage
- ANY OTHER REQUIRED · Pre Qualification Stage
- JV Agreement (If Applicable) (As per Prescribed Format Section-10) · Pre Qualification Stage
- Financial Position Bank Certificate (As Per Prescribed Format Clause 4.5.6 of ITB) · Pre Qualification Stage
- Undertaking for investment · Pre Qualification Stage
- Corporate Debt Restructuring (CDR) / facing recovery proceedings from financial institutions / facing winding up processing / those under BIFR in the last 5 financial year. · Pre Qualification Stage
- Letter of transmittal signed by authorized signatory. · Pre Qualification Stage
- ANY OTHER REQUIRED · Pre Qualification Stage
- Letter of Technical Bid · Techinical Bid Stage
- Technical Bid Online Submission with Contractor Sign · Techinical Bid Stage
- Schedule-I Deviation from Technical Specification · Techinical Bid Stage
- Schedule-II Deviation from Conditions of Contract · Techinical Bid Stage
- Schedule-IIl Deviation from the list of recommended mandatory · Techinical Bid Stage
- Schedule-IV Contractors Functional Guarantees · Techinical Bid Stage
- Affifavit (Technical Bid) · Techinical Bid Stage
- Load List for Power Calculation. · Techinical Bid Stage
- 1-A Data Sheets for Mechanical Guaranteed. · Techinical Bid Stage
- 2-A Data Sheets for Electrical Guaranteed. · Techinical Bid Stage
- ANY OTHER REQUIRED · Techinical Bid Stage
Commercial terms
Contract value, EMD, tender fee and performance security are separate amounts; they are never added up.
Evaluation
Tender documents
Every file the department published. Unlock this tender to download them.
- PDFLocked
Tender notice (NIT)
1. TENDER NOTICE.pdf
- PDFLocked
Technical specification
3. TECHNICAL SPECIFICATION FOR CIVIL WORK-1-150.pdf
- PDFLocked
Technical specification
3. TECHNICAL SPECIFICATION FOR CIVIL WORK-151-258.pdf
- PDFLocked
Technical specification
4. TECHNICAL SPECIFICATION FOR MECHANICAL WORK.pdf
- PDFLocked
Technical specification
5. TECHNICAL SPECIFICATION FOR ELECTRICAL WORK.pdf
- PDFLocked
Technical specification
6. TECHNICAL SPECIFICATION FOR INSTRUMENTS.pdf
- PDFLocked
Technical specification
7. TECHNICAL SPECIFICATION O AND M.pdf
- PDFLocked
Drawings / layout
9. DRAWING-1.pdf
- PDFLocked
Drawings / layout
9. DRAWING-2.pdf
- PDFLocked
Drawings / layout
9. DRAWING-3-10.pdf
- PDFLocked
Drawings / layout
9. DRAWING-11-19.pdf
- PDFLocked
Pricing schedule (BOQ: bill of quantities)
8. PRICE SCHEDULE.pdf
- PDFLocked
Standard bidding document (SBD)
2. SBD-1-80.pdf
- PDFLocked
Standard bidding document (SBD)
2. SBD-81-161.pdf
Key dates
- Published8 Nov 2026, 5:00 pm IST
- Bids accepted from8 Nov 2026, 5:00 pm IST
- Bids close27 Nov 2026, 6:00 pm IST
- Bid opening30 Nov 2026, 12:00 pm IST
Location and buyer
Gujarat
The tender doesn't say where the work is
Changes, clarifications and contacts
Reference
- Tender ID
- 364934
- Reference
- SBD NO 19 OF 2026-27
- Tender type
- Open
- Source
- Gujarat nProcure (GIL)
- Last checked on the portal
- 13 Nov 2026, 3:36 am IST
Always verify details on the official portal before bidding.
Tenders most like this one
Open Irrigation & flood control tenders closest to it in work and place
- Irrigation & flood control3 days left
Engineering, Procurement, and Construction (EPC) Contract for providing Lift Irrigation scheme by connecting ponds of 18 Villages
Covers 18 villages; work period 540 days; EMD exemption allowed
Gujarat
SSNNL-KBC Dn 3/1 - Tharad
₹79.96 croreCloses 17 Nov, 6:00 pm - Irrigation & flood control13 days left
Engineering, Procurement and Construction (EPC) work for Integrated Irrigation, Drainage and Water Infrastructure Modernization Project
Work period 540 days; EMD exemption allowed
Gujarat
NWR-Salinity Control Division Porbandar
₹60.1 croreCloses 27 Nov, 6:00 pm - Irrigation & flood control4 days left
Works of water Distribution, water management & Operation with Continuous Patrolling & vigilant inspection on Kachchh Branch Canal and Network
Work period 2 years
Gujarat
SSNNL-KBC Division No. 2/4 Bhachau
₹1.2 croreCloses 18 Nov, 6:30 pm - Irrigation & flood control2 days left
Works of water distribution, water management & operation with continuous patrolling & vigilant inspection on kachchh branch canal and network
Work period 720 days; EMD exemption allowed
Gujarat
SSNNL-KBC Division No 2-6 Bhachau
₹1 croreCloses 16 Nov, 6:00 pm - Irrigation & flood control3 days left
Yearly Unit Rate for Providing Consultancy Services for Carrying Out Survey Works and Collecting the Samples and Testing the Same for Canal, Dam, Checkdam
Work period 12 months
Gujarat
NWR-Salinity Control Division Jam-Khambhalia
EMD ₹1 lakhCloses 17 Nov, 6:00 pm - Irrigation & flood control2 days left
Works of water Distribution, water management & Operation with Continuous Patrolling & vigilant inspection on Wandhiya Sub Branch Canal and its Network
Work period 720 days; EMD exemption allowed
Gujarat
SSNNL-KBC Division No 2-6 Bhachau
₹1.36 croreCloses 16 Nov, 6:30 pm